Argyll and Bute Council

RECOMMENDATIONS ARISING FROM SHORT LIFE WORKING GROUP - ROAD DEFECTS AND RESPONSE TIMES

Agreed Committee 1 paper

SHORT LIFE WORKING GROUP - ROADS ASSET MANAGEMENT AND MAINTENANCE STRATEGY agreed this item on Tuesday 2 April 2013. Below is the council's own wording, with the papers it was decided on.

Item5

Resolved

Decision Agreed that the report be put forward for consideration by the Council by the Executive Director of Development and Infrastructure Services in consultation with the Chair of the Short Life Working Group subject to inclusion of background context and the following alterations:- Clarification on references to CoP as in previous report. Clarification on what is meant by an approved method and standard to be included in the report. An indication of the performance measures to be recorded in the Pyramid system to be included in the report. The wording at 4.3 to be reflected also in paragraph 2.3 (Reference: Report by Head of Roads and Amenity Services dated March 2013, submitted)
Word for word from the decision Argyll and Bute published for this meeting. Source: www.argyll-bute.gov.uk

Follow this further

Built from Argyll and Bute's papers

What the report saysPro

Report to SHORT LIFE WORKING GROUP - ROADS ASSET MANAGEMENT AND MAINTENANCE STRATEGY

ARGYLL & BUTE COUNCIL COUNCIL

DEVELOPMENT& INFRASTRUCTURE APRIL 2013

ROAD DEFECTS AND RESPONSE TIMES

1. Summary This report discusses road defect definition and response times in the context of a risk management and long term value for money approach. The Short Life Working Group-Roads Asset Management and Maintenance Strategy (SLWG) met on 11 March 2013 and agreed to make the following recommendations to the Council.

2. Recommendations 2.1 That the Council approves the proposed Category 1 pothole definitions. 2.2 That the Council approves the maximum response time for Category 1 defects being increased to 5 working days to facilitate more economic use of resources and higher quality repairs . 2.3 That this revised approach should be supported by a publicity strategy. . 3. Background 3.1 In 2004 Argyll and Bute Council produced its Roads Maintenance and Asset Management Plan (RMAMP) based on guidance in “Well Maintained Highways – a code of practice for highway maintenance management.” (CoP)

3.2This document included definitions of Category 1 and Category 2 defects and response times for dealing with these categories of defect.

3.3Category 1 (Cat 1) defects were described in the CoP as requiring to be made safe immediately if practicable and, in any case, within 24 hours. Our RMAMP amended this to the end of the next working day. (Making safe can be by permanent repair, temporary repair or by signing and guarding.)

3.4In practice, most Cat 1 defects identified in roads inspections are potholes. These are also, particularly in late winter and spring, the defects which cause most concern to road users and give rise to most insurance claims.

3.5Studies by the Highways Maintenance Efficiency Programme and by ADEPT (the association representing chief roads officers in England) have identified the need to improve quality of pothole repairs by carrying out permanent patches. These provide much longer life with better value for money than multiple temporary repairs and give improved customer satisfaction.

3.6In order to support the greater use of first time permanent or Right First Time repairs it is proposed to revise the definition of Cat 1 potholes to better reflect the risk associated with them, and to allow more time for the repair to be carried out.

3.7Lengthened response time will allow time to plan and mobilise resources to carry out a Right First Time permanent patch. For example, Northamptonshire County Council lengthened their Cat 1 response time from 24 hours to 5 days to allow more repairs to be Right First Time. As a result they have made an annual saving of £300,000 and have also improved customer satisfaction. Some authorities are wary about adopting this approach, as it is felt that by departing from the CoP recommendations they will be more open to insurance claims. (The most common defence to claims arising from pothole damage is that roads were inspected in accordance with our RMAMP and that repairs were carried out within the timescales in the RMAMP which are based on the CoP.) However as we make no reference to the CoP in our repudiation of claims it is not obvious that this risk is as high as is perceived. Our present “end of the next working day” timescale can result in Cat 1 potholes identified on Friday morning being repaired on Monday afternoon – more than 3 days. Allowing up to 5 days to ensure a better quality repair should be an acceptable increase in risk.

3.8Definitions can better reflect risk by taking more account of the speed and volume of traffic. In Table 1 below showing the existing and proposed definitions of Cat 1 potholes, Ranks 1 to 3 indicate where the road sits in our Road Hierarchy. Generally, traffic volumes should be expected to increase as we move from Rank 3 to Rank 1. Table 1. 2004 Cat 1 pothole definition. Defect 2004 Category 1 Pothole Definition

Potholes Rank 1, 2, 2a Roads If >40mm deep and >150mm dia on carriageway If > 100mm deep and > 150mm dia then 2 hr response

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
RECOMMENDATIONS ARISING FROM SHORT LIFE WORKING GROUP: ROAD DEFECTS AND RESPONSE TIMESReport 73 KB DownloadRead as text

At this meeting

Whole meeting
3MINUTESOn the agenda 4RECOMMENDATIONS ARISING FROM SHORT LIFE WORKING GROUP - ROADS HIERARCHYAgreed
5RECOMMENDATIONS ARISING FROM SHORT LIFE WORKING GROUP - ROAD DEFECTS AND RESPONSE TIMESThis decision

Who was there

3 of 5 attended
MD
Councillor Mary-Jean DevonMember, apologies
DM
Councillor Duncan MacIntyreMember, present
RG
Councillor Robert Graham MacIntyreMember, apologies
EM
Councillor Ellen MortonMember, present
JS
Councillor John SempleMember, present

On this subject at Argyll and Bute

Search all
  1. RECOMMENDATIONS ARISING FROM SHORT LIFE WORKING GROUP - ROAD DEFECTS AND RESPONSE TIMESThis decision
  2. Recommendations arising from short life working group - roads hierarchyAgreed
  3. Recommendations arising from short life working group - media platformsAgreed

More from Argyll and Bute SHORT LIFE WORKING GROUP - ROADS ASSET MANAGEMENT AND MAINTENANCE STRATEGY

All decisions
MeetingDecisionOutcome
2 Apr 2013 Recommendations arising from short life working group - roads hierarchyDecision Agreed that the report be put forward for consideration by the Council by the Executive Director of Developm... Agreed Open
11 Mar 2013 Alternative options for the allocation of capital fundingDecision The Short Life Working Group noted the demonstration they were given on the WDM system. (Reference: Demonstr... Noted Open
11 Mar 2013 Roads asset management plan and roads hierarchyDecision The Short Life Working Group - In terms of roads hierarchy; agreed to recommend to the Council - To adopt th... Agreed Open
11 Mar 2013 Roads maintenance planDecision The Short Life Working Group noted the report. (Reference: Report by Head of Roads and Amenity Services date... Noted Open
11 Mar 2013 Roads asset life cycle planningDecision The Short Life Working Group noted the demonstration. (Reference: Demonstration by Jamie McLafferty, Technic... Noted Open