SHORT LIFE WORKING GROUP - ROADS ASSET MANAGEMENT AND MAINTENANCE STRATEGY agreed this item on Tuesday 2 April 2013. Below is the council's own wording, with the papers it was decided on.
Decision Agreed that the report be put forward for consideration by the Council by the Executive Director of Development and Infrastructure Services in consultation with the Chair of the Short Life Working Group subject to inclusion of background context and the following alterations:- Clarification on references to CoP as in previous report. Clarification on what is meant by an approved method and standard to be included in the report. An indication of the performance measures to be recorded in the Pyramid system to be included in the report. The wording at 4.3 to be reflected also in paragraph 2.3 (Reference: Report by Head of Roads and Amenity Services dated March 2013, submitted)
Word for word from the decision Argyll and Bute published for this meeting.Source: www.argyll-bute.gov.uk
Report to SHORT LIFE WORKING GROUP - ROADS ASSET MANAGEMENT AND MAINTENANCE STRATEGY
ARGYLL & BUTE COUNCIL COUNCIL
DEVELOPMENT& INFRASTRUCTURE APRIL 2013
ROAD DEFECTS AND RESPONSE TIMES
1. Summary This report discusses road defect definition and response times in the context of a risk management and long term value for money approach. The Short Life Working Group-Roads Asset Management and Maintenance Strategy (SLWG) met on 11 March 2013 and agreed to make the following recommendations to the Council.
2. Recommendations 2.1 That the Council approves the proposed Category 1 pothole definitions. 2.2 That the Council approves the maximum response time for Category 1 defects being increased to 5 working days to facilitate more economic use of resources and higher quality repairs . 2.3 That this revised approach should be supported by a publicity strategy. . 3. Background 3.1 In 2004 Argyll and Bute Council produced its Roads Maintenance and Asset Management Plan (RMAMP) based on guidance in “Well Maintained Highways – a code of practice for highway maintenance management.” (CoP)
3.2This document included definitions of Category 1 and Category 2 defects and response times for dealing with these categories of defect.
3.3Category 1 (Cat 1) defects were described in the CoP as requiring to be made safe immediately if practicable and, in any case, within 24 hours. Our RMAMP amended this to the end of the next working day. (Making safe can be by permanent repair, temporary repair or by signing and guarding.)
3.4In practice, most Cat 1 defects identified in roads inspections are potholes. These are also, particularly in late winter and spring, the defects which cause most concern to road users and give rise to most insurance claims.
3.5Studies by the Highways Maintenance Efficiency Programme and by ADEPT (the association representing chief roads officers in England) have identified the need to improve quality of pothole repairs by carrying out permanent patches. These provide much longer life with better value for money than multiple temporary repairs and give improved customer satisfaction.
3.6In order to support the greater use of first time permanent or Right First Time repairs it is proposed to revise the definition of Cat 1 potholes to better reflect the risk associated with them, and to allow more time for the repair to be carried out.
3.7Lengthened response time will allow time to plan and mobilise resources to carry out a Right First Time permanent patch. For example, Northamptonshire County Council lengthened their Cat 1 response time from 24 hours to 5 days to allow more repairs to be Right First Time. As a result they have made an annual saving of £300,000 and have also improved customer satisfaction. Some authorities are wary about adopting this approach, as it is felt that by departing from the CoP recommendations they will be more open to insurance claims. (The most common defence to claims arising from pothole damage is that roads were inspected in accordance with our RMAMP and that repairs were carried out within the timescales in the RMAMP which are based on the CoP.) However as we make no reference to the CoP in our repudiation of claims it is not obvious that this risk is as high as is perceived. Our present “end of the next working day” timescale can result in Cat 1 potholes identified on Friday morning being repaired on Monday afternoon – more than 3 days. Allowing up to 5 days to ensure a better quality repair should be an acceptable increase in risk.
3.8Definitions can better reflect risk by taking more account of the speed and volume of traffic. In Table 1 below showing the existing and proposed definitions of Cat 1 potholes, Ranks 1 to 3 indicate where the road sits in our Road Hierarchy. Generally, traffic volumes should be expected to increase as we move from Rank 3 to Rank 1. Table 1. 2004 Cat 1 pothole definition. Defect 2004 Category 1 Pothole Definition
Potholes Rank 1, 2, 2a Roads If >40mm deep and >150mm dia on carriageway If > 100mm deep and > 150mm dia then 2 hr response
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Follow SHORT LIFE WORKING GROUP - ROADS ASSET MANAGEMENT AND MAINTENANCE STRATEGY at Argyll and Bute and we tell you when its next papers are published, before the meeting rather than after it.
Roads asset life cycle planningDecision The Short Life Working Group noted the demonstration. (Reference: Demonstration by Jamie McLafferty, Technic...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.