RECOMMENDATIONS ARISING FROM SHORT LIFE WORKING GROUP - ROADS HIERARCHY

Agreed Committee 1 paper

SHORT LIFE WORKING GROUP - ROADS ASSET MANAGEMENT AND MAINTENANCE STRATEGY agreed this item on Tuesday 2 April 2013. Below is the council's own wording, with the papers it was decided on.

Item4

Resolved

Decision Agreed that the report be put forward for consideration by the Council by the Executive Director of Development and Infrastructure Services in consultation with the Chair of the Short Life Working Group subject to inclusion of background context and the following alterations:- 1. Alter “( CoP )” under paragraph 3.1 and 3.6 to clarify reference to Code of Practice. 2. Alteration of paragraph 3.10 taking into account the annual review of the roads hierarchy, the annual review of the roads strategy with links to the budget and the 3 to 5 year review of the roads hierarchy framework. (Reference: Report by Head of Roads and Amenity Services dated March 2013, submitted)
Word for word from the decision Argyll and Bute published for this meeting. Source: www.argyll-bute.gov.uk

Follow this further

Built from Argyll and Bute's papers

What the report saysPro

Report to SHORT LIFE WORKING GROUP - ROADS ASSET MANAGEMENT AND MAINTENANCE STRATEGY

ARGYLL & BUTE COUNCIL COUNCIL

DEVELOPMENT& INFRASTRUCTURE APRIL 2013

ROAD HIERARCHY

1. Summary This report explains the Roads Hierarchy and asks the Council to approve changes to the existing hierarchy which was developed in 2004. The Short Life Working Group-Roads Asset Management and Maintenance Strategy(SLWG) met on 11 March 2013 and agreed to make the following recommendations to the Council.

2. Recommendations 2.1 That the Council approves the revised Roads Hierarchy subject to it being periodically reviewed as noted in 3.10 below. 2.2 That the Council instructs Officers tp re-categorise the roads in Argyll and Bute into this hierarchy for consideration by the four Area Committees before September 2013. 2.3 That the Council suspend operation of the Short Life Working Group until such time as the new roads hierarchy has been considered by the four Area Committees and thereafter the Short Life Working Group would take into consideration the new hierarchy and comments by Area Committees with a view to assessing the effects on the budget process and the prioritisation of capital funding for the financial year 2014/15. . 3. Background 3.1 In 2004 Argyll and Bute Council produced its Roads Maintenance and Asset Management Strategy based on guidance in “Well Maintained Highways – a code of practice for highway maintenance management.” (CoP)

3.2A major component of this document was the Roads Hierarchy. This is an allocation of roads into groups containing roads with similar functions and risks.

3.3A road whose function is to move large numbers of vehicles including HGVs over longer distances requires a different approach than does a road carrying small numbers of mainly cars over short distances. Intervention levels and types of surface treatment would be different for these two types of roads.

3.4As an example of risk, Road A may have high numbers of vehicles travelling at high speed. Road B could have a large numbers of vehicles travelling at low speeds. A 50mm deep pothole in Road A would be a considerable hazard requiring urgent attention. The same pothole in Road B would be a lesser risk and could have a higher quality repair carried out less quickly. Inspection intervals, response times and types of repair are risk based and would be different for different types of road.

Table 1 Risk Matrix Risk Comparism Road Traffic Traffic Risk Volume Speed A H H High B H L Medium C L L Low 3.5 The Road Hierarchy was therefore developed in order that similar types of road can be managed and maintained in a similar and consistent fashion. 3.6 The CoP provided a table showing a possible hierarchy with five levels, as a reference point. Argyll and Bute Council simplified this and produced a hierarchy with three levels.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
RECOMMENDATIONS ARISING FROM SHORT LIFE WORKING GROUP: ROADS HIERARCHYReport 93 KB DownloadRead as text

At this meeting

Whole meeting
3MINUTESOn the agenda
4RECOMMENDATIONS ARISING FROM SHORT LIFE WORKING GROUP - ROADS HIERARCHYThis decision
5RECOMMENDATIONS ARISING FROM SHORT LIFE WORKING GROUP - ROAD DEFECTS AND RESPONSE TIMESAgreed

Who was there

3 of 5 attended
MD
Councillor Mary-Jean DevonMember, apologies
DM
Councillor Duncan MacIntyreMember, present
RG
Councillor Robert Graham MacIntyreMember, apologies
EM
Councillor Ellen MortonMember, present
JS
Councillor John SempleMember, present

On this subject at Argyll and Bute

Search all
  1. RECOMMENDATIONS ARISING FROM SHORT LIFE WORKING GROUP - ROADS HIERARCHYThis decision
  2. Recommendations arising from short life working group - road defects and response timesAgreed
  3. Recommendations arising from short life working group - media platformsAgreed

More from Argyll and Bute SHORT LIFE WORKING GROUP - ROADS ASSET MANAGEMENT AND MAINTENANCE STRATEGY

All decisions
MeetingDecisionOutcome
2 Apr 2013 Recommendations arising from short life working group - road defects and response timesDecision Agreed that the report be put forward for consideration by the Council by the Executive Director of Developm... Agreed Open
11 Mar 2013 Alternative options for the allocation of capital fundingDecision The Short Life Working Group noted the demonstration they were given on the WDM system. (Reference: Demonstr... Noted Open
11 Mar 2013 Roads asset management plan and roads hierarchyDecision The Short Life Working Group - In terms of roads hierarchy; agreed to recommend to the Council - To adopt th... Agreed Open
11 Mar 2013 Roads maintenance planDecision The Short Life Working Group noted the report. (Reference: Report by Head of Roads and Amenity Services date... Noted Open
11 Mar 2013 Roads asset life cycle planningDecision The Short Life Working Group noted the demonstration. (Reference: Demonstration by Jamie McLafferty, Technic... Noted Open