RECOMMENDATIONS ARISING FROM SHORT LIFE WORKING GROUP - ROADS HIERARCHY
AgreedCommittee1 paper
SHORT LIFE WORKING GROUP - ROADS ASSET MANAGEMENT AND MAINTENANCE STRATEGY agreed this item on Tuesday 2 April 2013. Below is the council's own wording, with the papers it was decided on.
Decision Agreed that the report be put forward for consideration by the Council by the Executive Director of Development and Infrastructure Services in consultation with the Chair of the Short Life Working Group subject to inclusion of background context and the following alterations:- 1. Alter “( CoP )” under paragraph 3.1 and 3.6 to clarify reference to Code of Practice. 2. Alteration of paragraph 3.10 taking into account the annual review of the roads hierarchy, the annual review of the roads strategy with links to the budget and the 3 to 5 year review of the roads hierarchy framework. (Reference: Report by Head of Roads and Amenity Services dated March 2013, submitted)
Word for word from the decision Argyll and Bute published for this meeting.Source: www.argyll-bute.gov.uk
Report to SHORT LIFE WORKING GROUP - ROADS ASSET MANAGEMENT AND MAINTENANCE STRATEGY
ARGYLL & BUTE COUNCIL COUNCIL
DEVELOPMENT& INFRASTRUCTURE APRIL 2013
ROAD HIERARCHY
1. Summary This report explains the Roads Hierarchy and asks the Council to approve changes to the existing hierarchy which was developed in 2004. The Short Life Working Group-Roads Asset Management and Maintenance Strategy(SLWG) met on 11 March 2013 and agreed to make the following recommendations to the Council.
2. Recommendations 2.1 That the Council approves the revised Roads Hierarchy subject to it being periodically reviewed as noted in 3.10 below. 2.2 That the Council instructs Officers tp re-categorise the roads in Argyll and Bute into this hierarchy for consideration by the four Area Committees before September 2013. 2.3 That the Council suspend operation of the Short Life Working Group until such time as the new roads hierarchy has been considered by the four Area Committees and thereafter the Short Life Working Group would take into consideration the new hierarchy and comments by Area Committees with a view to assessing the effects on the budget process and the prioritisation of capital funding for the financial year 2014/15. . 3. Background 3.1 In 2004 Argyll and Bute Council produced its Roads Maintenance and Asset Management Strategy based on guidance in “Well Maintained Highways – a code of practice for highway maintenance management.” (CoP)
3.2A major component of this document was the Roads Hierarchy. This is an allocation of roads into groups containing roads with similar functions and risks.
3.3A road whose function is to move large numbers of vehicles including HGVs over longer distances requires a different approach than does a road carrying small numbers of mainly cars over short distances. Intervention levels and types of surface treatment would be different for these two types of roads.
3.4As an example of risk, Road A may have high numbers of vehicles travelling at high speed. Road B could have a large numbers of vehicles travelling at low speeds. A 50mm deep pothole in Road A would be a considerable hazard requiring urgent attention. The same pothole in Road B would be a lesser risk and could have a higher quality repair carried out less quickly. Inspection intervals, response times and types of repair are risk based and would be different for different types of road.
Table 1 Risk Matrix Risk Comparism Road Traffic Traffic Risk Volume Speed A H H High B H L Medium C L L Low 3.5 The Road Hierarchy was therefore developed in order that similar types of road can be managed and maintained in a similar and consistent fashion. 3.6 The CoP provided a table showing a possible hierarchy with five levels, as a reference point. Argyll and Bute Council simplified this and produced a hierarchy with three levels.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Follow SHORT LIFE WORKING GROUP - ROADS ASSET MANAGEMENT AND MAINTENANCE STRATEGY at Argyll and Bute and we tell you when its next papers are published, before the meeting rather than after it.
Roads asset life cycle planningDecision The Short Life Working Group noted the demonstration. (Reference: Demonstration by Jamie McLafferty, Technic...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.