CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Mar19Thursday

Environment, Development and Infrastructure Committee

Argyll and ButeHeldPapers from www.argyll-bute.gov.uk
Thursday 19 March 2026, 10.30amHeld 246 days ago.
on a hybrid basis in the Council ChamberKilmory, Lochgilphead and by Microsoft Teams. Open to the public.
21 items, 18 papersAbout 11 MB, led by UPDATE ON THE REVIEW OF PUBLIC AND SCHOOL TRANSPORT.
No exempt items listedEvery item is due to be heard in public.
This meeting was held19 March 2026
21items
18papers
15decisions
–exempt
Running order, sized by papersItem 1 to 18
ReportsProcedureExempt parts

AI summaryWhat the committee decided

Checked against 17 papers PDF briefing Pro

The Environment, Development and Infrastructure Committee endorsed a £12 million roads reconstruction programme for 2026-27, agreed a cross-party response to the loss of £1.417 million in UK Shared Prosperity Fund funding, and approved keeping charges at four public toilets while reverting five others to free entry with honesty boxes.

15decisions 4agreed11noted 11with money Topicstransport, regeneration, governance, finance, leisure
4
Agreed
Withdrawal of uk shared prosperity fundingArgyll and Bute Council's Environment, Development and Infrastructure Committee agreed a cross-party response to the UK Government over the loss of £1.417 million in annual UK Shared Prosperity Fund funding, with no Local Growth Fund allocation for the next three years.
£1.42mPlus no Local Growth Fund for next 3 years
Read in full
5
Noted
Film in argyll - screen sector update reportArgyll and Bute's Environment, Development and Infrastructure Committee noted the Film in Argyll service supported 29 productions and 90 enquiries in 2025, generating an estimated local production spend of £4.8 million, more than triple 2024's £1.4 million.
£4.8mEstimated local production spend, January to December 2025
Read in full
6
Noted
Latest update on the settlement project support officer actionsArgyll and Bute's Environment, Development and Infrastructure Committee noted progress on Settlement Project Support Officer actions tackling population decline, and agreed a further update in December 2026. A £22,500 funding bid has been submitted to the Scottish Government.
£22,500To Scottish Government for 2026/27 SPSO funding
Read in full
7
Noted
Update on the argyll and the isles strategic tourism partnership's tourism strategy for argyll and buteArgyll and Bute councillors noted the background to the area tourism strategy and endorsed officer work to refresh it for 2025-28, with an ambition to grow the visitor economy to £1bn by 2028.
£1bnCurrent impact reported as £771.15m in 2024
Read in full
8
Noted
Transformational projects and regeneration team - large scale project update reportArgyll and Bute's Environment, Development and Infrastructure Committee noted progress on over £100m of externally funded regeneration projects, including the Rural Growth Deal and Community Regeneration Partnership. Further updates on pending funding bids will return to the committee.
£100mCumulative projects and grants managed
Read in full
9
Noted
Public convenience door access control projectArgyll and Bute EDI Committee approves keeping charges at four well used public toilets and reverting five others to free entry with honesty boxes, holding over around £150,000 of unspent funding.
£150kFrom original £300,000 programme
Read in full
10
Noted
Electric vehicle charging strategy - progress and proposed delivery modelArgyll and Bute Council's Environment, Development and Infrastructure Committee approved continued development of Phase One electric vehicle charging hubs within an £833,000 delivery budget, retained £73,482 for Islay, and asked officers to return with a preferred procurement model.
£833,000Phase One funded from £1.033million EVIF
Read in full
11
Noted
Update on the review of public and school transportArgyll and Bute councillors agreed to keep current school and public transport delivery arrangements, accepting a Systra review finding this the most viable option, and backed an action plan to improve services.
£8.49mCurrent annual budget for school and public transport
Read in full
12
Noted
Review of roads and infrastructure services - updateArgyll and Bute's Environment, Development and Infrastructure Committee noted progress on the Roads and Infrastructure Services Review, with most of 119 recommendations either delivered, underway or not being taken forward due to the council's rural context.
£3mFrom closing Helensburgh WTS project and waste contract
Read in full
13
Noted
Update on measures to protect against rockfalls on b8035, gribun, mullArgyll and Bute councillors back targeted cliff scaling at Gribun, Mull, and recommend £0.300m Crown Estates transfer plus £0.200m for 2026/27.
£0.300mFrom Crown Estates fund, subject to Policy and Resources approval
Read in full
14
Agreed
Project 20 - request to progress to implementationArgyll and Bute's Environment, Development and Infrastructure Committee agreed Project 20 can proceed with speed restriction Temporary Traffic Regulation Orders, starting in Helensburgh and Lomond in the first quarter of 2026/27.
–
Read in full
15
Noted
Cemetery development programme - progress report 2025/26Argyll and Bute councillors noted progress on four cemetery extensions, backed further archaeological work at Calgary, and asked members to help find burial land in Cowal and Mull.
–
Read in full
16
Agreed
Roads capital reconstruction programme 2026-27Argyll and Bute's EDI Committee endorsed a £12M roads capital reconstruction programme for 2026-27, with five named funding pots and a £900K allocation to be finalised in June 2026.
£12mSplit across five budget lines for 2026-27
Read in full
17
Agreed
Notice of motion under standing order 14Argyll and Bute's Environment, Development and Infrastructure Committee agreed the terms of a motion at its March 2026 meeting. The papers supplied do not set out what the motion covers.
–
Read in full
18
Noted
Environment, development and infrastructure committee work plan 2026/27Argyll and Bute's environment, development and infrastructure committee noted its 2026/27 work plan, which schedules reports on roads, waste, economic growth and other matters through to December 2026.
–
Read in full
Written by AI from the council's own reports and checked against them before publishing. Each decision page shows the sources, paragraph by paragraph.Report a problem

The agenda, item by item

What the committee will consider, in order, with every paper attached to its item. UPDATE ON THE REVIEW OF PUBLIC AND SCHOOL TRANSPORT is the main business.

1
Procedure

APOLOGIES FOR ABSENCE

2
Procedure

The Committee Manager read out a Motion received in

accordance with Standing Order 14. The Chair, being satisfied that the Motion was urgent, given the 1 April 2026 deadline for submitting a letter of support on behalf of the council to Highlands and Island Regional Transport Partnership funding request to the UK Government’s Green Aviation Programme, moved that it be considered, and the Committee agreed to do so following discussion of agenda item 16 (Roads Capital...

2
Procedure

DECLARATIONS OF INTEREST

3
Report

MINUTES

Environment, Development and Infrastructure Committee held on 18 December 2025

1 paper, 205 KBSearch inside with Pro
ReportMINUTES205 KBDownload
4
Report

WITHDRAWAL OF UK SHARED PROSPERITY FUNDING

Report by Executive Director with responsibility for Development and Economic Growth

Decision: Decision The Environment, Development and Infrastructure Committee considered and agreed a collective, cross-party response on behalf of Argyll and Bute Council to the Secretary of State for Scotland, based on the HIREP response (as contained in Appendix 3 of the report), further to the notification by the UK Government that there would be no Local Growth Fund allocation to Argyll and Bute for the next 3 financial years. (Reference: Report by Executive Director with responsibility for... Decision page

1 paper, 370 KBSearch inside with Pro
ReportWITHDRAWAL OF UK SHARED PROSPERITY FUNDING370 KBDownload
5
Report

FILM IN ARGYLL - SCREEN SECTOR UPDATE REPORT

Report by Executive Director with responsibility for Development and Economic Growth

Decision: Decision The Environment, Development and Infrastructure Committee: 1. noted the contents of the report; and 2. noted the continued positive economic impact the screen sector has on Argyll and Bute. (Reference: Report by Executive Director with responsibility for Development and Economic Growth, dated 26 January 2026, submitted) Decision page

1 paper, 180 KBSearch inside with Pro
ReportFILM IN ARGYLL: SCREEN SECTOR UPDATE REPORT180 KBDownload
6
Report

LATEST UPDATE ON THE SETTLEMENT PROJECT SUPPORT OFFICER ACTIONS

Report by Executive Director with responsibility for Development and Economic Growth

Decision: Decision The Environment, Development and Infrastructure Committee: 1. noted that the report highlighted the progress of actions to date; 2. reviewed the Settlement Project Support Officer actions and updates; and 3. agreed that a further report would be provided to the Committee in December 2026. (Reference: Report by Executive Director with responsibility for Development and Economic Growth, dated 19 March 2026, submitted) Decision page

1 paper, 361 KBSearch inside with Pro
ReportLATEST UPDATE ON THE SETTLEMENT PROJECT SUPPORT OFFICER ACTIONS361 KBDownload
7
Report

UPDATE ON THE ARGYLL AND THE ISLES STRATEGIC TOURISM PARTNERSHIP'S TOURISM STRATEGY FOR ARGYLL AND BUTE

Report by Executive Director with responsibility for Development and Economic Growth

Decision: Decision The Environment, Development and Infrastructure Committee: 1. noted the background to the Argyll and the Isles Strategic Tourism Partnership Strategy ; and 2. endorsed the work of officers to work in partnership with the Argyll and the Isles Strategic Tourism Partnership to refresh the content of the Argyll and the Isles Strategic Tourism Partnership Tourism Strategy 2025-28. (Reference: Report by Executive Director with responsibility for Development and Economic Growth, dated 10... Decision page

1 paper, 142 KBSearch inside with Pro
ReportUPDATE ON THE ARGYLL AND THE ISLES STRATEGIC TOURISM PARTNERSHIP'S TOURISM STRATEGY FOR ARGYLL AND BUTE142 KBDownload
8
Report

TRANSFORMATIONAL PROJECTS AND REGENERATION TEAM - LARGE SCALE PROJECT UPDATE REPORT

Report by Executive Director with responsibility for Development and Economic Growth

Decision: Decision The Environment, Development and Infrastructure Committee: 1. considered the current progress contained within the report; and 2. noted that further updates relating to pending funding bids would be brought back to the Environment, Development and Infrastructure Committee in due course to update Members. (Reference: Report by Executive Director with responsibility for Development and Economic Growth, dated March 2026, submitted) * Decision page

1 paper, 295 KBSearch inside with Pro
ReportTRANSFORMATIONAL PROJECTS AND REGENERATION TEAM: LARGE SCALE PROJECT UPDATE REPORT295 KBDownload
9
Report

PUBLIC CONVENIENCE DOOR ACCESS CONTROL PROJECT

Report by Executive Director with responsibility for Roads and Infrastructure

Decision: Decision The Environment, Development and Infrastructure Committee: 1. noted the outcomes of the review of the door-access charging systems, undertaken following the Committee decision of June 2024 to pause the rollout pending assessment of system reliability and income performance; 2. approved the proposal to retain charging at the four higher-performing sites (Inveraray, Helensburgh, Ardrishaig and Lochgilphead), where income levels remain sustainable and operational performance is... Decision page

1 paper, 191 KBSearch inside with Pro
ReportPUBLIC CONVENIENCE DOOR ACCESS CONTROL PROJECT191 KBDownload
10
Report

ELECTRIC VEHICLE CHARGING STRATEGY - PROGRESS AND PROPOSED DELIVERY MODEL

Report by Executive Director with responsibility for Roads and Infrastructure

Decision: Decision The Environment, Development and Infrastructure Committee: 1. noted the progress made to date on the assessment of proposed hub locations, existing network provision, site deliverability, and indicative costs for Phase One of the Electric Vehicle Charging Strategy; 2. approved the continued development of Phase One hub sites as identified through the updated hub appraisal, confirming that delivery remains within the approved Electric Vehicle Infrastructure Fund allocation; 3. agreed... Decision page

1 paper, 256 KBSearch inside with Pro
ReportELECTRIC VEHICLE CHARGING STRATEGY: PROGRESS AND PROPOSED DELIVERY MODEL256 KBDownload
12
Procedure

Councillor Iain Shonny Paterson left the meeting at 12:14pm,

during discussion of agenda item 11 (Update on the Review of Public and School Transport).

11
ReportMain business

UPDATE ON THE REVIEW OF PUBLIC AND SCHOOL TRANSPORT

Report by Executive Director with responsibility for Development and Infrastructure Services

Decision: Decision The Environment, Development and Infrastructure Committee: 1. noted that the council’s existing service delivery arrangements are currently the most viable option; 2. agreed that officers continue to review service provision with contractors and the council’s own team to ensure that school and public transport services continue to deliver best value for the council; 3. noted the options for reducing costs identified at paragraph 4.11b of the report; 4. agreed that officers review the... Decision page

2 papers, 7.3 MBSearch inside with Pro
AppendixAppendix: Argyll Bute School Public Transport Review 27-08-20257.1 MBDownload
ReportUPDATE ON THE REVIEW OF PUBLIC AND SCHOOL TRANSPORT199 KBDownload
12
Report

REVIEW OF ROADS AND INFRASTRUCTURE SERVICES - UPDATE

Report by Executive Director with responsibility for Roads and Infrastructure

Decision: Decision The Environment, Development and Infrastructure Committee: 1. noted the progress to date on the RIS review and the outstanding actions; 2. noted that a further report on progress would be presented to the Committee in June 2026; and 3. noted the progress with savings. (Reference: Report by Executive Director with responsibility for Roads and Infrastructure Services, dated 10 March 2026, submitted) Decision page

2 papers, 286 KBSearch inside with Pro
AppendixAppendix 1: RIS Review.xlsx119 KBDownload
ReportREVIEW OF ROADS AND INFRASTRUCTURE SERVICES: UPDATE167 KBDownload
15
Procedure

Councillor Gary Mulvaney left the meeting at 12:48pm, during

discussion of agenda item 13 (Update on measures to protect against rockfalls on B8035, Gribun , Mull). *

13
Report

UPDATE ON MEASURES TO PROTECT AGAINST ROCKFALLS ON B8035, GRIBUN, MULL

Report by Executive Director with responsibility for Roads and Infrastructure Services

Decision: Decision The Environment, Development and Infrastructure Committee: 1. noted the report; 2. agreed that officers engage with the Scottish Government and local communities to pursue preferred option, Option 10 in Appendix 1 of the report, targeted descaling of the cliff to remove loose rock and boulders; 3. noted that the Committee would not support delisting the road at Gribun ; and 4. agreed to recommend to the Policy and Resources Committee that £0.300m previously allocated to Gallanach rock... Decision page

1 paper, 188 KBSearch inside with Pro
ReportUPDATE ON MEASURES TO PROTECT AGAINST ROCKFALLS ON B8035, GRIBUN, MULL188 KBDownload
14
Report

PROJECT 20 - REQUEST TO PROGRESS TO IMPLEMENTATION

Report by Executive Director with responsibility for Development and Infrastructure Services

Decision: Decision The Environment, Development and Infrastructure Committee agreed that the project proceeds with the implementation of speed restriction TTROs following engagement with local Elected Members, Community Councils and the completion of the pre-implementation baseline speed surveys in each of our Council areas. (Reference: Report by Executive Director with responsibility for Development and Infrastructure Services, dated 3 February 2026, submitted) Decision page

1 paper, 177 KBSearch inside with Pro
ReportPROJECT 20: REQUEST TO PROGRESS TO IMPLEMENTATION177 KBDownload
15
Report

CEMETERY DEVELOPMENT PROGRAMME - PROGRESS REPORT 2025/26

Report by Executive Director with responsibility for Roads and Infrastructure Services

Decision: Decision The Environment, Development and Infrastructure Committee: 1. noted the progress on fulfilling the conditions regarding Ecology and Archaeological surveys, in pursuit of full planning approval towards the construction of additional lair space at four specific cemeteries; 2. noted the efforts taken so far towards finding suitable land in Cowal and Mull towards sustaining a local burial service; 3. assessed the added value of further full-scale Archaeological investigations at Calgary... Decision page

1 paper, 364 KBSearch inside with Pro
ReportCEMETERY DEVELOPMENT PROGRAMME: PROGRESS REPORT 2025/26364 KBDownload
16
Report

ROADS CAPITAL RECONSTRUCTION PROGRAMME 2026-27

Report by Executive Director with responsibility for Roads and Infrastructure

Decision: Decision The Environment, Development and Infrastructure Committee: 1. endorsed the proposed capital works programme 2026-27 totalling £12M. 2. agreed to allocate: a) £2.1M Strategic Schemes; b) £2M Strategic Network Surface Dressing Treatment Schemes; c) £1M for Vehicles Safety Fencing; d) £100k Road signage improvements; and e) £6.8M Area Resurfacing and Drainage schemes. 3. requested that officers engage with Elected Members regarding the unallocated £900K and that a final list of schemes... Decision page

2 papers, 417 KBSearch inside with Pro
ReportAppendices: Capital Programme185 KBDownload
ReportROADS CAPITAL RECONSTRUCTION PROGRAMME 2026-27232 KBDownload
17
Procedure

NOTICE OF MOTION UNDER STANDING ORDER 14

Decision: Decision The Environment, Development and Infrastructure Committee agreed the terms of the Motion. (Reference: Notice of Motion Under Standing Order 14, moved by Councillor Ross Moreland, seconded by Councillor Luna Martin, submitted) Decision page

18
Report

ENVIRONMENT, DEVELOPMENT AND INFRASTRUCTURE COMMITTEE WORK PLAN 2026/27

Decision: Decision The Environment, Development and Infrastructure Committee noted the content of the workplan. (Reference: Environment, Development and Infrastructure Committee workplan, dated March 2026, submitted) Decision page

1 paper, 118 KBSearch inside with Pro
ReportENVIRONMENT, DEVELOPMENT AND INFRASTRUCTURE COMMITTEE WORK PLAN 2026/27118 KBDownload
Read inside all 18 papersPro opens every page, searches every appendix, and keeps the papers if the council removes them.

What this meeting moved on

1 journey

The main business: UPDATE ON THE REVIEW OF PUBLIC AND SCHOOL TRANSPORT

Item 11 is where most of this meeting's papers sit: 2 papers, about 7.3 MB.

Item 11

UPDATE ON THE REVIEW OF PUBLIC AND SCHOOL TRANSPORT

Report by Executive Director with responsibility for Development and Infrastructure Services

What is in the pack2 papers, about 7.3 MB
Appendix
Appendix: Argyll Bute School Public Transport Review 27-08-2025Supporting paper
7.1 MB
Report
UPDATE ON THE REVIEW OF PUBLIC AND SCHOOL TRANSPORTThe report to the committee
199 KB
Read and search every page of this itemPro opens all 2 papers, and keeps them if the council removes them.

How this item got here

This committee has dealt with the subject before.

12 September 2024SCHOOL AND PUBLIC TRANSPORT - OPTIONS FOR FUTURE SERVICE DELIVERYReport by Executive Director with responsibility for Roads and Infrastructure Services
19 March 2026UPDATE ON THE REVIEW OF PUBLIC AND SCHOOL TRANSPORTThis meeting.

Every paper for this meeting

All 18 papers in one list, with the item each belongs to, its size, and our copy of it. Download any paper from our archive once signed in; read and search it here with Pro.

PaperSizeOur copy
MINUTESItem 3, MINUTES
205 KB
Kept 30 Sep
WITHDRAWAL OF UK SHARED PROSPERITY FUNDINGItem 4, WITHDRAWAL OF UK SHARED PROSPERITY FUNDING
370 KB
Kept 30 Sep
FILM IN ARGYLL: SCREEN SECTOR UPDATE REPORTItem 5, FILM IN ARGYLL - SCREEN SECTOR UPDATE REPORT
180 KB
Kept 30 Sep
LATEST UPDATE ON THE SETTLEMENT PROJECT SUPPORT OFFICER ACTIONSItem 6, LATEST UPDATE ON THE SETTLEMENT PROJECT SUPPORT OFFICER ACTIONS
361 KB
Kept 30 Sep
UPDATE ON THE ARGYLL AND THE ISLES STRATEGIC TOURISM PARTNERSHIP'S TOURISM STRATEGY FOR ARGYLL AND BUTEItem 7, UPDATE ON THE ARGYLL AND THE ISLES STRATEGIC TOURISM PARTNERSHIP'S TOURISM STRATEGY FOR ARGYLL AND BUTE
142 KB
Kept 30 Sep
TRANSFORMATIONAL PROJECTS AND REGENERATION TEAM: LARGE SCALE PROJECT UPDATE REPORTItem 8, TRANSFORMATIONAL PROJECTS AND REGENERATION TEAM - LARGE SCALE PROJECT UPDATE REPORT
295 KB
Kept 30 Sep
PUBLIC CONVENIENCE DOOR ACCESS CONTROL PROJECTItem 9, PUBLIC CONVENIENCE DOOR ACCESS CONTROL PROJECT
191 KB
Kept 30 Sep
ELECTRIC VEHICLE CHARGING STRATEGY: PROGRESS AND PROPOSED DELIVERY MODELItem 10, ELECTRIC VEHICLE CHARGING STRATEGY - PROGRESS AND PROPOSED DELIVERY MODEL
256 KB
Kept 30 Sep
Appendix: Argyll Bute School Public Transport Review 27-08-2025Item 11, UPDATE ON THE REVIEW OF PUBLIC AND SCHOOL TRANSPORT
7.1 MB
Kept 30 Sep
UPDATE ON THE REVIEW OF PUBLIC AND SCHOOL TRANSPORTItem 11, UPDATE ON THE REVIEW OF PUBLIC AND SCHOOL TRANSPORT
199 KB
Kept 30 Sep
RIS Review.xlsxAppendix 1, item 12, REVIEW OF ROADS AND INFRASTRUCTURE SERVICES - UPDATE
119 KB
Kept 30 Sep
REVIEW OF ROADS AND INFRASTRUCTURE SERVICES: UPDATEItem 12, REVIEW OF ROADS AND INFRASTRUCTURE SERVICES - UPDATE
167 KB
Kept 30 Sep
UPDATE ON MEASURES TO PROTECT AGAINST ROCKFALLS ON B8035, GRIBUN, MULLItem 13, UPDATE ON MEASURES TO PROTECT AGAINST ROCKFALLS ON B8035, GRIBUN, MULL
188 KB
Kept 30 Sep
PROJECT 20: REQUEST TO PROGRESS TO IMPLEMENTATIONItem 14, PROJECT 20 - REQUEST TO PROGRESS TO IMPLEMENTATION
177 KB
Kept 30 Sep
CEMETERY DEVELOPMENT PROGRAMME: PROGRESS REPORT 2025/26Item 15, CEMETERY DEVELOPMENT PROGRAMME - PROGRESS REPORT 2025/26
364 KB
Kept 30 Sep
Appendices: Capital ProgrammeItem 16, ROADS CAPITAL RECONSTRUCTION PROGRAMME 2026-27
185 KB
Kept 30 Sep
ROADS CAPITAL RECONSTRUCTION PROGRAMME 2026-27Item 16, ROADS CAPITAL RECONSTRUCTION PROGRAMME 2026-27
232 KB
Kept 30 Sep
ENVIRONMENT, DEVELOPMENT AND INFRASTRUCTURE COMMITTEE WORK PLAN 2026/27Item 18, ENVIRONMENT, DEVELOPMENT AND INFRASTRUCTURE COMMITTEE WORK PLAN 2026/27
118 KB
Kept 30 Sep

Last time, and what carried over

The committee last met on 18 December 2025. 5 of its items lead into this meeting; 10 items are new. Point at any item to follow a thread. Procedural items are left out.

Dec18
18 December 202521 items, 37 papers
Held
carried over
Mar19
19 March 202621 items, 18 papers
Held
3
MINUTESEnvironment, Development and Infrastructure Committee held on 11...
4
LATEST UPDATE ON THE SETTLEMENT PROJECT SUPPORT OFFICER ACTIONSReport by Executive Director with responsibility for Development and...
5
ANNUAL STATUS AND OPTIONS REPORT 2025-26Report by Executive Director with responsibility for Development and...
6
SUPPORTING OUR POLLINATORSReport by Executive Director with responsibility for Roads and...
7
CEMETERY ASSET - ANNUAL REPORTReport by Executive Director with responsibility for Roads and...
8
TRAFFIC REGULATION ORDERSReport by Executive Director with responsibility for Roads and...
9
TEMPORARY TRAFFIC REGULATION ORDERS - REVIEW OF CHARGING AND ADVERTISINGReport by Executive Director with responsibility for Roads and...
10
ELECTRIC VEHICLE CHARGING STRATEGY - PROGRESS AND PROPOSED DELIVERY MODELReport by Executive Director with responsibility for Roads and...
11
REVIEW OF ROADS AND INFRASTRUCTURE SERVICES - UPDATEReport by Executive Director with responsibility for Roads and...
12
LOCAL FLOOD RISK MANAGEMENT PLANS - S37 INTERIM UPDATEReport by Executive Director with responsibility for Roads and...
13
BUS INFRASTRUCTURE FUNDReport by Executive Director with responsibility for Roads and...
14
REST AND BE THANKFUL ROUNDTABLE DISCUSSIONS REPORTReport by Executive Director with responsibility for Development and...
15
RESPONSE TO SCOTTISH GOVERNMENT CONSULTATION ON CHARGING FOR WASTE AND RECYCLING COLLECTIONSReport by Executive Director with responsibility for Development and...
16
WASTE MANAGEMENT UPDATEReport by Executive Director with responsibility for Development and...
17
SPEED LIMIT REVIEWReport by Executive Director with responsibility for Roads and...
18
SCOTTISH GOVERNMENT DRAFT CIRCULAR ECONOMY STRATEGYReport by Executive Director with responsibility for Development and...
19
UPDATE ON MEASURES TO PROTECT AGAINST ROCKFALLS ON B8035, GRIBUN, MULLReport by Executive Director with responsibility for Development and...
20
COMMUNITY EMPOWERMENT (SCOTLAND) ACT 2015 - ALLOTMENTS WAITING LIST REGISTERReport by Executive Director with responsibility for Legal and...
21
ENVIRONMENT, DEVELOPMENT AND INFRASTRUCTURE COMMITTEE WORK PLAN 2025/26
3
MINUTESNew this time
4
WITHDRAWAL OF UK SHARED PROSPERITY FUNDINGNew this time
5
FILM IN ARGYLL - SCREEN SECTOR UPDATE REPORTNew this time
6
LATEST UPDATE ON THE SETTLEMENT PROJECT SUPPORT OFFICER ACTIONSReport by Executive Director with responsibility for Development and...
7
UPDATE ON THE ARGYLL AND THE ISLES STRATEGIC TOURISM PARTNERSHIP'S TOURISM STRATEGY FOR ARGYLL AND BUTENew this time
8
TRANSFORMATIONAL PROJECTS AND REGENERATION TEAM - LARGE SCALE PROJECT UPDATE REPORTNew this time
9
PUBLIC CONVENIENCE DOOR ACCESS CONTROL PROJECTNew this time
10
ELECTRIC VEHICLE CHARGING STRATEGY - PROGRESS AND PROPOSED DELIVERY MODELReport by Executive Director with responsibility for Roads and...
11
UPDATE ON THE REVIEW OF PUBLIC AND SCHOOL TRANSPORTNew this time
12
REVIEW OF ROADS AND INFRASTRUCTURE SERVICES - UPDATEReport by Executive Director with responsibility for Roads and...
13
UPDATE ON MEASURES TO PROTECT AGAINST ROCKFALLS ON B8035, GRIBUN, MULLReport by Executive Director with responsibility for Roads and...
14
PROJECT 20 - REQUEST TO PROGRESS TO IMPLEMENTATIONNew this time
15
CEMETERY DEVELOPMENT PROGRAMME - PROGRESS REPORT 2025/26New this time
16
ROADS CAPITAL RECONSTRUCTION PROGRAMME 2026-27New this time
18
ENVIRONMENT, DEVELOPMENT AND INFRASTRUCTURE COMMITTEE WORK PLAN 2026/27

The threads

  • LATEST UPDATE ON THE SETTLEMENT PROJECT SUPPORT OFFICER ACTIONS leads to item 6, LATEST UPDATE ON THE SETTLEMENT PROJECT SUPPORT OFFICER ACTIONS
  • ELECTRIC VEHICLE CHARGING STRATEGY - PROGRESS AND PROPOSED DELIVERY MODEL leads to item 10, ELECTRIC VEHICLE CHARGING STRATEGY - PROGRESS AND PROPOSED DELIVERY MODEL
  • REVIEW OF ROADS AND INFRASTRUCTURE SERVICES - UPDATE leads to item 12, REVIEW OF ROADS AND INFRASTRUCTURE SERVICES - UPDATE
  • UPDATE ON MEASURES TO PROTECT AGAINST ROCKFALLS ON B8035, GRIBUN, MULL leads to item 13, UPDATE ON MEASURES TO PROTECT AGAINST ROCKFALLS ON B8035, GRIBUN, MULL
  • ENVIRONMENT, DEVELOPMENT AND INFRASTRUCTURE COMMITTEE WORK PLAN 2025/26 leads to item 18, ENVIRONMENT, DEVELOPMENT AND INFRASTRUCTURE COMMITTEE WORK PLAN 2026/27

Not carried over

ANNUAL STATUS AND OPTIONS REPORT 2025-26, SUPPORTING OUR POLLINATORS, CEMETERY ASSET - ANNUAL REPORT, TRAFFIC REGULATION ORDERS and 9 more do not return this time.

See the 18 December meeting

This committee over time

Every Environment, Development and Infrastructure Committee meeting we have read, the dates it has set for the future, and each time those dates have changed.

46 meetings, 2014 to 2026Dot size shows the number of papers
2014201620182020202220242026
HeldThis meeting
MeetingItemsPapers
9 Oct 2026Friday
13items
17papers
HeldOpen
18 Jun 2026Thursday
13items
14papers
HeldOpen
19 Mar 2026Thursday, this meeting
21items
18papers
18 Dec 2025Thursday
21items
37papers
HeldOpen
11 Sep 2025Thursday
17items
29papers
HeldOpen
19 Jun 2025Thursday
18items
17papers
HeldOpen
20 Mar 2025Thursday
22items
22papers
HeldOpen
19 Dec 2024Thursday
17items
22papers
HeldOpen
12 Sep 2024Thursday
16items
21papers
HeldOpen
20 Jun 2024Thursday
19items
28papers
HeldOpen
21 Mar 2024Thursday
20items
23papers
HeldOpen
30 Nov 2023Thursday
16items
16papers
HeldOpen
31 Aug 2023Thursday
20items
31papers
HeldOpen
1 Jun 2023Thursday
14items
14papers
HeldOpen
2 Mar 2023Thursday
16items
22papers
HeldOpen
1 Dec 2022Thursday
18items
17papers
HeldOpen
1 Sep 2022Thursday
13items
9papers
HeldOpen
2 Jun 2022Thursday
12items
15papers
HeldOpen
3 Mar 2022Thursday
18items
15papers
HeldOpen
2 Sep 2021Thursday
18items
22papers
HeldOpen
3 Jun 2021Thursday
17items
29papers
HeldOpen
4 Mar 2021Thursday
17items
12papers
HeldOpen
3 Dec 2020Thursday
21items
21papers
HeldOpen
10 Sep 2020Thursday
10items
8papers
HeldOpen
5 Mar 2020Thursday
17items
14papers
HeldOpen
5 Dec 2019Thursday
16items
26papers
HeldOpen
12 Sep 2019Thursday
13items
14papers
HeldOpen
6 Jun 2019Thursday
11items
9papers
HeldOpen
7 Mar 2019Thursday
17items
14papers
HeldOpen
6 Dec 2018Thursday
12items
16papers
HeldOpen
6 Sep 2018Thursday
10items
9papers
HeldOpen
7 Jun 2018Thursday
15items
17papers
HeldOpen
8 Mar 2018Thursday
14items
21papers
HeldOpen
7 Dec 2017Thursday
12items
16papers
HeldOpen
7 Sep 2017Thursday
13items
12papers
HeldOpen
6 Apr 2017Thursday
16items
14papers
HeldOpen
19 Jan 2017Thursday
15items
16papers
HeldOpen
10 Nov 2016Thursday
12items
9papers
HeldOpen
11 Aug 2016Thursday
15items
15papers
HeldOpen
7 Apr 2016Thursday
22items
25papers
HeldOpen
14 Jan 2016Thursday
15items
15papers
HeldOpen
12 Nov 2015Thursday
11items
9papers
HeldOpen
13 Aug 2015Thursday
17items
13papers
HeldOpen
13 Apr 2015Monday
15items
18papers
HeldOpen
15 Jan 2015Thursday
12items
10papers
HeldOpen
10 Apr 2014Thursday
8items
4papers
HeldOpen

Follow the Environment, Development and Infrastructure Committee

Choose what you want to hear about. The preview is built from this committee's real papers and changes, so you can see what would have reached you.

What should we tell you?

Argyll and Bute, Environment, Development and Infrastructure Committee

Environment, Development and Infrastructure Committee: 3 kinds of updateArgyll and Bute, sent the same day
PDF
18 papers published for 19 MarchUPDATE ON THE REVIEW OF PUBLIC AND SCHOOL TRANSPORT and 17 more papers
DAT
Meeting dates updatedAny date added, moved or dropped
DEC
Decisions from 19 MarchThe committee's resolutions, the day they are recorded
ABC
"review" found in 4 papersAppendix: Argyll Bute School Public Transport Review 27-08-2025 and UPDATE ON THE REVIEW OF PUBLIC AND SCHOOL TRANSPORT
Each update links to the paper and the council's own copy
Free: one weekly alert. Pro: every option, the same day. Pro Plus: straight into your own systems.

Free

One alert, sent weekly, on titles and decisions.

£0for good
  • 1 alert, weekly summary
  • Titles and decisions
  • Link to every official paper
Save this alert free
Most chosen

Pro

Unlimited alerts the same day, searching every page.

£99per user a month
  • Unlimited alerts, same day
  • Matches inside every page and appendix
  • Every council, not just this one

Pro Plus

Your team, with every match pushed into your own tools.

£449a month, 3 users included
  • Everything in Pro, for 3 users
  • Alerts as webhooks into Slack or a CRM
  • API key and bulk export of this council

Data licence

Every council's records in your own products and research.

£12,000a year, from
  • Unlimited API and full archive delivery
  • Rights to use the data in your products
  • Back to 2000, every council
Talk to us

Never miss what this committee decides

Papers, decisions and date changes for the Environment, Development and Infrastructure Committee, and every other committee you follow, the day they appear.

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies