CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Bracknell Forest Council
Executive, Tuesday 14 March 2017 at 5.00pm

Adoption of the Design Supplementary Planning Document

Approved Executive 4 papers

Executive approved this item on Tuesday 14 March 2017. Below is the council's own wording, with the papers it was decided on.

Item80

Resolved

RESOLVED that; ( i ) the Design SPD be approved as a material consideration in the determination of all planning applications validated from the date of its adoption; (ii) the design leaflet “ Extending Your Home: A Householders Guide” be revoked for all planning applications validated from the date of the adoption of the Design SPD ; (iii) the publication of the Consultation Statement be agreed; (iv) the Executive Member for Planning and Transport be authorised to agree any minor changes to Appendix A and Appendix B of the Director of Environment, Culture & Communities report prior to adoption in ( i ) above.
Word for word from the decision Bracknell Forest published for this meeting. Source: democratic.bracknell-forest.gov.uk

Follow this further

Built from Bracknell Forest's papers

What the report saysPro

Report to Executive

Design Supplementary Planning Document Bracknell Forest Council

March 2017 Consultants to Bracknell Forest Council:

Tibbalds Planning and Urban Design 19 Maltings Place Environment, Culture and Communities 169 Tower Bridge Road Bracknell Forest Council London Time Square SE1 3JB Market Street Bracknell Tel: 020 7089 2121 RG12 1JD [email removed] Tel: 01344 352000 www.tibbalds.co.uk

5591 MARCH 2017 Contents

1 Introduction 2 4 Extensions and Alterations 32

1.1Achieving good design 4.1 Introduction 32 through the planning system 2 4.2 General guidance 32 1.2 Design SPD 3 4.3 Rear extensions 33 1.3 How to use this document 3 4.4 Rear infill extensions 35 2 Responding to the Context 4 4.5 Side extensions 36 2.1 Key principle 4 4.6 Front extensions and porches 37 2.2 Understanding the site and its context 4 4.7 Roof extensions 38 2.3 Integrating the site into its surroundings 8 4.8 Windows and doors 39 2.4 Placemaking 8 4.9 Solar panels, satellite dishes and air source heat pumps 39 2.5 Sustainable Drainage Systems (SuDS) 9 4.10 Balconies and roof terraces 39 2.6 Sustainability 11 4.11 Garages and outbuildings 40 3 Built Form and Spaces 12 5 Design and Access Statements 41 3.1 Key principles 12 5.1 Introduction 41 3.2 Streets, blocks, open spaces and landscape 12 5.2 Content of a Design and Access Statement 41 3.3 Plots 15

3.4Frontages 16 6 Appendix: Further sources of information 42

3.5Addressing edges 19

3.6Backland development 21

3.7Built form 22

3.8Building design 24

3.9Other residential requirements 28

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
9. a 29 Design SPD final lowReport 4.5 MB DownloadRead as text
PDF
9. b 03 consultation statementReport 513 KB Download
PDF
9. c -equalities-screening-record-form 8.2.17Report 230 KB Download
PDF
Adoption of the Design Supplementary Planning DocumentDecisions 405 KB Download

At this meeting

Whole meeting

Who was there

7 of 9 attended
PB
Councillor Paul Bettison OBE CONChair, apologies
DG
Councillor Dr Gareth Barnard CONVice-Chair, in the Chair, present
DB
Councillor Dale Birch CONCommittee Member, present
MB
Councillor Marc Brunel-Walker CONCommittee Member, present
MD
Councillor Mrs Dorothy Hayes MBE CONCommittee Member, present
PH
Councillor Peter Heydon CONCommittee Member, present
IM
Councillor Iain McCracken CONCommittee Member, present
CT
Councillor Chris Turrell CONCommittee Member, present
PP
Priya PatelClerk, expected

More from Bracknell Forest Executive

All decisions
MeetingDecisionOutcome
17 Sep 2024 Town Centre Off Street Day Rate Car Park ChargesRESOLVED that i. the Executive noted the options on charging tariffs for The Avenue, Braccan Walk and Weather Way car... Noted Open
17 Sep 2024 Housing Supplementary Planning Document (SPD) consultationRESOLVED that i. the content of the Draft Housing SPD is agreed. ii. a public consultation on the Draft Housing SPD b... Agreed Open
17 Sep 2024 Approval of Biodiversity Action Plan 2024-2029RESOLVED that the Bracknell Forest Biodiversity Action Plan (BAP) 2024-2029 and supporting summary document is approved. Approved Open
17 Sep 2024 Council Plan Overview Report Q1RESOLVED that the performance of the council over the period from April to June 2024 highlighted in the Overview Repo... Noted Open
17 Sep 2024 Quarterly update on SEND ImprovementRESOLVED that the Executive: i. notes the progress made on implementing the SEND WSOA to improve services to children... Decided Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies