Decision The Executive Councillor is recommended: To approve the tendering and letting of a contract for a design and build of a river bank restoration programme at Stourbridge Common. To approve the spending of £100k in year 2013/14 To approve the preparation of future capital bids for future works along the Stourbridge Common river bank Decision of Executive Councillor for Public Places i. Approved the tendering and letting of a contract for a design and build of a river bank restoration programme at Stourbridge Common. ii. Approved the spending of £100k in year 2013/14. iii. Approved the preparation of future capital bids for future works along the Stourbridge Common river bank. Reason for the Decision As set out in the Officer’s report. Any Alternative Options Considered and Rejected Not applicable. Scrutiny Considerations Committee did not request this item for pre-scrutiny. Conflicts of Interest Declared by the Executive Councillor (and any Dispensations Granted) No conflicts of interest were declared by the Executive Councillor.
Word for word from the decision Cambridge published for this meeting.Source: democracy.cambridge.gov.uk
Cambridge City Council is the riparian owner of the riverbank along Stourbridge Common. A structural survey of the existing riverbank has revealed significant stretches that are in need of repair.
Consideration has been given to the methods of repair and the preferred approach for a replacement design would be the use of soft engineering principles (such as bank stabilisation using natural materials and aquatic marginal plants) Once established these will provide a long term sustainable solution, requiring no or low maintenance, reducing costs and significantly enhancing the river aesthetic and biodiversity of this recently designated Local Nature Reserve.
This approach would be supported by the Environment Agency as it would meet national targets to re-naturalise rivers under the Water Framework Directive.
The Drainage Engineer and Nature Conservation Officer will provide the technical input for a tender specification for the contract to be let as a design and build by specialist firms. This report provides evidence to support this approach and allows the Executive Councillor to make a decision based on the information supplied.
1 MLM Report 2. Recommendations
The Executive Councillor is recommended:
To approve the tendering and letting of a contract for a design and build of a river bank restoration programme at Stourbridge Common.
To approve the spending of £100k in year 2013/14
To approve the preparation of future capital bids for future works along the Stourbridge Common river bank
Background
Cambridge City Council is the riparian owners of 860m of riverbank on Stourbridge Common Local Nature Reserve (LNR), situated on the southern bank of the main River Cam in north east Cambridge. The site is Common land (subject to the Commons Act 2006), a designated LNR and a non- statutory County Wildlife Site. In addition the entire length of the River Cam is designated as a County Wildlife Site as it passes through the City.
The existing concrete riverbank is reaching the end of its lifespan along several sections and a structural survey was undertaken in January 2013 to assess the extent and prioritise areas.
The river wall is a king post pile retaining wall construction over most of its length. Precast concrete piles driven into the river bed retain precast concrete wall panels, which themselves retain the bank material to the rear of the wall. A reinforced concrete capping beam finishes the top of the wall, providing a finish to the piles and wall panels.
The survey confirmed that the piled wall is beginning to fail and lean into the river. The integrity of the riverbank being broken down into four categories:
Significantly leaning into the river = 138m Leaning into the river = 148m Slightly leaning into the river = 70m No Lean into the river = 504m
Other issues identified where voids forming at the back of the wall that could be a trip hazard (this is prevalent along 250m of bank) and the capping beam is also in poor condition in a significant number of areas.
2 MLM Report There is also significant tree root ingress into the river in places that is undermining sections of wall that are not yet leaning.
The Environment Agency, in line with the European Water Framework Directive no longer advocates the use of hard engineering of riverbanks in locations where soft engineering and habitat diversification can be championed. As this site has recently been designated a Local Nature Reserve, officers are proposing the use of natural techniques of bank stabilisation using aquatic vegetation and natural materials.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Shared Waste 2018/19 Business PlanDecision of Executive Councillor for Waste Services and City Centre. i. Approved the 2018/19 Shared Waste business Pl...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.