Delegate authority to officers Letters of Rep: 0 Update Report: None MJC introduced the application as above, which builds on an application considered by Members a few months ago. More information about what the lamps originally looked like has informed this application, and the recommendation is the delegate authority back to officers to issue the decision. The reason for this is that consultation is still underway with the War Memorial Trust, and this needs to run its course before a decision is made. Public Speaking: None. Member debate: CH: answering his own question from a previous Planning Committee, confirmed that the lamps do work, and are not merely for ornament. Vote on officer recommendation to grant 15 in support – unanimous GRANT
Word for word from the decision Cheltenham published for this meeting.Source: democracy.cheltenham.gov.uk
This site map is for reference purposes only. OS Crown Copyright. All rights reserved Cheltenham Borough Council 100024384 2007 1. DESCRIPTION OF SITE AND PROPOSAL
1.1The War Memorial is located in a prominent position set centrally within formal gardens to the front of the Municipal Offices on the Promenade. Previously covered by the curtilage of the Municipal Offices, the Cenotaph was listed Grade II in its own right in 2016.
1.2The proposal is for the replacement of the 4 metal lanterns on each corner of the war memorial.
2. CONSTRAINTS AND RELEVANT PLANNING HISTORY Constraints: Conservation Area Core Commercial Area Smoke Control Order
Relevant Planning History:
12/01767/LBC 11th February 2013 GRANT Replacement of paving slabs with natural stone paving. Replacement of edging of raised planting bed with Forest of Dean stone plinth. Installation of uplighters and LED strip lights to illuminate Cenotaph and plaques. Repair of plinth steps and balustrade stonework. Replacement of existing lanterns with replicas of those originally installed. Installation of information panels.
14/01340/DISCON 24th September 2014 DISCHA Discharge of conditions 4 and 5 of listed building consent ref. 12/01767/LBC
15/01604/LBC 10th December 2015 GRANT Conservation of the war memorial to include cleaning of the stonework, carrying out repairs to decayed and fractured stone, repointing, re-cutting and re-filling deteriorated letters, and incising 8no. new names to match original style
16/00728/LBC 8th June 2016 GRANT Insertion of a narrow stainless steel flashing above inscription panels
16/01290/LBC 23rd September 2016 GRANT To renew 4 number lamps with 4 purpose fabricated globe lamps and caps
16/01296/CLBW 5th August 2016 CERTPU Cleaning works to the Cenotaph
16/02132/FUL 17th February 2017 PER Erection of war memorial interpretation board
17/00381/CLBW 5th April 2017 CERTPU Cleaning of flagstones
3. POLICIES AND GUIDANCE
Adopted Local Plan Policie CP 7 Design BE 9 Alteration of listed buildings
Supplementary Planning Guidance/Documents Central conservation area: Montpellier Character Area and Management Plan (Feb 2007)
National Guidance National Planning Policy Framework
4. CONSULTATIONS
Historic England 7th June 2017 Thank you for your letter of 25 May 2017 regarding the above application for listed building consent. On the basis of the information available to date, we do not wish to offer any comments. We suggest that you seek the views of your specialist conservation adviser.
It is not necessary for us to be consulted on this application again, unless there are material changes to the proposals. However, if you would like detailed advice from us, please contact us to explain your request.
5. PUBLICITY AND REPRESENTATIONS
Number of letters sent 0 Total comments received 0 Number of objections 0 Number of supporting 0 General comment 0
5.1A site notice has been displayed at the site and an advertisement was published in the Gloucestershire Echo.
6. OFFICER COMMENTS 6.1 Determining Issues
6.2The key consideration in relation to this application is the impact of the works on the listed building.
6.3Section 16 (2) of the Planning (Listed Building and Conservation Areas) Act 1990 requires local planning authorities to have special regard to the desirability of preserving a listed building or any features of special architectural or historic interest which it possesses.
6.4Last year listed building consent was granted for the replacement of the existing metal lamps on the Cheltenham Cenotaph with reproduction lamps based on the design of the original lamps that were part of the war memorial in the 1920s.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.