Resolved
RESOLVED That for the reasons set out in the report and in the update to Board the application be approved subject to the completion of a Section 106 Agreement to secure the following:- Contribution towards mitigation at level crossings ( delegated powers to the Development and Building Control Manager, in consultation with the Chairman and Network Rail to agree the amount with the developer) Education contribution of £260,311 Contribution towards towpath improvement works (delegated powers to the Development and Building Control Manager, in consultation with the Chairman and The Canal and River Trust to agree the amount with the developer) Contribution towards off-site footpath improvement works (delegated powers to the Development and Building Control Manager, in consultation with the Chairman and the Rights of Way Officer to agree the amount with the developer) Private residents management company to maintain all Amenity Greenspace , public footpaths and greenways within the site, play areas and other areas of incidental open space not forming private gardens or part of the adopted highway as public open space in perpetuity Improvements to the signal junction at Welsh Row/ Waterlode junction Financial contribution of £235,000 for the infrastructure link at Taylor drive £50,000 to improve bus service frequencies And subject to the following conditions:- 1. Standard outline 2. Standard outline 3. Plans 4. Submission / Approval / Implementation of details of appropriate mitigation measures to prevent any risk of pollution or harm to the adjacent Shropshire Union Canal 5. Submission / Approval / Implementation of Environmental Management Plan 6. Submission / Approval / Implementation of external Lighting 7. Submission / Approval / Implementation of noise mitigation measures 8. Submission / Approval / Implementation of Contaminated Land Assessment 9. No access to level crossing from site. 10. Discharge of surface water from the proposed development to mimic that which discharges from the existing site. 11. Submission / Approval / Implementation of Sustainable Urban Drainage System 12. The site layout is to be designed to contain any such flooding within the site, to ensure that existing and new buildings are not affected. 13. Submission / Approval / Implementation of a scheme to limit the surface water run-off generated by the proposed development, 14. Submission / Approval / Implementation of a scheme to manage the risk of flooding from overland flow of surface water and any potential floodwaters from the Shropshire Union Canal 15. This site must be drained on a separate system, with only foul drainage connected into the public foul sewerage system at a maximum discharge rate of 10 l/s. 16. Surface water should discharge to soakaway and or watercourse as stated within the FRA submitted. 17. Reserved matters to make provision for 10% renewable energy 18. Submission / Approval / Implementation of sustainability framework/strategy 19. Submission / Approval / Implementation of scheme for affordable housing to make provision ... view the full minutes text for item 147.