Resolved
RESOLVED That for the reasons set out in the report the application be approved subject to the following conditions:- 1. Full time limit for Units 1, 2 and 6. 2. Outline time limit for Units 3, 4 and 5. 3. Reserved matters to include appearance, landscape and layout. 4. Approved plans. 5. The occupied buildings within the development shall be designed to ensure that structure and façade are designed to resist the peak accidental explosion hazard to the building without exceeding a Minimal Hazard response condition. The explosion hazard varies across the development. For the nearest building, Unit 2, the peak hazard equates to a shock front with a peak overpressure of 11kPa with a 121ms duration. 6. Prior to commencement of the construction of any of the buildings, the design calculations, drawings and other submitted information for the primary building frames and façades shall be submitted to and approved in writing by the LPA, in consultation with the HSE. Development shall be carried out in accordance with the approved details. 7. Prior to first occupation of any of the units, the ghost right turn lane at the southern access to the site shall be provided and available for use. 8. Prior to first occupation the car park links to units 1 and 2 to the northern access road shall be provided and available for use. 9. Prior to first occupation of any of the units, the combined pedestrian/cycle route shall be provided and available for use. 10. External lighting in accordance with the submitted external lighting details. 11. Method statement for the control of non-native invasive plant species. 12. Protection of nesting birds. 13. Strategy for the inclusion of features to enhance biodiversity including nesting birds, roosting bats, gaps for Hedgehog movements, brash/deadwood piles and native species planting. 14. Any future reserved matters application for units 2,4 and 5 to be supported by a strategy for the inclusion of features to enhance biodiversity including nesting birds, roosting bats, gaps for Hedgehog movements, brash/deadwood piles and native species planting. 15. Compliance with the submitted tree protection measures. 16. Arboricultural Method Statement. 17. Any reserved matters application to be supported by an Arboricultural Impact Assessment, Arboricultural Method Statement and Tree Protection Scheme. 18. Development in accordance with the Flood Risk Assessment. 19. Detailed drainage/design strategy to limit surface water run off. 20. Foul and surface water drained on separate systems. 21. Updated Remediation Strategy (contaminated land). 22. Verification Report (contaminated land). 23. Soil and soil forming materials for soft landscaping areas to be tested and verified. 24. If, during the course of development, contamination not previously identified is found to be present, no further works shall be undertaken in the affected area and the contamination shall be reported to the Local Planning Authority as soon as reasonably practicable (but ... view the full minutes text for item 84.