Resolved
That the application be delegated for approval to the Head of Planning in consultation Chair/Vice-Chair of Strategic Planning Board subject to the submission of satisfactory protected species survey and the following conditions 1. Time limit 2. Approved plans/reports 3. Materials for new build elements 4. Level 3 building recording (prior to commencement) 5. Detailed drawings for replacement roof turrets and bell tower and associated works 6. Sample doff (steam Cleaning) and defrass (removal of loose material) agreed before work commences 7. Details of all new materials for the listed buildings (brick, stone roof coverings etc) 8. Sample panel of brickwork 9. Glazed brick samples 10. Specification for making good 11. Specification for painting 12. Specification for all raking out and repointing 13. Details of new vents, covers and RGW 14. Specification repair to brickwork of EFAP (Stables), EFAO (Memorial Pavillion) and EFAG 15. Specification works to roofs of EFAP (Stables), EFAO (Memorial Pavillion) and EFAG 16. Specification stonework repairs to EFAP, EFAO and EFAG 17. New doors and windows (internal and external) 1:5 details and 1:20 elevation – EFAP, EFAO and EFAG 18. Details floor finishes and method statement for floor removal 19. Method statement for demolition including how to safeguard existing building 20. Should any unexpected repairs be required, submission of details 21. Method statement and specification for timber panel repairs 22. Retention of cast iron/traditional radiators and details of new radiators 23. Details of fire proofing to walls 24. Details of other structures including substations 25. Details of window repairs 26. Submission of external lighting details 27. Breeding bird protection 28. Provision of House Martin nest cups and Sparrow terraces 29. Provision of landscaping details prior to commencement of each phase of development 30. Details of covered and secure cycle parking 31. No development (other than agreed demolition and site clearance works) shall commence until: (a) An updated Phase I Preliminary Risk Assessment has been submitted to, and approved in writing by, the Local Planning Authority (LPA) AND if required: (b) A Phase II ground investigation and risk assessment has been completed. A Phase II report shall be submitted to, and approved in writing by, the LPA AND: (c) If Phase II ground investigations indicate that remediation Page 100 is necessary, a Remediation Strategy shall be submitted to, and approved in writing, by the LPA. 32. No part of the development hereby approved shall be occupied or in use prior to submission and approval in writing of a Verification Report. This shall be prepared in accordance with the Local Planning Authority approved Remediation Strategy that covers that part of the development to be occupied or used. 33. (a) Any soil or soil forming materials to be brought to site for use in soft landscaping shall be tested for contamination and suitability ... view the full minutes text for item 72.