25/4732/LBC Listed Building consent for proposed redevelopment of Sandbach School comprising the demolition of 10 blocks and partial demolition of the Grade II Listed Grammar School Building and Lodge Building, construction of a new Sports
ApprovedPlanning2 papers
AI summaryCheshire East's Strategic Planning Board has delegated approval of listed building consent for the Sandbach School redevelopment to the Head of Planning, subject to a protected species survey and 24 listed-building conditions.
Written from the decision and the officer reportPDF Pro
OutcomeApprovedSubject to protected species survey and 24 conditions on materials, recording and repairs
MoneyNot stated
What happens nextProtected species survey to be submittedHead of Planning to issue decision once survey is satisfactory
Who it affectsSandbach School site, Crewe Road, SandbachIncludes Grade II Listed Grammar School Building and Lodge Building
What was decided
The application is delegated for approval to the Head of Planning in consultation with the Chair and Vice-Chair of the Strategic Planning Board, subject to the submission of a satisfactory protected species survey.
Approval is subject to 24 conditions covering time limit, plans, Level 3 building recording, sample panels, materials specifications, repair method statements and detailed drawings.
The Head of Planning has delegated authority to make minor changes to the wording of the decision in consultation with the Chairman, provided the substantive nature is not exceeded.
Why
The application seeks listed building consent for the demolition of 10 blocks and partial demolition of the Grade II Listed Grammar School Building and Lodge Building.
It also covers the construction of a new Sports Hall and Teaching Block, with internal and external alterations to the listed buildings, plus landscaping, car parking and temporary accommodation.
The detailed conditions are framed to safeguard the special architectural and historic interest of the Grade II listed structures during demolition, alteration and repair.
What happens next
The applicant must submit a satisfactory protected species survey before the delegated approval can be issued.
If issued, the works must comply with all 24 conditions, including prior submission of samples, method statements, specifications and detailed drawings.
The Head of Planning will issue the decision notice, with any minor wording changes made in consultation with the Chairman of the Strategic Planning Board.
Options considered
Chosen: Delegate approval to Head of Planning with conditions. The Strategic Planning Board resolved to delegate approval subject to a protected species survey and 24 conditions.
Implications
Legal: Listed building consent is granted for works affecting the Grade II Listed Grammar School Building and Lodge Building at Sandbach School.
Legal: 24 listed-building conditions must be discharged, including Level 3 building recording prior to commencement, sample panels of brickwork, glazed brick samples, and detailed repair specifications for EFAP, EFAO and EFAG.
Risk: Any unexpected repairs discovered during works will require further details to be submitted for approval.
Other: The plans indicate 196 total parking bays, including 103 retained existing spaces, plus bus parking bays, drop-off bays, a synthetic turf pitch (55 x 91m) and an all-weather pitch. Report P156, P157, P163, P202, P208
Other: A proposed Ground Source Heat Pump (GSHP) is shown on the site layout, along with a proposed substation location. Report P192, P205
The Grade II Listed Grammar School Building and Lodge Building
Ten blocks on the school site proposed for demolition
Surrounding streets and access points including Old Middlewich Road, Ashfields Drive, Blackacres, Bell Vue Terrace, Sunnyhill Drive, Union Street, Old Hall Street, Keele Gardens, Slow Lane, Newall Avenue and Fields Drive Report P8, P15, P16, P17, P84, P111, P131, P146, P142, P327
Timeline
16.05.2025: Pre-Application Pack issued for Sports Block and Teaching Block drawings (P01) Report P347, P353
LBC: Listed Building Consent, the application type under consideration
EFAG, EFAP, EFAO, EFAY, EFAE, EFAH: Building reference codes used on the site plans to identify individual blocks
GSHP: Ground Source Heat Pump, a proposed low-carbon heating system shown on the layout
MUGA: Multi-Use Games Area, an existing outdoor sports facility on the site
RIBA Stage 4: Technical Design stage of the Royal Institute of British Architects' work stages, referenced on the EFAG drawing revisions
Level 3 building recording: A specified level of historic building survey and recording, required as a condition before works commence
RWPs and RWG: Rainwater pipes and rainwater goods referenced in the proposed elevation details
Bowmer + Kirkland: The contractor identified on the architect's drawing title blocks
Jestico + Whiles and Purcell: Architect and heritage architect consultants identified on the drawings
What was decided, why, and what happens next
Pro reads every officer report for you and explains each decision in plain English: the money, the options, the risks, the timeline, each with the paragraph it came from.
Written by AI from the council's published papers. AI can get things wrong: the council's own wording below is the record.Report a problem
Item73
Resolved
That the application be delegated for approval to the Head of Planning in consultation Chair/Vice-Chair of Strategic Planning Board subject to the submission of satisfactory protected species survey and the following conditions 1. Time limit 2. Plans 3. Level 3 building recording (prior to commencement) 4. Detailed drawings for replacement roof turrets and bell tower and associated works 5. Sample doff and defrass agreed before work commences 6. Details of all new materials for the listed buildings(brick, stone roof coverings etc) 7. Sample panel of brickwork 8. Glazed brick samples 9. Specification for making good 10. Specification for painting 11. Specification for all raking out and repointing 12. Details of new vents, covers and RGW 13. Specification repair to brickwork of EFAP, EFAO and EFAG 14. Specification works to roofs of EFAP, EFAO and EFAG 15. Specification stonework repairs to EFAP, EFAO and EFAG 16. New doors and windows (internal and external) 1:5 details and 1:20 elevation – EFAP, EFAO and EFAG 17. Details floor finishes and method statement for floor removal 18. Method statement for demolition including how to safeguard existing building 19. Should any unexpected repairs be required, submission of details 20. Method statement and specification for timber panel repairs 21. Retention of cast iron/traditional radiators and details of new radiators 22. Details of fire proofing to walls 23. Details of other structures including substations 24. Details of window repairs In the event of any changes being needed to the wording of the Committee’s decision (such as to delete, vary or add conditions / informatives / planning obligations or reasons for approval/refusal) prior to the decision being issued, the Head of Planning has delegated authority to do so in consultation with the Chairman of the Strategic Planning Board, provided that the changes do not exceed the substantive nature of the Committee’s decision.
Word for word from the decision Cheshire East published for this meeting.Source: moderngov.cheshireeast.gov.uk
25/4732/LBC Listed Building consent for proposed redevelopment of Sandbach School comprising the demolition of 10 blocks and partial demolition of the Grade II Listed Grammar School Building and Lodge Building, construction of a new Sports Hall and Teaching Block, internal and external alterations tMinutes
7325/4732/LBC Listed Building consent for proposed redevelopment of Sandbach School comprising the demolition of 10 blocks and partial demolition of the Grade II Listed Grammar School Building and Lodge Building, construction of a new SportsThis decision
25/4732/LBC Listed Building consent for proposed redevelopment of Sandbach School comprising the demolition of 10 blocks and partial demolition of the Grade II Listed Grammar School Building and Lodge Building, construction of a new SportsThis decision
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.