25/4178/FUL Construction of a crematorium, parking area and ancillary works on Land at Junction of A534 and Pitcher Lane, Brereton
ApprovedPlanning5 papers
AI summaryCheshire East Strategic Planning Board approves a crematorium at the junction of A534 and Pitcher Lane in Brereton, subject to 18 conditions covering ecology, highways, drainage and contamination.
Written from the decision and the officer reportPDF Pro
OutcomeApprovedConstruction of crematorium, parking, ancillary works
MoneyNot stated
What happens nextImplement subject to conditionsHead of Planning may vary wording
Who it affectsA534 and Pitcher Lane areaSite at road junction, 412 sqm building
What was decided
The application was approved subject to 18 conditions covering time limit, approved plans, materials, landscaping, tree protection, biodiversity, ecology, highways, drainage and contamination.
Why
Approval was granted for the reasons set out in the report, with conditions addressing time, design, materials, ecology, highways, drainage and land contamination.
What happens next
Development must begin within the time limit set by condition 1 and follow the approved plans under condition 2.
The Head of Planning has delegated authority to make minor changes to the decision wording, in consultation with the Chair of the Strategic Planning Board.
Options considered
Chosen: Approve with conditions. Per the officer report as set out in the decision
Implications
Other: Conditions require biodiversity net gain, a 30 year habitat management and monitoring plan, great crested newt avoidance measures, an updated badger survey before work starts, and safeguards for nesting birds and retained habitats.
Risk: Two contaminated land conditions require assessment and any necessary remediation.
Other: Highways conditions require visibility splays at the access and a cycle bollard.
Other: A soakaway testing and drainage strategy must be agreed before development proceeds.
Other: Tree protection, landscaping implementation and ecological enhancement conditions apply.
Who and where
Road users at the junction of A534 and Pitcher Lane, Brereton Report P1, P4
Families and visitors attending services at the 100 seat ceremonial room Report P13
Staff working in offices, waiting room and service areas Report P14, P16
Timeline
06.07.20: Original design issue of the ground floor plan (revision A) Report P21
21.11.24: Latest ground floor plan revision (P02) for colonnade and arrival garden Report P21
10.2025: Site location plan issued for planning Report P10
Plain English for the jargon
BNG (Biodiversity Net Gain): A development must leave biodiversity in a better state than before.
Great Crested Newt Reasonable Avoidance Measures: Standard method to avoid harming a protected amphibian during construction.
Catafalque: A raised platform on which a coffin rests during the service, shown in the ceremonial room.
Porte cochere: A covered entrance large enough for vehicles to drop off passengers, shown on the plan.
What was decided, why, and what happens next
Pro reads every officer report for you and explains each decision in plain English: the money, the options, the risks, the timeline, each with the paragraph it came from.
Written by AI from the council's published papers. AI can get things wrong: the council's own wording below is the record.Report a problem
Item71
Resolved
That for the reasons set out in the report the application be APPROVED, subject to the following conditions: 1. Time Limit 2. Approved Plans 3. Materials 4. Landscaping Scheme 5. Implementation of Landscaping 6. Tree Protection 7. Biodiversity Net Gain 8. Habitat Creation method statement, 30 year habitat management and monitoring plan 9. Great Crested Newt Reasonable Avoidance Measures implementation 10. Updated badger survey prior to commencement 11. Safeguarding of Nesting Birds 12. Safeguarding of retained habitats 13. Ecological Enhancement 14. Highways Visibility Splays 15. Highways – Cycle Bollard 16. Soakaway Testing and Drainage Strategy 17. Contaminated Land 1 18. Contaminated Land 2 In the event of any changes being needed to the wording of the Committee’s decision (such as to delete, vary or add conditions / informatives / planning obligations or reasons for approval/refusal) prior to the decision being issued, the Head of Planning has delegated authority to do so in consultation with the Chair of the Strategic Planning Board, provided that the changes do not exceed the substantive nature of the Committee’s decision.
Word for word from the decision Cheshire East published for this meeting.Source: moderngov.cheshireeast.gov.uk
PROPOSED GROUND FLOOR PLAN @ 1:200 TOTAL INTERNAL GROUND FLOOR AREA: 412 m2
P02 21/11/24 Colonnade and arrival garden revised as per Client EH/ RT feedback. P01 09.10.24 Updated and reissued for Planning. EH / RT G 26.10.23 Plan flipped in line with client and pre-app advice EH / AL received. F 03.09.20 Workshop external door removed, FFL added KS / GE E 11.08.20 Changes to the office windows and arrival garden KS / GE D 07.08.20 Additional detail added KS / GE C 05.08.20 Area reduced and Office zone reconfigured KS / AL B 14.07.20 Portico Added KS / AL A 06.07.20 Chapel reduced in size, proportions altered KS / AL REV DATE COMMENTS AUTHOR / CHECKED
PROJECT TITLE
CONGLETON CRMEATORIUM DETAIL
PROPOSED GROUND FLOOR PLAN DRAWING NUMBER (PROJECT-ORIGINATOR-ZONE-LEVEL-TYPE-ROLE-NUMBER)
22006CON - LHC - 00 - 00 - DR - AR - 02.01 STATUS STATUS DESCRIPTION
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.