Resolved
That planning permission be GRANTED due to the following reasons: 1 This permission is for a limited period expiring on the 23th October 2017 by which time the change of use shall have ceased and the teepees and ancillary equipment shall be removed from the site and the land restored to its former condition unless otherwise agreed with the Local Planning Authority. Reason : To enable the local planning authority to review the position in the light of circumstances prevailing at the end of the period. 2 No camping shall take place on the site apart from in the designated ' teepee area (44.5 x 25m)' as defined on drawing 0624/01E. Camping on the site shall be restricted to a total of three teepees and no other tents/mobiles/caravans shall be sited on the land other than shown on the approved plan. Reason : To safeguard the amenity of the neighbouring residents in accordance with Policy CS12 of the Dacorum Borough Core Strategy, for the avoidance of doubt and to accord with the details provided by the applicant. 3 Prior to the commencement of the use hereby permitted, visibility splays in accordance with the guidance given in Hertfordshire County Council's 'Highway Design Guide - Roads in Hertfordshire' shall be provided to each side of the new access where it meets the highway by moving the adjacent fence 500mm into the site. These splays shall thereafter be maintained at all times free from any obstruction between 600mm and 2m above the level of the adjacent highway carriageway. These visibility splays will be agreed in writing with the Local Planning Authority and shown on a scaled plan. Reason : In the interests of highway safety in accordance with Policies CS8 and CS12 of Dacorum's adopted Core Strategy (2013). 4 The development hereby permitted shall not be carried out other than in accordance with the following approved plans: 0624/01E 0624/02 Reason: For the avoidance of doubt and in the interests of proper planning. Article 35 Statement Planning permission has been granted for this proposal. The Council acted pro-actively through positive engagement with the applicant at the pre-application stage and during the determination process which lead to improvements to the scheme. The Council ... view the full minutes text for item 26.