Resolved
Resolved That planning permission be GRANTED subject to the following conditions: No Condition 1 The development hereby permitted shall be begun before the expiration of three years from the date of this permission. Reason: To comply with the requirements of Section 91 (1) of the Town and Country Planning Act 1990 as amended by Section 51 (1) of the Planning and Compulsory Purchase Act 2004. 2 No development other than demolition, site preparation, groundworks and footings shall take place until a sample panel at least 1 metre by 1 metre of the materials proposed to be used on the external surfaces of the development hereby permitted shall have been submitted to and approved in writing by the local planning authority. The panel shall include details of pointing and the finished colour of the timber cladding. The approved materials shall be used in the implementation of the development. Reason: To ensure a satisfactory appearance to the development in the interests of the visual amenities of the area in accordance with saved Policy CS12 of the Dacorum Core Strategy September 2013. 3 All rainwater goods shall be finished black with a round profile and, notwithstanding any details submitted, no development other than demolition, site preparation, groundworks and footings shall take place until 1:20 details of the following (including materials and finished colour) shall have been submitted to and approved in writing by the local planning authority. Doors and windows Rooflights Eaves and other joinery Bin storage enclosure; Development shall be carried out in accordance with the approved details. Reason: To ensure a satisfactory appearance to the development in the interests of the visual amenities of the area in accordance with saved Policy CS12 of the Dacorum Core Strategy September 2013. 4 Development shall take place in accordance with the approved site plan PRJ/18/003/002 rev B and notwithstanding any details shown, no hard or soft landscaping of the site shall take place until full details of landscape works shall have been submitted to and approved in writing by the local planning authority. These details shall include: hard surfacing materials; soft landscape works which shall include planting plans; written specifications (including cultivation and other operations associated with plant and grass establishment); schedules of plants, noting species, plant sizes and proposed numbers/densities where appropriate; sustainable urban drainage measures; proposed finished levels or contours; minor artefacts and structures (e.g. signs, lighting etc); proposed and existing functional services above and below ground (e.g. drainage, power, communications cables, pipelines etc, indicating lines, manholes, supports etc); The approved landscape works shall be carried out prior to the first occupation of the development hereby permitted. Any tree or shrub which forms part of the approved landscaping scheme which ... view the full minutes text for item 94.