Resolved
That planning permission be GRANTED subject to the conditions set out below. Conditions and Reasons: 1. The development hereby permitted shall begin before the expiration of three years from the date of this permission. Reason: To comply with the requirements of Section 91 (1) of the Town and Country Planning Act 1990, as amended by Section 51 (1) of the Planning and Compulsory Purchase Act 2004. 2. The development hereby permitted shall be carried out in accordance with the following approved plans/documents: 19_378_PL01 Existing Site and Location Plan 19_378_PL02 G Proposed Site Plan 19_378_PL03 A House Type A Proposed Floor Plans 19_378_PL04 B Proposed House type A Proposed Elevations 19_378_PL05 A House Type B Proposed Floor Plans 19_378_PL06 B House Type B Proposed Elevations 19_378_PL07 House Type C Proposed Floor Plans 19_378_PL08 House Type C Proposed Elevations 19_378_PL09 A Proposed Front Aerial View 19_378_PL10 A Proposed Rear Aerial View 19_378_PL11 A Proposed View 1 19_378_PL12 A Proposed View 2 19_378_PL13 A Proposed View 3 19_378_PL14 -16 A Sun Path Study March, June and December 19_378_PL20 C Proposed Site Plan (showing adjoining site developed) KMC18049-001C Fire Appliance Swept Path Analysis KMC18049-002C Standard Refuse Vehicle Swept Path Analysis KMC18049-003C Large Refuse vehicle Swept Path Analysis KMC18049-004C Large Car Swept Path Analysis Reason: For the avoidance of doubt and in the interests of proper planning. 3. No development (excluding demolition/ground investigations) shall take place until details of the materials to be used in the construction of the external surfaces of the development hereby permitted have been submitted and approved in writing by the Local Planning Authority. Development shall be carried out in accordance with the approved details. Please do not send materials to the Council offices. Materials should be kept on site and arrangements made with the Planning Officer for inspection. Reason: To ensure satisfactory appearance to the development and to safeguard the visual character of the area in accordance with Policies CS11 and CS12 of the Dacorum Borough Core Strategy (2013). 4. No construction of the superstructure shall take place until full details of both hard and soft landscape works has been submitted to and approved in writing by the Local Planning Authority. These details shall include: · all external hard surfaces within the site; · other surfacing materials; · means of enclosure; · soft landscape works including a planting scheme with the number, size, species and position of trees, plants and shrubs; · minor artefacts and structures (e.g. furniture, play equipment, signs, refuse or other storage units, etc.); and · external lighting scheme The planting must be carried out within one planting season of completing the development. Any tree or shrub which forms part ... view the full minutes text for item 5c