Resolved
That planning permission be GRANTED subject to the following conditions: Condition(s) and Reason(s): 1. The development hereby permitted shall begin before the expiration of three years from the date of this permission. Reason: To comply with the requirements of Section 91 (1) of the Town and Country Planning Act 1990, as amended by Section 51 (1) of the Planning and Compulsory Purchase Act 2004. 2. The development hereby permitted shall be carried out in accordance with the following approved plans/documents: Application form (section 7 - Materials) 3818_L3F (Proposed Site Layout) 3818_P2D (Proposed Plans and Elevations Reason: For the avoidance of doubt and in the interests of proper planning. 3. Vehicular visibility splays of 2.4m x 43m shall be provided, and thereafter maintained, in both directions from the access, within which there shall be no obstruction to visibility between a height of 0.6m and 2m above the carriageway . Reason: In the interest of highway safety in accordance with Policy CS12 of the Core Strategy (2013) and Saved Policy 54 of the Local Plan (2004). 4. Prior to the commencement of the use hereby permitted the proposed onsite car parking area shall be laid out, demarcated, levelled, surfaced and drained in accordance with the approved plan and retained thereafter available for that specific use. Reason: To ensure the permanent availability of the parking area, in the interests of highway safety in accordance with Policy CS12 of the Core Strategy (2013) and Saved Policy 54 of the Local Plan (2004). 5. The development shall not be brought into use until the altered vehicle crossover has been constructed to the current specification of the Highway Authority and to the Local Planning Authority's satisfaction. Reason: In the interest of highway safety and amenity and to ensure the development makes adequate provision for on-site parking and manoeuvring of vehicles likely to be associated with its use in accordance with Policy CS12 of the Core Strategy (2013) and Saved Policy 54 of the Local Plan (2004). 6. No construction of the superstructure shall take place until full details of both hard and soft landscape works has been submitted to and approved in writing by the Local Planning Authority. These details shall include: - all external hard surfaces within the site; - other surfacing materials; - means of enclosure (heights) - soft landscape works including a planting scheme with the number, size, species and position of trees, plants and shrubs; - position (tree and height) and details (box model) of bird/bat boxes to be placed on the site or building The planting must be carried out within one planting season of completing the development. Any tree or ... view the full minutes text for item 9.