Resolved
GRANTED Condition(s) and Reason(s): 1. The development hereby permitted shall begin before the expiration of three years from the date of this permission. Reason: To comply with the requirements of Section 91 (1) of the Town and Country Planning Act 1990, as amended by Section 51 (1) of the Planning and Compulsory Purchase Act 2004. 2. Prior to the first use of the development hereby permitted the vehicular access shall be provided and thereafter retained at the position shown on the approved plans drawing number 01 and Location Plan in accordance with the current highway specification. Arrangement shall be made for surface water drainage to be intercepted and disposed of separately so that it does not discharge from or onto the highway carriageway . Reason: To ensure satisfactory access into the site and avoid carriage of extraneous material or surface water from or onto the highway in accordance with Policy 5 of Hertfordshire's Local Transport Plan (adopted 2018) and to comply with Core Strategy Policy 12. 3. Prior to the first use of the development hereby permitted a visibility splay measuring 2.4 x 43m metres shall be provided to each side of the access where it meets the highway and such splays shall thereafter be maintained at all times free from any obstruction between 600mm and 2m above the level of the adjacent highway carriageway. Reason: To ensure construction of a satisfactory development and in the interests of highway safety in accordance with Policy 5 of Hertfordshire's Local Transport Plan (adopted 2018) and Core Strategy Policy 12. 4. Prior to the first use of the development hereby permitted 0.65 metre x 0.65 metre pedestrian visibility splays shall be provided and permanently maintained each side of the access. They shall be measured from the point where the edges of the access way cross the footpath boundary, 0.65 metres into the site and 0.65 metres along the footpath boundary therefore forming a triangular visibility splay. Within which, there shall be no obstruction to visibility between 0.6 metres and 2.0 metres above the carriageway. Reason: To ensure construction of a satisfactory development and in the interests of highway pedestrian safety in accordance with Policies 5 and 7 of Hertfordshire's Local Transport Plan (adopted 2018) and to comply with Core Strategy Policy 12. 5. The development hereby permitted shall be carried out in accordance with the following approved plans/documents: Site Location Plan Driveway Dimension Plan Reason: For the avoidance of doubt and in the interests of proper planning . Informatives: 1. Planning permission has been granted for this proposal. ... view the full minutes text for item 5c