GRANTED Condition(s) and Reason(s): 1. The development hereby permitted shall begin before the expiration of three years from the date of this permission. Reason: To comply with the requirements of Section 91 (1) of the Town and Country Planning Act 1990, as amended by Section 51 (1) of the Planning and Compulsory Purchase Act 2004. 2. The development hereby permitted shall be carried out in accordance with the following approved plans/documents: PL/001 Rev B PL/003 Rev C Reason: For the avoidance of doubt and in the interests of proper planning. 3. Notwithstanding Section 5 (Materials) of the planning application form, the materials to be used in the construction of the external surfaces of the development hereby permitted shall be fully in accordance with those specified on the approved plans. Reason: To make sure that the appearance of the building is suitable and that it contributes to the character of the area in accordance with Policies CS11 and CS12 of the Dacorum Borough Core Strategy (2013). Informatives: 1. If bats, or evidence for them, are discovered during the course of roof works, work must stop immediately and advice sought on how to proceed lawfully from an appropriately qualified and experienced Ecologist or Natural England to avoid an offence being committed.
Word for word from the decision Dacorum published for this meeting.Source: democracy.dacorum.gov.uk
2.1The application is located within a residential area and therefore the principle of development is acceptable.
2.1.1 In design terms it is considered that the cladding would improve the visual appearance of the building and, in so far as the outbuilding is visible from the street scene (which is limited), there would be a benefit.
2.1.2 Given the separation distance, it is not considered that there would be any harm to the residential amenity of neighbouring dwellings as a result of this application.
2.1.3 Hertfordshire Ecology do not believe that there is reasonable likelihood of bats being present within the building, and therefore have simply recommended that an informative be
3. SITE DESCRIPTION
3.1The application site is located on the north-western side of Longfield Road, Tring, and relates to a 1.5 storey pre-existing outbuilding in the rear garden of no. 61.
4. PROPOSAL
4.1Planning permission is sought to re-clad an existing two-storey ancillary garden building and the insertion of two Velux windows in the front roof slope.
5. PLANNING HISTORY
Planning Applications (If Any):
4/01814/18/FHA - Conversion of existing two storey workshop to a two storey annex WDN - 25th October 2018
4/00462/18/LDP - Loft conversion with front, rear and side velux windows and new windows to rear and side elevations GRA - 27th April 2018
4/02315/17/FUL - Replacement of two storey workshop with 2-bed dwelling REF - 30th November 2017
4/01576/17/FHA - Extension of existing bungalow to create a two-storey four-bed house GRA - 3rd August 2017
Appeals (If Any):
4/02315/17/FUL - Development Appeal - 6th September 2018 (Dismissed)
6. CONSTRAINTS
CIL Zone: CIL2 Parish: Tring CP Residential Area (Town/Village): Residental Area in Town Village (Tring) Residential Character Area: TCA2 SPD Zone 3 Town: Tring
7. REPRESENTATIONS
Consultation responses
7.1These are reproduced in full at Appendix A.
Neighbour notification/site notice responses
7.2These are reproduced in full at Appendix B.
8. PLANNING POLICIES
Main Documents:
National Planning Policy Framework (February 2019) Dacorum Core Strategy 2006-2031 (adopted September 2013) Dacorum Borough Local Plan 1999-2011 (adopted April 2004)
Relevant Policies:
Dacorum Core Strategy
NP1 - Supporting Development CS1 - Distribution of Development CS4 - The Towns and Large Villages CS11 - Quality of Neighbourhood Design CS12 - Quality of Site Design CS26 – Green Infrastructure CS29 - Sustainable Design and Construction
Dacorum Local Plan
Appendix 3 – Layout and Design of Residential Areas
Supplementary Planning Guidance/Documents
Site Layout and Planning for Daylight and Sunlight: A Guide to Good Practice (2011)
9. CONSIDERATIONS Main Issues
9.1The main issues to consider are:
The policy and principle justification for the proposal; The quality of design and impact on visual amenity; The impact on residential amenity; and The impact on highway safety and car parking.
Principle of Development
9.2The application site is located within a residential area wherein, in accordance with Policy CS4 of the Dacorum Core Strategy, the principle of appropriate residential development is acceptable subject to compliance with the relevant local and national planning policies.
Quality of Design / Impact on Visual Amenity
9.3Policies CS11 and CS12 of the Dacorum Core Strategy state that, amongst other things, development should preserve attractive streetscapes, integrate with the streetscape character and respect adjoining properties in terms of materials.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
20/02378/FHA Re-cladding of existing two storey ancillary garden building and new velux windows-61 Longfield Road, Tring, Hertfordshire, HP23 4DFReport
5d20/02378/FHA Re-cladding of existing two storey ancillary garden building and new velux windows-61 Longfield Road, Tring, Hertfordshire, HP23 4DFThis decision
20/02378/FHA Re-cladding of existing two storey ancillary garden building and new velux windows-61 Longfield Road, Tring, Hertfordshire, HP23 4DFThis decision
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.