Resolved
Granted Condition(s) and Reason (s) 1. The development hereby permitted shall begin before the expiration of three years from the date of this permission. Reason: To comply with the requirements of Section 91 (1) of the Town and Country Planning Act 1990, as amended by Section 51 (1) of the Planning and Compulsory Purchase Act 2004. 2. The development hereby permitted shall be carried out in accordance with the following approved plans/documents: Plans 2762.03 C (Site Plan) 2762.05 A (Elevation) 2762.06 A (Elevation) Reason: For the avoidance of doubt and in the interests of proper planning. 3. No construction of the superstructure of the development shall take place until samples of the materials to be used in the construction of the development hereby approved. The development shall be carried out in accordance with the approved details. Please do not send materials to the Council offices. Materials should be kept on site and arrangements made with the Planning Officer for inspection. Reason: To make sure that the appearance of the building is suitable and that it contributes to the character of the area in accordance with Policies CS11 and CS12 of the Dacorum Borough Core Strategy (2013). 4. No development, including any demolition, shall commence unless and until a Demolition and Construction Methodology has first been submitted to and approved in writing by the Local Planning Authority to demonstrate that any proposed demolition, earthmoving, excavations, foundation construction or other building operations can be safely carried out without adversely affecting the stability of the adjacent canal infrastructure and to ensure that there would be no potential threat to the water environment of the adjoining canals and the wider network. Thereafter the development shall be carried out in full accordance with the approved details . Reason: The detail is required prior to commencement in the interests of the structural integrity of the waterway and to safeguard the environment in accordance with Paragraphs 170 & 178-179 of the NPPF. 5. No development shall take place until full details of the drainage proposals for the site have been submitted to and approved in writing by the Local Planning Authority. These details shall include: - Statement of compliance with the NPPF and NPPG policies, LPA local plan policies and HCC SuDS Policies. - Anecdotal information on existing flood risk with reference to most up to date data and information. - Establish location/extent of any existing and potential flood risk from all sources including existing overland flow routes, groundwater, flooding from ordinary watercourses referring to the national EA fluvial (river) and surface water flood maps. - Where infiltration is proposed, evidence of ground conditions/ underlying geology and permeability including BRE Digest 365 compliant infiltration tests should be provided. A ... view the full minutes text for item 5c