CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
East Hertfordshire District Council
Highways Joint Member Panel, Monday 7 November 2011 at 5.30pm

Sele Farm, Hertford: Petition Report

Decided Committee 3 papers

Highways Joint Member Panel decided this item on Monday 7 November 2011. Below is the council's own wording, with the papers it was decided on.

Item30

Resolved

RESOLVED – that (A) the report be received; (B) £2,000 be made available from the discretionary budget to support a traffic speed survey; (C) consideration of a 20 mph be supported as set out in Appendix A attached to the report now submitted; (D) consideration of a new controlled / uncontrolled pedestrian crossing be supported as set out in Appendix B attached to the report now submitted, including the need to consult with elected Members and key stakeholders to identify potential pedestrian crossing sites for future consideration; (E) consideration of isolated traffic calming measures for The Ridgeway be included in a future Urban Transport Plan (UTP) and for smaller scale measures, e.g. enhanced road signing, lining and gateway / entrance features be logged for consideration and implementation from any future discretionary budgets.
Word for word from the decision East Hertfordshire published for this meeting. Source: democracy.eastherts.gov.uk

Follow this further

Built from East Hertfordshire's papers

What the report saysPro

Report to Highways Joint Member Panel

Appendix A – Petition request for new 20mph speed restriction on Sele Farm

Recommendation Flow Chart 20 mph is consistent with Consideration of 20 mph Speed Limit Framework Limits and Zones £2,000 funding needed for FUNDING Consider through UNAVAILABLE future Discretionary initial traffic speed surveys funding routes FUNDING AVAILABLE SUPPORTED FUNDING BECOMES AVAILABLE Officers to liaise with elected Members and Key Stakeholders (e.g. HJMP Chairman, Vice Chairman, local Member and identified parties) to agree the position for all survey locations

Carry out traffic speed surveys on a small number of sample roads ANALYSED RESULTS SHOW 85th PERCENTILE SPEEDS 26mph OR ABOVE ON ONE OR MORE ROADS SURVEYED ANALYSED RESULTS SHOW 85th PERCENTILE SPEEDS 25mph OR BELOW ON ALL ROADS SURVEYED

FUNDING FUNDING STILL UNAVAILABLE £6,000 funding needed for UNAVAILABLE Consider through detailed traffic speed surveys future Discretionary funding routes FUNDING AVAILABLE SUPPORTED FUNDING BECOMES AVAILABLE Carry out traffic speed surveys on ANALYSED RESULTS SHOW all applicable roads 85th PERCENTILE SPEEDS 26mph OR ABOVE ON ONE OR MORE ROADS SURVEYED

ANALYSED RESULTS SHOW 85th PERCENTILE SPEEDS 25mph OR BELOW ON ALL ROADS SURVEYED

20 mph speed limit could be Only a 20 mph zone could considered further be considered further

Put a 20 mph limit forward for £3,000 funding needed for consideration in the next Urban outline design and estimated FUNDING Transport Plan (due 2015) FUNDING scheme delivery and STILL Consider through when the feasibility of a future UNAVAILABLE UNAVAILABLE implementation cost, including Put a 20 mph zone forward for future scheme can be tested against full testing against the Speed consideration in the next Urban Discretionary LTP Goals and Challenges and Management Strategy criteria Transport Plan (due 2015) funding routes then considered for available when the feasibility of a future funding against other candidate scheme can be tested against schemes LTP Goals and Challenges and FUNDING AVAILABLE then considered for available funding against other candidate SUPPORTED schemes FUNDING BECOMES AVAILABLE Is a 20 mph speed limit viable?

YES NO

£15,000 funding needed for 20 Retain 30 mph FUNDING FUNDING UNAVAILABLE mph limit scheme delivery and speed limit STILL Consider through implementation UNAVAILABLE future Discretionary funding routes FUNDING AVAILABLE

Implement 20 mph limit

Estimates shown are correct as of 2011/12

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Agenda item 8 Appendix AiAppendix 30 KB DownloadRead as text
PDF
Agenda item 8 Appendix BiAppendix 25 KB Download
PDF
Sele Farm, Hertford: Petition ReportAgenda 240 KB Withheld: personal details

At this meeting

Whole meeting

More from East Hertfordshire Highways Joint Member Panel

All decisions
MeetingDecisionOutcome
20 Aug 2012 Appointment of Chairman and Vice Chairman and Panel AdministrationRESOLVED – that (A) Councillor N Poulton be appointed Chairman for the meeting; and (B) Councillor P Ruffles be appoi... Decided Open
20 Aug 2012 Notes of the Panel MeetingAGREED – that the Notes of the meeting held on 19 March 2012 as amended, be approved as a correct record and signed b... Agreed Open
20 Aug 2012 Highways Joint Member Panel - Successor ArrangementsAGREED – that the report be noted. Agreed Open
20 Aug 2012 Highways Locality Budgets - Progress on works deliveryAGREED – that the report be noted. Agreed Open
20 Aug 2012 Lea Valley and Eastern Herts Area Plans, Hertford and Ware UTP, Bishop's Stortford and Sawbridgeworth UTPAGREED – that the report be noted Agreed Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies