HERTFORDSHIRE HIGHWAYS INTEGRATED WORKS PROGRAMME AND FORWARD WORKS PROGRAMME
Appendix A – Categories of Schemes and Prioritisation
A summary of the main programmes of work promoted by Hertfordshire Highways each year are summarised below with some background on how schemes are identified, categorised, selected and prioritised within each programme.
For full details Members are recommended to refer to the Environment Department’s ‘Highways and Transport Programme Entry’ document for overall guidance and the core procedures of how IWP and FWP schemes are identified, categorised, selected and prioritised.
A1 Carriageway Refurbishment Schemes
The objective of our strategy, using an asset management approach, is to optimise the works programme to keep the average condition of the network as good as possible for a given level of investment.
Condition data is derived from the results of various surveys but most importantly: • SCANNER (machine-based condition survey) – A,B & C Roads • CVI (Coarse Visual Inspection) – U Roads
Additional information (used where it is available) is: • Age of the carriageway • Historical work undertaken (both schemes and reactive repairs on faults) • Strength/construction of the road • Traffic counts
With this data it has been possible to model the likely deterioration of each section of road and identify an optimum programme of maintenance activity that best improves the condition of the network overall with the funding available. By considering the overall condition of the carriageway construction and the rate of deterioration of road sections across the network the maintenance strategy gives a priority to sections whose residual life will be extended substantially with modest intervention. This can mean that the worst looking carriageway surface will not always be prioritised for immediate major refurbishment and the programmed action may involve some low cost short term patching and dressing, for example. In essence the strategy adopts the principle of “a stitch in time saves nine”.
Identifying situations where earlier treatments of faults will prevent further deterioration of the asset while returning the asset to better condition entails developing alternative repair strategies over a longer period. This will then enable cost analysis, which will minimise the whole of life cost over the whole asset.
The early intervention strategy has two advantages: • The cost of the repairs is lower the earlier in the deterioration process they occur. More assets can be repaired for the same amount of expenditure. • With early repairs the overall condition of the asset is kept at a higher value.
Carriageway refurbishment schemes are initially identified by using the deterioration modelling; proposed scheme lists are then refined using local engineering judgement.
A2 Footway and Cycleway Refurbishment Schemes
Footway and cycleway refurbishment schemes are initially identified and nominated by District Managers and their local teams (in a manner similar to drainage). They are then prioritised against other nominations across the County by consideration of: • Hierarchy of the footway/cycleway • Condition of footway/cycleway • Proposed treatment • History of insurance claims • History of reactive work previously undertaken
A3 Drainage Schemes
Drainage improvement schemes are initially identified and nominated by District Managers and their local teams (in a manner similar to footways and cycleways) to tackle identified drainage problems. These are then prioritised against other nominations across the County by consideration of: • Severity of the problem for pedestrians • Severity of the problem for vehicles • Frequency of the problem • Repeat maintenance caused by the problem • Potential pollution caused by the problem • Accidents and/or claims linked to the problem
A4 Integrated Transport Schemes
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Agenda Item 13 Appendix A: Main CategoriesAppendix | 39 KB | DownloadRead as text |
PDF |
Agenda item 13 Appendix C mainAppendix | 57 KB | Download |
PDF |
Agenda item 13 Appendix D changesAppendix | 75 KB | Download |
PDF |
Agenda item 13 Appxendix BAgenda | 862 KB | Download |
PDF |
Agenda item 13 D2 mapAgenda | 6.9 MB | Download |
PDF |
Agenda item 13 ppendix E: Feedback: East HertsAgenda | 20 KB | Download |
PDF |
Integrated Works ProgrammeAgenda | 101 KB | Download |
Follow Highways Joint Member Panel at East Hertfordshire and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 20 Aug 2012 | Appointment of Chairman and Vice Chairman and Panel AdministrationRESOLVED – that (A) Councillor N Poulton be appointed Chairman for the meeting; and (B) Councillor P Ruffles be appoi... | Decided | Open |
| 20 Aug 2012 | Notes of the Panel MeetingAGREED – that the Notes of the meeting held on 19 March 2012 as amended, be approved as a correct record and signed b... | Agreed | Open |
| 20 Aug 2012 | Highways Joint Member Panel - Successor ArrangementsAGREED – that the report be noted. | Agreed | Open |
| 20 Aug 2012 | Highways Locality Budgets - Progress on works deliveryAGREED – that the report be noted. | Agreed | Open |
| 20 Aug 2012 | Lea Valley and Eastern Herts Area Plans, Hertford and Ware UTP, Bishop's Stortford and Sawbridgeworth UTPAGREED – that the report be noted | Agreed | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.