Resolved
RESOLVED – that in respect of application 3/11/2048/FP, planning permission be granted subject to the conditions detailed in the report now submitted.
Development Management Committee decided this item on Wednesday 29 February 2012. Below is the council's own wording, with the papers it was decided on.
Resolved
RESOLVED – that in respect of application 3/11/2048/FP, planning permission be granted subject to the conditions detailed in the report now submitted.
That planning permission be GRANTED subject to the following conditions:
1. Three year time limit (1T12)
2. Approved plans (2E10): 1005.2.3/01A, 1005.2.3/02D, 1005.2.3/03B, 1005.2.3/04B, 1005.2.3/05, 1005.2.3/06A, 1005.2.3/07, 1005.2.3/08A, 1005.2.3/09, 1005.2.3/10, 1005.2.3/11A, 1005.2.3/12A, 1005.2.3/13A, 1005.2.3/14, 16511-1001, 12/10/2011.1, JEC/300/01 and JEC/300/02.
3. Programme of archaeological work (2E02)
4. Boundary walls and fences (2E07)
5. Materials of Construction (2E11)
6. Obscure glazing (2E18)
7. Refuse disposal facilities (2E24)
8. Lighting Details (2E27)
9. Materials arising from demolition (2E32)
10. Hard Surfacing (3V21)
11. Provision and retention of parking spaces (3V23) with amendment to require the provision of access bollards.
12. Wheel washing facilities (3V25)
13. Landscape Design Proposals (4P12) (c, d, f, g, h, I, j and k) with amendment to specify date of implementation.
14. Landscape Works Implementation (4P13) 3/11/2048/FP
15. Construction hours of working-plant and machinery (6N07)
Directives:
1. Other legislation (01OL)
2. Street Naming and Numbering (19SN)
Summary of Reasons for Decision
The proposal has been considered with regard to the policies of the Development Plan (East of England Plan May 2008, Hertfordshire County Structure Plan, Minerals Local Plan, Waste Local Plan and the saved policies of the East Herts Local Plan Second Review April 2007), and in particular policies SD1, SD2, SD3, HSG1, HSG3, HSG4, HSG6, TR1, TR2, TR7, TR8, TR14, ENV1, ENV2, ENV3, ENV4, ENV20,ENV21, ENV23, BH6, IMP1 and PPS1, PPS3 and PPS5.The balance of the considerations having regard to those policies is that permission should be granted.
(204811FP.SD)
1.1The application site is shown on the attached OS extract. It is situated to the south of Ware Road on the site of the Baker Street car park, within Hertford Conservation Area. As indicated, the site currently comprises a public car park site, constructed in the late 1960’s. The site is 0.12 hectares in size, in the form of a tapering wedge shaped piece of hard surfaced land running east to west, narrowing to the eastern boundary. The site is currently within the ownership of East Herts District Council.
1.2To the south west of the application site are single and two storey office buildings occupied by the Red Cross, with dedicated car parking.
1.3To the north of the site are modern residential flats over two floors at first and second. The commercial unit Hertford Glass with associated commercial buildings faces the northern boundary of the site, with its open yard offering views through to the Ware Road.
1.4An open culvert to the River Lee runs along the south boundary of the site, where a buffer zone of 8m of undeveloped land adjacent to the water course, remains in the control of the Environment Agency. Beyond the culverted watercourse are the service access road and buildings of the retail park, all enclosed by walling. 3/11/2048/FP
1.5The application proposes a contemporary three storey building which will provide 14 young person housing units. Eleven of these will be two person bedsit units, the remaining three are mother and baby units. An additional three storey linked building will provide communal areas for training, office space and meeting rooms. Parking, communal open space, small rear gardens for the ground floor units, landscaping to boundaries, cycle storage provision, staff and visitor parking are all provided within the site.
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
3/11/2048/FP: Proposed young peoples housing scheme consisting of 14 2 bed bedsit flats and associated staff and training facilities plus parking and garden areas on a site currently used as a Council car park at Baker Street, Hertford for Aldwyck Housing GroupReport | 75 KB | DownloadRead as text |
PDF |
3112048FP EHDC Car Park Baker Street HertfordReport | 138 KB | Download |
Follow Development Management Committee at East Hertfordshire and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 12 Aug 2026 | 3/25/1986/FUL - Erection of 4 x industrial units (use classes E[g], B2 and B8) with associated parking and external works at Buntingford Business Park, Baldock Road, BuntingfordRESOLVED - in accordance with paragraph 6.5.6 of the constitution, Fergus Alexander be permitted to address the Commi... | Decided | Open |
| 12 Aug 2026 | Items for Reporting and NotingRESOLVED – that the following reports be noted: (A) Appeals against refusal of planning permission / non-determinatio... | Noted | Open |
| 15 Jul 2026 | Appointment of Vice-Chair for the 2026/27 civic yearRESOLVED – that Councillor J Thomas be appointed Vice-Chair of the Development Management Committee for the 2026/27 c... | Decided | Open |
| 15 Jul 2026 | Minutes - 15 April 2026RESOLVED – that the Minutes of the meeting held on 15 April 2026, be confirmed as a correct record and signed by the ... | Decided | Open |
| 15 Apr 2026 | Minutes - 11 March 2026RESOLVED – that the Minutes of the meeting held on 11 March 2026, be confirmed as a correct record and signed by the ... | Decided | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.