Resolved
RESOLVED – that in respect of application 3/11/2216/FO, planning permission be granted subject to the conditions detailed in the report now submitted.
Development Management Committee decided this item on Wednesday 29 February 2012. Below is the council's own wording, with the papers it was decided on.
Resolved
RESOLVED – that in respect of application 3/11/2216/FO, planning permission be granted subject to the conditions detailed in the report now submitted.
That, planning permission be GRANTED subject to the following conditions:
1. The use of the temporary car park as shown on plan no. 4156/05 Rev A shall cease on 30 April 2012 and the temporary surfacing shall be removed and the land reinstated within 1 month of that date.
Reason: This part of the proposed development is contrary to the provisions of the East Herts Local Plan Second Review April 2007 and is a temporary expedient only.
2. Approved plans (2E10) 01, 4156/05 A.
Summary of Reasons for Decision
The proposal has been considered with regard to the policies of the Development Plan (East of England Plan May 2008, Hertfordshire County Structure Plan, Minerals Local Plan, Waste Local Plan and East Herts Local Plan Second Review April 2007), and in particular policies GBC1, ENV1, ENV2, ENV3, ENV16, ENV19, ENV23, LRC1, LRC5, BH1, BH2, BH3 and BH6. The balance of the considerations having regard to those policies and the temporary nature of the development is that permission should be granted.
(221611FP.MP)
1.1Members may recall that planning permission was granted by the Development Control committee meeting on 20th July 2011, under LPA reference 3/11/0544/FP for the re-surfacing of the existing car park at 3/11/2216/FP
Grange Paddocks, a temporary car park, new foot bridge beside vehicle bridge; pedestrian and cycle path alongside the River Stort with link to Grange Paddocks; links to existing bridges and installation of lampposts along the route from Rye Street to Castle Gardens. That development has now started to be implemented and the re-surfacing of the Grange Paddocks car park has now been completed.
1.2Members will note that, within the above permission, a temporary car park was granted planning permission. The purpose of that temporary car park was to ensure that appropriate levels of parking were provided during the re-surfacing works to the existing car park. A condition was attached within that permission requiring the cessation of that temporary car park within one month of the completion of the resurfacing works, and the reinstatement of the land. This application seeks an extension of the use of the temporary car park until 01 April 2012.
1.3The application site is shown on the attached OS extract. Grange Paddocks is the Council’s leisure centre in Bishop’s Stortford. It comprises a swimming pool, gym and studio within the main building, sports pitches, two large surface car parks and ancillary facilities. The site is accessed over the River Stort from Rye Street by a bridge. The temporary car park is located to the north of the existing leisure complex and parking area. It is rectangular in shape and has some 126 parking spaces.
1.4The site lies within a green finger, an area of open land extending northwards from the town centre, bounded by the railway line to the east and Rye Street to the west, which is designated Green Belt. There is a significant amount of existing landscaping and an existing unmade footpath which runs along the River Stort from the skate park to the edge of the playing fields. Residential properties lie to the west of the River Stort and are separated from the site by the River Stort and landscaping. To the east, beyond the playing fields and the railway line are more residential properties.
2.0Site History:
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
3/11/2216/FO: Variation of condition 6 of LPA ref 3/11/0544/FP which states "The use of the temporary car park as shown on plan: 4156/05 shall cease upon the completion of the approved works to the car parks and the temporary surfacing shall be removed and the land reinstated within 1 month of thatReport | 38 KB | DownloadRead as text |
PDF |
3112216FP Land Adjacent River StortReport | 549 KB | Download |
Follow Development Management Committee at East Hertfordshire and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 12 Aug 2026 | 3/25/1986/FUL - Erection of 4 x industrial units (use classes E[g], B2 and B8) with associated parking and external works at Buntingford Business Park, Baldock Road, BuntingfordRESOLVED - in accordance with paragraph 6.5.6 of the constitution, Fergus Alexander be permitted to address the Commi... | Decided | Open |
| 12 Aug 2026 | Items for Reporting and NotingRESOLVED – that the following reports be noted: (A) Appeals against refusal of planning permission / non-determinatio... | Noted | Open |
| 15 Jul 2026 | Appointment of Vice-Chair for the 2026/27 civic yearRESOLVED – that Councillor J Thomas be appointed Vice-Chair of the Development Management Committee for the 2026/27 c... | Decided | Open |
| 15 Jul 2026 | Minutes - 15 April 2026RESOLVED – that the Minutes of the meeting held on 15 April 2026, be confirmed as a correct record and signed by the ... | Decided | Open |
| 15 Apr 2026 | Minutes - 11 March 2026RESOLVED – that the Minutes of the meeting held on 11 March 2026, be confirmed as a correct record and signed by the ... | Decided | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.