The Committee agreed: (1) Option 3C for the Joint Data Centre with Elmbridge Borough Council hosted at a third party datacentre; (2) The funding from existing capital budgets of £63,000 and the use of £139,600 additional capital funds as detailed in Table 3 contained in Annexe 1 to the report (considered exempt from publication); (3) The annual revenue saving of £17,800 be transferred into an earmarked reserve for future IT renewals and replacements as detailed in Table 3 contained in Annexe 1 to the report (considered exempt from publication).
Word for word from the decision Epsom and Ewell published for this meeting.Source: democracy.epsom-ewell.gov.uk
2.1Epsom and Ewell: The original Epsom datacentre was built as part of the original building in the Town Hall, in the 1980's at a time when Councils needed machine rooms with large amounts of cooling and power. Taking up that original space is now the Datacentre, the ICT Training room and the Print Room. Over the years the Council has ensured that the space has been reduced as the technology has improved.
2.2However, the room is not fit for purpose:
2.2.1 It is not a specifically designed Datacentre.
2.2.2 There is no fire suppression system.
2.2.3 Air conditioning systems are not specific data centre units but designed for office environments.
2.2.4 These units have water pipes running near server units.
2.2.5 Not a clean environment – floors are carpeted, suspended ceiling/floor etc.
2.3The server infrastructure was procured in 2009, which introduced Server Virtualisation for the council consolidating approximately 50 physical servers down to 3. In 2010 due to the expansion of the number of virtual servers and services (for example document management system & CRM) this increased to 5 servers. As additional virtual servers were continuing to be commissioned more memory was purchased for the physical servers.
2.4The storage infrastructure was purchased at the same time in 2009, again due to expansion of data and services over the years, the storage was replaced in 2014 providing additional storage capacity and performance.
2.5Virtual Desktop Infrastructure (VDI) was introduced in 2011 to consolidate the Councils 300+ desktops onto 6 physical servers.
2.6Backups are currently created on-site at the Town Hall then duplicated to tape, the tapes are stored on the other side of the building apart from the Friday nights tape which is taken off-site to Bourne Hall on the following Monday morning. Disaster Recovery: key servers are replicated to Elmbridge but a larger issue would rely on external contract for ship to site hardware and would be a slow process for restoring from tape. STRATEGY AND RESOURCES COMMITTEE 27 SEPTEMBER 2016
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Follow Strategy and Resources Committee at Epsom and Ewell and we tell you when its next papers are published, before the meeting rather than after it.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.