The Cabinet agreed that the Department of Transport be informed that: (1) the Borough Council welcomes the recently published work on taking the issue of the forward and that it expects to be centrally involved in any future study work, which must look inside as well as outside London; (2) any route on the alignment of route C is not acceptable on environmental grounds, whatever the costs; (3) short term options for boosting capacity of the existing crossing are welcomed and should include abolition of the tolls.
Word for word from the decision Gravesham published for this meeting.Source: democracy.gravesham.gov.uk
Purpose and summary of report: Department for Transport has published a report on options for increased capacity across the Thames in North Kent. Recommendations: That the Department of Transport be informed that: (i) The Borough Council welcomes the recently published work on taking the issue of the Lower Thames Crossing forward and that it expects to be centrally involved in any future study work, which must look inside as well as outside London; (ii) Any route on the alignment of route C is not acceptable on environmental grounds; (iii) Short term options for boosting capacity of the existing crossing are welcomed and should include abolition of the tolls.
1. Introduction
1.1In 2008 Department for Transport commissioned Parsons Brinckerhoff to carry out a study of the Dartford River Crossing. Their report was completed in January 2009 and published in April 2009. On the basis of the report the Department has committed itself to further study work without as yet providing any timescales. There is no consultation to be responded to.
1.2The study was a about a future work with the objectives of:
• Examining future demand to 2037 and how that might be met;
• What sort of short term solutions there may be for the existing crossing;
• Evaluate as far as possible using existing models and data what the benefits and impact of new crossing capacity might be.
1.3It was not the objective of the study to make specific recommendations as to what should be done or the location of any additional capacity, though routes etc had to be examined to produce the analysis. The results of the study can be divided between the existing crossing operation and enhancement and long term options. 2. Existing crossing and enhancement
2.1The first Dartford Tunnel was provided in 1963, the second (larger tunnel) followed in 1980 and the Queen Elizabeth bridge in 1991. The result is 4 lanes northbound and southbound, which for various reasons impose capacity constraints on traffic flow compared with a normal 4 lane dual carriageway:
• Toll collection; • Location of junctions and the resulting weaving movements (Junc 30 & 31 on the north side, 1a and 1b on the south) and therefore a low safety record; • Splitting of flows into two tunnels northbound, one of which is smaller than the other; • Lack of hard shoulders for when accidents do occur (further exacerbated in the tunnels by specific safety requirements). 2.2 Analysis shows the crossing is operating at around 145-150,000 vehicles per day, though in the last few years (pre recession) the figures have reduced, albeit with a growth in HGV’s. There are no pronounced peaks daily, weekly or seasonally though small variations do occur. The general implication is that crossing is at capacity and demand is being chocked off. Survey and census data for example suggest that much less interaction between Dartford/Gravesham and Thurrock than might be expected from geographic proximity.
2.3Some analysis is provided of the flows on the crossing based on modelling. For light vehicles (private and commercial) 46% if trips have origins or destinations in South London or the South, the rest (54%) are North Kent, Mid Kent or Dover. For HGV’s the figures 20% and 80% respectively, showing that flows from cross channel traffic are highly significant. For light vehicles 51% of trips are over 60km and HGV’s 77% illustrating the crossings role in long distance movements.
2.4A four lane road should support about 7,000 pcu’s in each direction (pcu - passenger car units, where in this study an HGV is equivalent to 2.3 cars), whereas the crossing manages about 5,000 rising to 5,500 at peak times. Delays seem to occur when the flow reaches about 4,000 pcu. As noted above these delays are the result of a number of factors not just the tolls.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.