Resolved
Resolved that the report be noted.
Gravesham Joint Transportation Board noted this item on Wednesday 17 June 2009. Below is the council's own wording, with the papers it was decided on.
Resolved
Resolved that the report be noted.
Gravesham Borough Council
Report to: Joint Transportation Board
Date: 17th June 2009
Reporting officer: Head of Countywide Improvements
Subject: Highway and Transportation Schemes Progress Report – 2009/10 Purpose and summary of report: This report advises members of the progress of highway and transportation schemes in Gravesham.
Recommendations: For information and comment.
1. Background.
1.1For each highway improvement scheme in Gravesham, Appendix 1 summarises progress to date and anticipated progress prior to the next meeting of this Board.
1.2Schemes that have been added to the programme or that have changed significantly since last reported to this Board are discussed as follows:
2. Discussion
2.1London Road Northfleet: drainage improvements to footway outside Rosherville Post Office. The footway outside the Post Office at 55 London Road is too flat to drain rainwater into the gulley. Bus stop alterations outside the shop that were necessary to better accommodate Fastrack vehicles exacerbated the problem and as a result customers have to walk through deep puddles. To remedy this, Kent Highway Services will be reconstructing the whole footway and installing a new drainage channel to keep the footway clear of standing water. The work will be funded from the £50,000 allocated in 2009- 10 to fund pedestrian improvements in the Borough.
2.2Wellington Street / Peacock Street, Gravesend: reverse direction of one- way traffic in both roads. The aim of this scheme is to reduce the attractiveness of these side roads to eastbound drivers wishing to queue-jump the Ordnance Road traffic signals. If drivers do persist in using this route then traffic joining from Peacock Street will be less likely to impede westbound traffic in Milton Road. Works were scheduled to start in February 2009 but Network Rail’s emergency works to the Peacock Street overbridge necessitated a six- week delay. Works recommenced after Easter, but it transpired that the order for EdF to transfer the electrical supplies from the old to new traffic signs had been mislaid. EdF advised that they were unable to reschedule their work to be a priority and the new signs will therefore not be lit until the end of June. Because one-way signs need to be illuminated before they can be enforced, the physical reversal of traffic flow will not happen until July.
2.3Wrotham Road, Gravesend: Phase 2 of Gravesend-to-Istead Rise Cycle Route (A2 to Chalky Bank). In winter 2008, Kent Highway Services converted the western footway on Wrotham Road between Istead Rise and the A2 to a shared-use cycle path. Concurrently, the Highways Agency opened the new alignment of the A2, converting the eastern footway under both A2 bridges to a shared-use cycle path. This year will see the former A2 transformed into the Gravesend Linear Park opening up extensive off-road cycle facilities for local residents. To link these all these schemes to the existing cycle route along Wrotham Road north of Chalky Bank, Kent Highway Services is to construct a series of cycle paths and cycle lanes on and along Wrotham Road to provide a continuous route for all riders. Works are scheduled to start in November 2009.
2.4A227 Wrotham Road (A2 to A20): Speed and traffic management. For some time there has been a local desire to downgrade the status of the A227 Wrotham Road from a primary (“A” road) to a secondary (“B” road) distributor. However, the cost of doing this is out of proportion to the benefits this change, alone, would be likely to achieve. However, a worthwhile change in driver behaviour could be achieved by providing advisory lorry-route signing for non- local traffic and making the speed limits along the road more closely suit the local environment. The concept of these proposals has been shared with the police and local Members and detailed proposals will be ready for public consultation this summer.
BACKGROUND DOCUMENTS: The background papers pertaining to this report are held on the Kent Highway Services files.
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Highway and Transportation Schemes Progress Report: 2009/10Report | 66 KB | DownloadRead as text |
Follow Gravesham Joint Transportation Board at Gravesham and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 10 Mar 2021 | Bath Street - Fastrack Infrastructure SchemeResolved that the report be noted. | Noted | Open |
| 10 Mar 2021 | Highway Forward Works Programme - 2019/20 onwardsResolved the report be noted. | Noted | Open |
| 10 Mar 2021 | Issues raised by Councillors with the approval of the ChairIt was agreed that the results of the ATC be shared with Cllr Rana. It was noted that the officer had previously disc... | Agreed | Open |
| 14 Mar 2018 | Gravesham Highway Works Programme 2017/18Resolved that the Board noted the information contained within the report and agreed the following: · The Gravesham D... | Noted | Open |
| 14 Mar 2018 | Petitions from residents at the JTB (KCC Petition Scheme)Resolved that the Board look at the original JTB Legal Agreement between KCC and GBC with the view to amending it to ... | Agreed | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.