To: Gravesham Joint Transportation Board
By: KCC Highways, Transportation & Waste
Date: 7th December 2016
Subject: Highway Works Programme 2016/17
Classification: Information Only
Summary: This report updates Members on the identified schemes approved for construction in 2016/17
1. Introduction
This report provides an update and summarises schemes that have been programmed for delivery in 2016/17
Footway and Carriageway Improvement Schemes – see Appendix A
Drainage Repairs & Improvements – see Appendix B
Street Lighting – see Appendix C
Transportation and Safety Schemes – see Appendix D Casualty Reduction Measures Local Growth Fund
Developer Funded Works – see Appendix E
Bridge Works – see Appendix F
Traffic Systems – see Appendix G
Combined Member Fund – see Appendix H
Conclusion
1. This report is for Members information. Contact Officers:
The following contact officers can be contacted on 03000 418181
Carol Valentine Highway Manager (West) Lisa Gillham Gravesham District Manager Alan Casson Resurfacing Manager Katie Moreton Drainage Manager/Structures Manager Sue Kinsella Street Lighting Manager Toby Butler Intelligent Transport Systems Manager Melvyn Twycross PROW Jamie Hare Developer Funded Work Jamie Watson Transportation and Safety Schemes Jamie Watson Combined Member Fund Appendix A – Footway and Carriageway Improvement Schemes
The delivery of these schemes is weather dependent; should it prove not possible to carry out these works on the planned dates, new dates will be arranged and the residents will be informed by a letter drop to their homes.
Machine Resurfacing – Contact Officer [name removed] Name Parish Extent of Works Current Status
IN PROGRESS Between Rosherville Way and Phase 1 19th Oct – Crete Hall Road Northfleet Kimberly Clark Roundabout mid Dec FULL RECON Phase 2 & 3 mid Jan to end of March Londonbound Wainscott A289 Wainscott Shorne bypass under Three Crutches Completed Bypass / Hasted Road and M2 flyovers
Footway Improvement - Contact Officer [name removed] Length Station Road Meopham (Footway protection Completed Treatment) Entire Length Orchard Drive Meopham (Footway protection Completed Treatment)
Surface Treatments - Contact Officer [name removed] Surfacing Avon Close Gravesend Completed Whole Length Surface Dressing Buckland Road Luddesdowne Lockyers Hill to Cutters Completed Ridge Micro Surfacing Downs Road Gravesham Completed Nash Bank to Arcadia Road Micro Surfacing Longfield Road Meopham Wrotham Road to change Completed of surface Micro Surfacing Stuart Road Gravesend Postponed Whole Length Appendix B – Drainage
Drainage Works – Contact Officer Katie Moreton
Road Name Parish Description of Works Current Status
No drainage works planned over £5000
Appendix C – Street Lighting
Structural testing of KCC owned street lights has identified the following as requiring replacement this financial year. A status of complete identifies that the column replacement has been carried out. Programme dates are identified for those still requiring replacement.
Street Lighting Column Replacement – Contact Officer Sue Kinsella
Road Name Parish Description of Works Status
1 completed/ 1 to Earl Road Gravesend Replacement of 2 no street light complete by December 2016
4 complete/1 to complete Chalk Road Gravesend Replacement of 5 no street lights by December 2016
2 completed/ 1 to Overcliffe Gravesend Replacement of 3 no street lights complete by December 2016
Works to be Eden Place Gravesend Replacement of 2 no street lights programmed
Works to be Artillery Row Gravesend Replacement of 6 no street lights programmed
Works to be Armoury Drive Gravesend Replacement of 5 no street lights programmed Works to be Cerne Road Gravesend Replacement of 1 no street lights programmed
Works to be Coombe Road Gravesend Replacement of 1 no street lights programmed
Works to be Glen View Gravesend Replacement of 1 no street lights programmed
Works to be London Road Gravesend Replacement of 7 no street lights programmed
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Highway Works Programme 2016/17Report | 145 KB | DownloadRead as text |
Follow Gravesham Joint Transportation Board at Gravesham and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 10 Mar 2021 | Bath Street - Fastrack Infrastructure SchemeResolved that the report be noted. | Noted | Open |
| 10 Mar 2021 | Highway Forward Works Programme - 2019/20 onwardsResolved the report be noted. | Noted | Open |
| 10 Mar 2021 | Issues raised by Councillors with the approval of the ChairIt was agreed that the results of the ATC be shared with Cllr Rana. It was noted that the officer had previously disc... | Agreed | Open |
| 14 Mar 2018 | Gravesham Highway Works Programme 2017/18Resolved that the Board noted the information contained within the report and agreed the following: · The Gravesham D... | Noted | Open |
| 14 Mar 2018 | Petitions from residents at the JTB (KCC Petition Scheme)Resolved that the Board look at the original JTB Legal Agreement between KCC and GBC with the view to amending it to ... | Agreed | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.