This report provides an update on rail service operation and performance across Greater Manchester over rail Periods 10 and 11, 2020/21 (13 December 2020 – 06 February 2021).
Recommendations
Members are asked to note the contents of this report.
TRACKING/PROCESS Does this report relate to a major strategic decision, as set out in the No GMCA Constitution
EXEMPTION FROM CALL IN Are there any aspects in this report which n/a means it should be considered to be exempt from call in by the relevant Scrutiny Committee on the grounds of urgency? GM Transport Committee Overview & Scrutiny Committee n/a n/a INTRODUCTION
1.1This report provides an update on local rail service operations and performance covering rail periods 10 and 11, 2020/21 (13 December 2020 – 06 February 2021).
1.2The report is structured under subject headings aligned with the following key areas of focus for TfGM in relation to rail service delivery.
Periods 10 and 11 overview, including: Network Rail performance and updates Route crime Train operator performance and updates Patronage and footfall updates Monitoring of face covering compliance. Details of May 2021 timetable 1.3 A list of rail period dates for 2020/21 can be found in Appendix A.
1.4A geographic map showing all Greater Manchester rail lines and stations can be found in Appendix B.
1.5Individual PPM vs Target and Moving Annual Average graphs can be found in Appendix C for all six GM TOCs. This also includes cancellation and short formation graphs for Northern and TPE.
1.6Right Time Line of Route performance for Northern and Service Group performance for TPE can be found in Appendix D.
1.7Appendix E provides an overview of Northern’s current train plan, whilst May 2021 train plans are detailed in Appendix F.
OVERVIEW
2.1Operational performance has remained consistent over the periods covered by this report, although some declines were recorded during Period 11, largely due to severe weather caused by Storm Christoph in the second week of the period.
2.2The December 2020 timetable on 13 December saw a further uplift in train services across Greater Manchester, representing around 88% of pre-Covid trains.
2.3Industry preparations for Christmas (Covid restriction) relaxations included easement of ticketing and peak restrictions, additional strengthening and standby buses, however, were not subsequently needed due to a change in government policy. Christmas services operated to a similar format of previous years and planned engineering works were successfully completed on schedule. 2.4 In response to a third national lockdown on 05 January and DfT instructions to focus on maintaining a reliable service for essential workers, whilst reducing operating costs, emergency train plans were once again introduced on 18 January for Northern, with other TOCs and TPE making changes on 25 January. These plans followed a similar pattern to operations between July – September 2020, with around 70% of pre-Covid services operating.
2.5Patronage has declined from around 30% of pre-Covid levels in the lead up to Christmas to 15% for Northern and less for TPE and the longer distance operators. Footfall at Piccadilly station remains subdued, at around 15% of pre-Covid levels.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Follow Greater Manchester Transport Committee at Greater Manchester Combined Authority and we tell you when its next papers are published, before the meeting rather than after it.
Minutes of the Sub Committee MeetingsThat the minutes of the Metrolink & Rail Sub Committee held on 3 March 2023 be noted. 2. That the minutes of the Bus ...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.