That the contents of the report be noted. 2. That it be noted that as a result of previous discussions at GMTC, a site visit had taken place at the Hollingworth Metrolink stop which had resulted in a full review of lighting and vegetation and investigations into the maintenance of adjoining private land.
Word for word from the decision Greater Manchester Combined Authority published for this meeting.Source: democracy.greatermanchester-ca.gov.uk
Follow this further
Built from Greater Manchester Combined Authority's papers
Appendix 1: Period Date Listing Appendix 2: Face Covering Compliance
Comments/recommendations from Overview & Scrutiny Committee
BACKGROUND PAPERS: n/a
TRACKING/PROCESS Does this report relate to a major strategic decision, as set out in the No GMCA Constitution
EXEMPTION FROM CALL IN Are there any aspects in this report which n/a means it should be considered to be exempt from call in by the relevant Scrutiny Committee on the grounds of urgency?
GM Transport Committee Overview & Scrutiny Committee n/a n/a 1. ABOUT METROLINK
1.1Metrolink is the largest urban light rail network in the UK. It provides a fast, frequent service which is fully accessible to all, running 7 days a week, 364 days of the year.
1.2The Metrolink network is owned by TfGM and is operated on TfGM’s behalf through a contract with KeolisAmey Metrolink (KAM).
1.3The network uses high-floor trams with raised platform stops and had reached patronage of over 45 million passengers each year, pre COVID.
1.4There are currently 121 operational trams serviced from two depots. All available trams run in service on weekdays, with as many doubles as possible to facilitate social distancing.
1.5Trams serve 99 stops covering routes totalling just over 100km. Metrolink is the most accessible of the public transport networks in Greater Manchester, providing step free access across the entire network.
2. PERFORMANCE SUMMARY
2.1The Metrolink Quarterly Performance Report provides a performance summary for the rolling 12-month period.
2.2The third national lockdown in place from 05 January 2021 resulted in patronage falling to between 17% and 19% of pre-COVID levels. Following the government recovery roadmap announcement on 22 February, it is expected that patronage will now start to increase as pupils and students return to education and lockdown restrictions begin to ease.
2.397.9% of scheduled miles were operated during the 12 months to February 2021 against a performance target of 99.4%. Performance was impacted by vehicle availability issues and storm Christoph. Vehicle availability has also been impacted by the localised increase in criminal damage which has removed trams from service whilst repairs are completed.
2.4Recorded incidents of crime and anti-social behaviour on the network have reduced from 198 in December to 181 in January and 22 fewer incidents reported than in January 2020.
2.5TravelSafe Days of Action have continued throughout January and February, with a continued focus on locations where ASB has been reported and low face covering compliance noted. In February, TravelSafe completed the 50th Day of Action since July 2020.
2.6Continuation and monitoring of COVID measures continues following the roll out of additional touch point cleaning, hand sanitisers and Trambassadors. Work has been underway to restart the school engagement ahead of the 8 March with particular focus on the schools and locations where compliance was lower last year. Patronage
2.7Patronage measures the number of trips that are being made on the network.
2.8COVID has significantly impacted patronage on the Metrolink network as can be seen in the chart below.
100%: pre-COVID average
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Follow Greater Manchester Transport Committee at Greater Manchester Combined Authority and we tell you when its next papers are published, before the meeting rather than after it.
Minutes of the Sub Committee MeetingsThat the minutes of the Metrolink & Rail Sub Committee held on 3 March 2023 be noted. 2. That the minutes of the Bus ...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.