Royal Borough of Greenwich
Planning Board, Tuesday 18 November 2025 at 6.30pm

Stadium Road and Baker Road, Woolwich, SE18 - Ref: 24/0406/F

Noted Planning 2 papers

AI summaryGreenwich Planning Board notes withdrawal of Stadium Road and Baker Road highway upgrade application before meeting, with no decision made.

AI summaryIn plain English

Written from the decision and the officer reportPDF Pro
OutcomeNotedNoted by Planning Board, no vote taken
MoneyNot stated
What happens nextNone for this meetingApplication not determined
Who it affectsWoolwich Common and Charlton Hornfair wardsStadium Road and Baker Road, SE18, ref 24/0406/F

What was decided

The Planning Board noted that the application for the upgrade of Stadium Road and Baker Road was withdrawn at the applicant's request before the meeting, so no determination was made.

Why

The applicant asked for the application to be withdrawn in advance of the meeting, so the Board could not consider the proposed road reconstruction and cycleway.

What happens next

No further steps at this meeting; the application has not been determined and may be re-submitted by the applicant.

Options considered

  • Rejected: Grant full planning permission for the highway upgrade with 22 conditions and 3 informatives as set out in the officer appendices. Application withdrawn by the applicant before the meeting, so no vote was taken

Implications

  • Other: No planning decision has been made on the proposed upgrade of Stadium Road and Baker Road, including the new cycleway and adoption as public highway.

Who and where

  • Residents and users of Stadium Road and Baker Road, Woolwich, SE18
  • Woolwich Common and Charlton Hornfair wards

Timeline

  • 2025-11-18: Planning Board meeting at which the withdrawal was noted
What was decided, why, and what happens next

Pro reads every officer report for you and explains each decision in plain English: the money, the options, the risks, the timeline, each with the paragraph it came from.

Written by AI from the council's published papers. AI can get things wrong: the council's own wording below is the record.Report a problem
Item5

Resolved

Resolved that it was noted the application was withdrawn at the applicant’s request, in advance of the meeting.
Word for word from the decision Greenwich published for this meeting. Source: committees.royalgreenwich.gov.uk

Follow this further

Built from Greenwich's papers

What the report saysPro

Report to Planning Board

Appendices Appendix 1 - Drawing numbers

The following drawings and associated documentation has been submitted by the applicant in support of application reference 24/04/06/F:

Drawings:

13999-CRH-XX-XX-FG-G-7000-P1 – Site Boundary Plan 13999-CRH-XX-XX-FG-G-7008-P1 – Site Location Plan

20009 Rev 3 – Existing Plan (Topographical Survey) Sheet 1 20009 Rev 3 – Existing Plan (Topographical Survey) Sheet 2

13999-CRH-XX-XX-DR-C-5158-P3 – Planning Drawings Sitewide

13999-CRH-XX-XX-DR-C-5300 -P1 – Drainage Details Sheet 1 13999-CRH-XX-XX-DR-C-5301 -P1 – Drainage Details Sheet 2 13999-CRH-XX-XX-DR-C-5302 -P1 – Drainage Details Sheet 3

PJC.1244.001 REV B – Soft Landscape Tree Replacement Scheme Plan Pack PJC 1244.002 – Landscape Detail Tree Pit Detail

Documents: Supporting Statement Transport Statement Flood Risk Assessment and Drainage Strategy Outdoor Street Lighting Report Ecology Report Health Impact Assessment Arboricultural Impact Assessment 14 April 2024 Design Statement Cover Letter dated 09.02.2024 Planning Submission Update 04.02.2024 Technical Note dated 14th May 2025 Technical Note dated 18th September 2025 Bat Ground Level Tree Assessment September 2025 Soft Landscape Tree Planting Specification Rev B dated 30th October 2025 Detailed Landscape Management Plan – Tree Replanting Scheme Tree Loss Strategy 04 August 2025 Planning Submission Update – 31st October 2025 Tree Replacement Scheme – Canopy Calculation Assessment Pack PJC.1244.001 REV B – Soft Landscape Tree Replacement Scheme Plan Pack ITEM NO: 5 - Appendices PAGE NO: 1 Appendices Appendix 2 – Conditions and Informatives

1. Conditions and Reasons for Application Reference 24/0406/F:

Condition 1 Standard Time Limit The development to which this permission relates must be begun not later than the expiration of three (3) years beginning with the date on which the permission is granted.

Reason: As required by Section 91 of the Town and Country Planning Act 1990.

Condition 2 Approved Drawings The development hereby permitted shall be carried out in accordance with the following approved drawings and documents:

13999-CRH-XX-XX-FG-G-7000-P1 – Site Boundary Plan 13999-CRH-XX-XX-FG-G-7008-P1 – Site Location Plan

20009 Rev 3 – Existing Plan (Topographical Survey) Sheet 1 20009 Rev 3 – Existing Plan (Topographical Survey) Sheet 2

13999-CRH-XX-XX-DR-C-5158-P3 – Planning Drawings Sitewide

13999-CRH-XX-XX-DR-C-5300 -P1 – Drainage Details Sheet 1 13999-CRH-XX-XX-DR-C-5301 -P1 – Drainage Details Sheet 2 13999-CRH-XX-XX-DR-C-5302 -P1 – Drainage Details Sheet 3

PJC.1244.001 REV B – Soft Landscape Tree Replacement Scheme Plan Pack PJC 1244.002 – Landscape Detail Tree Pit Detail

Documents:

Supporting Statement Transport Statement Flood Risk Assessment and Drainage Strategy Outdoor Street Lighting Report Ecology Report Health Impact Assessment Arboricultural Impact Assessment 14 April 2024 Design Statement ITEM NO: 5 - Appendices PAGE NO: 2 Appendices Cover Letter dated 09.02.2024 Planning Submission Update 04.02.2024 Drainage Technical Note Bat Ground Level Tree Assessment September 2025 Soft Landscape Tree Planting Specification Rev B dated 30th October 2025 Detailed Landscape Management Plan – Tree Replanting Scheme Tree Loss Strategy 04 August 2025 Planning Submission Update – 31st October 2025 Tree Replacement Scheme – Canopy Calculation Assessment Pack

Reason: For the avoidance of doubt and in the interests of proper planning.

Condition 3 Drainage No drainage systems for the infiltration of surface water to the ground are permitted other than with the written consent of the local planning authority in consultation with the Environment Agency and the LLFA. Any proposals for such systems must be supported by an assessment of the risks to controlled waters. The development shall be carried out in accordance with the approved details.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Appendices to 5: Stadium Road & Baker Road, Woolwich: Ref 24.0406.FReport 194 KB DownloadRead as text
PDF
Stadium Road and Baker Road, Woolwich, SE18: Ref: 24/0406/FReport 676 KB Download

At this meeting

Whole meeting

Who was there

7 of 15 attended
GD
Councillor Gary DillonChair, present
SB
Councillor Sandra BauerVice-Chair, apologies
OB
Councillor Olu BabatolaCommittee Member, present
CB
Councillor Clare Burke-McDonaldCommittee Member, apologies
MR
Councillor Maisie Richards CottellCommittee Member, apologies
DG
Councillor David GardnerCommittee Member, present
CO
Councillor Calum O'Byrne MulliganCommittee Member, present
‘H
Councillor ‘Lade Hephzibah OlugbemiCommittee Member, apologies
DS
Councillor Dave SullivanCommittee Member, present
PG
Councillor Patricia GreenwellCommittee Member, present
TR
Councillor Tamasin RhymesCommittee Member, present
VG
Victoria GeogheganOfficer, in attendance

All 15 on the meeting page

More from Greenwich Planning Board

All decisions
MeetingDecisionOutcome
24 Sep 2026 Former Lewisham College, 1 Deptford Bridge, London, SE8 4HH - Ref: 25/0798/FResolved – That consideration of the application be DEFERRED pending Lewisham Council’s determination of the applicat... Deferred Open
24 Sep 2026 Land at 71-73 Nathan Way, Thamesmead, London, SE28 0BQ - Ref: 26/1040/FResolved - That full planning permission be GRANTED for: A . The Erection of industrial warehouse buildings for flexi... Agreed Open
21 Jul 2026 STC Ivor Grove Sports Club, Ivor Grove, Eltham, London, SE9 2AJResolved that full planning permission be REFUSED for the demolition of all existing sports club buildings and redeve... Refused Open
21 Jul 2026 Land to the east of East Parkside, south of Edmund Halley Way and west of Olympian Way ('Plot 20.02'), Greenwich Peninsula SE10Resolved that full planning permission be GRANTED for the temporary use of land for up to 10 years for the installati... Agreed Open
21 Jul 2026 Garage Sites Opposite to 48 - 53 Sewell Road SE2 9XW & 23 Ampleforth Road SE2 9BD - 17 Sewell Road SE2 9XNResolved that full planning permission be GRANTED for the redevelopment of 2 sites, comprising residential dwellings ... Agreed Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies