Land Bound By Vincent Road, Wilmount Street And Woolwich New Road, Woolwich, SE18 - Ref: 25/2824/MA

Agreed Planning 3 papers

AI summaryGreenwich Planning Board grants amended Woolwich mixed-use scheme: 557 homes, taller blocks, less commercial space, subject to Mayor of London referral.

AI summaryIn plain English

Written from the decision and the officer reportPDF Pro
OutcomeAgreedConditions 2, 3, 6, 25, 26, 28, 33, 41, 51, 52, 59 amended
MoneyNot stated
What happens nextReferral to Mayor of LondonPlus S111 and S106 agreements before decision issues
Who it affectsWoolwich Arsenal wardSite at Vincent Road, Wilmount Street, Woolwich New Road

What was decided

A Section 73 application was granted, varying the 22/12/2022 planning permission (ref 22/1017/F) for demolition and phased mixed-use redevelopment of the site.

The amendment increases building heights, increases the number of residential units, reduces commercial space, and makes other internal and external changes.

Why

The scheme provides a multipurpose leisure centre (Class F2, 11,891 sqm GIA), commercial and business floorspace (Class E, 255 sqm GIA), and 557 residential units (Class C3), together with a public square and public realm. Report P35

Consent is subject to completion of a Section 111 Legal Agreement and a Section 106 or confirmatory deed, plus a Directors' Agreement resecuring leisure centre commitments from the original permission.

What happens next

The application is to be referred to the Mayor of London under the Town and Country Planning (Mayor of London) Order 2008.

A Section 111 agreement must be completed with Hill Residential Limited; if not done within three months of the resolution, the Assistant Director may refuse consent on grounds the agreement has not been completed.

The Assistant Director (Planning and Building Control) is authorised to finalise conditions, the S111 terms, and minor wording changes before issuing the decision notice.

Options considered

  • Chosen: Grant the Section 73 application as recommended

Implications

  • Legal: Planning obligations to be secured through a Section 111 agreement with Hill Residential Limited and Section 106 or confirmatory deeds binding freehold, leasehold and financial charge holders. Report P41, P42, P43, P44
  • Legal: The development must be carried out in line with the Environmental Statement (March 2022) and its August 2025 Addendum; any variation must not give rise to new significant effects. Report P39, P40
  • Climate: Construction and demolition machinery (NRMM) between 37kW and 560kW must be registered and proof provided; piling, surface water drainage and flood mitigation are controlled by conditions. Report P51, P69, P70, P74, P75
  • Risk: If the Section 111 agreement is not completed within three months, the application could be refused.
  • Other: Conditions require ongoing engagement with the Ramgarhia Sikh Association, Woolwich during demolition and construction. Report P51

Who and where

  • Residents and neighbours in Woolwich Arsenal ward
  • Hill Residential Limited (applicant)
  • The Ramgarhia Sikh Association, Woolwich Report P51
  • Future residents of 557 new homes and users of the leisure centre Report P35

Timeline

  • 22/12/2022: Original planning permission 22/1017/F granted Report P17
  • Within three years of 22/12/2022: Development must begin (Condition 1, Section 91 TCPA 1990) Report P17, P18
  • Within three months of the Planning Board resolution: Section 111 Legal Agreement must be completed, or consent may be refused
  • Before issue of decision notice: Referral to the Mayor of London required

Plain English for the jargon

  • Section 73 application: Application to vary or remove conditions on an existing planning permission under the Town and Country Planning Act 1990.
  • Section 106 agreement: A legal agreement under section 106 of the Town and Country Planning Act 1990 used to secure planning obligations tied to a permission.
  • Section 111 agreement: Agreement under section 111 of the Local Government Act 1972 used here to bind Hill Residential Limited and subsequent interest holders to planning obligations.
  • Class F2 / E / C3: Use classes: F2 for a multipurpose leisure centre, E for commercial and business uses, C3 for residential dwellings.
  • NRMM: Non-Road Mobile Machinery, construction plant that must be registered with the Greater London authority.
  • GIA: Gross Internal Area, the measure of floorspace used for the leisure centre and commercial space.
What was decided, why, and what happens next

Pro reads every officer report for you and explains each decision in plain English: the money, the options, the risks, the timeline, each with the paragraph it came from.

Written by AI from the council's published papers. AI can get things wrong: the council's own wording below is the record.Report a problem
Item6

Resolved

Resolved that planning application submitted under Section 73 of the Town & Country Planning Act 1990 in connection with the planning permission dated 22/12/2022 (Reference: 22/1017/F) be GRANTED for the demolition of the existing buildings and structure and the phased redevelopment of the site for a mixed-use scheme comprising a multipurpose leisure centre (Class F2), commercial and business uses (Class E), residential dwellings (Class C3), new public square and new public realm with hard and soft landscape works, highways works, parking, access and servicing arrangements, and associated works. Nad that was notedt that the amendment proposes a modification to Condition 2, 3, 6, 25, 26, 28, 33, 41, 51, 52, and 59 to increase building heights, increase quantum of residential units, reduce commercial space, and make other associated internal and external changes. Consent subject to (i) Referral of the application to the Mayor of London as required under the terms of The Town and Country Planning (Mayor of London) Order 2008; (ii) The prior completion of a Section 111 (S111) Legal Agreement of the Local Government Act 1972 between the Council local planning authority (LPA) and Hill Residential Limited requiring that company and any other relevant interest holders upon obtaining relevant interests to enter an agreement or a confirmatory deed under S106 of the Town and Country Planning Act 1990 containing the planning obligations summarised in the heads of terms set out in this report relevant to the parts of the development other than the leisure centre (Section 26); and; (iii) The prior completion of a Directors’ Agreement (as set out in section 26) resecuring the contributions and other commitments agreed under planning permission ref:22/1017/F dated 22/12/2022 for the Leisure Centre (Phase1). (iv) Conditions set out in Appendix 2 and the addendum; and (vi) A statement being placed on the Statutory Register confirming the main reasons and consideration on which the decision was based were those set out in the report of the Director of Place and Growth as required by Regulation 30 of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017. That the Assistant Director (Planning & Building Control) be authroised to: (i) Make any minor changes to the detailed wording of the recommended conditions as set out in Appendix 2 of the report and its addendum and the minutes of this Planning Board meeting, where the Assistant Director (Planning & Building Control) considers it appropriate, before issuing the final decision notice (ii) Finalise the detailed terms of the S111 agreement (including appended documents) and form of the planning obligations as set out in Section 26 of the report, its addendum and the minutes of this Planning Board meeting (iii) Consider, in the event that the S111 Agreement is not completed within three (3) months of the date of this Planning Board resolution, whether consent should be refused on the grounds that the agreement has not been completed within the appropriate timescale, and that the proposals are unacceptable in the absence of the recommended planning obligations; and if the Assistant ...
Word for word from the decision Greenwich published for this meeting. Source: committees.royalgreenwich.gov.uk

Follow this further

Built from Greenwich's papers

What the report saysPro

Report to Planning Board

Appendices Appendix 1: Drawing Numbers Application 25/2824/MA

Existing Drawings CGL-ZZ-00-DR-A-000003 Rev P1 (Site Location Plan); CGL-ZZ-00-DR-A-000001 Rev P1 (Existing Site - Topographical Survey); CGL-ZZ-00-DR-A-000004 Rev P1 (Existing Site – Demolition Plan); CGL-ZZ-ZZ-DR-A-060050 Rev P1 (Existing Elevations Viscount House); CGL-ZZ-ZZ-DR-A-060051 Rev P1 (Existing Elevations Troy Court); CGL-ZZ-ZZ-DR-A-060052 Rev P1 (Existing Elevations Bull Tavern and Shops); CGL-ZZ-ZZ-DR-A-060053 Rev P1 (Existing Elevations Garages); CGL-ZZ-ZZ-DR-A-060054 Rev P1 (Existing Elevations Public WC); CGL-ZZ-ZZ-DR-A-060060 Rev P1 (Existing Sections North South); CGL-ZZ-ZZ-DR-A-060061 Rev P1 (Existing Sections East West);

Leisure Centre (Phase 1) Drawings WLC-FBA-00-00-DR-A-01000 Rev P2 (Leisure Centre Proposed Ground Floor Plan); WLC-FBA-00-01-DR-A-01100 Rev P2 (Leisure Centre Proposed First Floor Plan); WLC-FBA-00-02-DR-A-01200 Rev P2 (Leisure Centre Proposed Second Floor Plan); WLC-FBA-00-03-DR-A-01300 Rev P2 (Leisure Centre Proposed Third Floor Plan); WLC-FBA-00-04-DR-A-01400 Rev P2 (Leisure Centre Proposed Roof Plan); WLC-FBA-00-B1-DR-A-01B00 Rev P2 (Leisure Centre Proposed Basement Floor Plan); WLC-FBA-00-XX-DR-A-01001 Rev P2 (Leisure Centre Proposed Section AA and BB); WLC-FBA-00-XX-DR-A-01002 Rev P2 (Leisure Centre Proposed Section CC); WLC-FBA-00-XX-DR-A-01003 Rev P2 (Leisure Centre Proposed Section DD and EE); WLC-FBA-00-XX-DR-A-01031 Rev P2 (Leisure Centre Proposed West Elevation Grid 1G); WLC-FBA-00-XX-DR-A-01032 Rev P1 (Leisure Centre Proposed West Elevation Grid 1D); WLC-FBA-00-XX-DR-A-01033 Rev P2 (Leisure Centre Proposed North Elevation Grid A4); WLC-FBA-00-XX-DR-A-01034 Rev P2 (Leisure Centre Proposed North Elevation Grid A7); WLC-FBA-00-XX-DR-A-01035 Rev P2 (Leisure Centre Proposed East Elevation Grid 13H); WLC-FBA-00-XX-DR-A-01036 Rev P2 (Leisure Centre Proposed South Elevation Grid 9L);

ITEM NO: 6 - Appendices PAGE NO: 1 Appendices WLC-FBA-00-XX-DR-A-01037 Rev P2 (Leisure Centre Proposed South Elevation Grid 8L); WLC-FBA-00-XX-DR-A-01051 Rev P2 (Leisure Centre Proposed South and West Elevations); WLC-FBA-00-XX-DR-A-01052 Rev P2 (Leisure Centre Proposed North and East Elevations); WLC-FBA-00-XX-DR-A-01053 Rev P2 (Leisure Centre Proposed Portico Elevations); WLC-FBA-00-XX-DR-A-01054 Rev P3 (Leisure Centre Rendered South and West Elevations); WLC-FBA-00-XX-DR-A-01055 Rev P3 (Leisure Centre Rendered North and East Elevations); WLC-FBA-00-XX-DR-A-01061 Rev P2 (Leisure Centre North Elevation Axonometrics); WLC-FBA-00-XX-DR-A-01062 Rev P2 (Leisure Centre East Elevation Axonometrics); WLC-FBA-00-XX-DR-A-01063 Rev P2 (Leisure Centre South Elevation Axonometrics); WLC-FBA-00-XX-DR-A-01064 Rev P2 (Leisure Centre West Elevation Axonometrics); WLC-FBA-00-XX-DR-A-01065 Rev P2 (Leisure Centre West Elevation Entrance Axonometrics); WLC-FBA-00-XX-DR-A-01066 Rev P2 (Leisure Centre North West Corner Axonometrics);

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Appendices to Land Bound By Vincent Road: Ref 25.2824.MAReport 234 KB DownloadRead as text
PDF
Item 6: Addendum to Land Bound By Vincent Road: Ref 25.2824.MAAddendum 140 KB Download
PDF
Land Bound By Vincent Road, Wilmount Street And Woolwich New Road, Woolwich, SE18: Ref: 25/2824/MAReport 9.6 MB Download

At this meeting

Whole meeting
3Declarations of InterestNoted 4MinutesOn the agenda 5Stadium Road and Baker Road, Woolwich, SE18 - Ref: 24/0406/FNoted
6Land Bound By Vincent Road, Wilmount Street And Woolwich New Road, Woolwich, SE18 - Ref: 25/2824/MAThis decision

Who was there

7 of 15 attended
GD
Councillor Gary DillonChair, present
SB
Councillor Sandra BauerVice-Chair, apologies
OB
Councillor Olu BabatolaCommittee Member, present
CB
Councillor Clare Burke-McDonaldCommittee Member, apologies
MR
Councillor Maisie Richards CottellCommittee Member, apologies
DG
Councillor David GardnerCommittee Member, present
CO
Councillor Calum O'Byrne MulliganCommittee Member, present
‘H
Councillor ‘Lade Hephzibah OlugbemiCommittee Member, apologies
DS
Councillor Dave SullivanCommittee Member, present
PG
Councillor Patricia GreenwellCommittee Member, present
TR
Councillor Tamasin RhymesCommittee Member, present
VG
Victoria GeogheganOfficer, in attendance

All 15 on the meeting page

On this subject at Greenwich

Search all
  1. Land Bound By Vincent Road, Wilmount Street And Woolwich New Road, Woolwich, SE18 - Ref: 25/2824/MAThis decision
  2. Land bound by Beresford Street and Macbean Street SE18 6LW Ref 24/3273/FAgreed
  3. Land bounded by Pettman Crescent, Nathan Way and Hadden Road, SE28Approved
  4. Millennium Retail Park Car Park & 59 Bugsby's Way and land bound by Bugsby's Way, Peartree Way and Commercial Way, SE7 - Ref: 24/1965/FAgreed
  5. Land Bounded by Nathan Way, Pettman Crescent and Hadden Road, and intersected by Western Way Ref: 24/1575/NMAgreed
  6. Land Bounded by Pettman Crescent, Nathan Way and Hadden Road, London, SE28 Ref: 24/1565/RApproved

More from Greenwich Planning Board

All decisions
MeetingDecisionOutcome
24 Sep 2026 Former Lewisham College, 1 Deptford Bridge, London, SE8 4HH - Ref: 25/0798/FResolved – That consideration of the application be DEFERRED pending Lewisham Council’s determination of the applicat... Deferred Open
24 Sep 2026 Land at 71-73 Nathan Way, Thamesmead, London, SE28 0BQ - Ref: 26/1040/FResolved - That full planning permission be GRANTED for: A . The Erection of industrial warehouse buildings for flexi... Agreed Open
21 Jul 2026 STC Ivor Grove Sports Club, Ivor Grove, Eltham, London, SE9 2AJResolved that full planning permission be REFUSED for the demolition of all existing sports club buildings and redeve... Refused Open
21 Jul 2026 Land to the east of East Parkside, south of Edmund Halley Way and west of Olympian Way ('Plot 20.02'), Greenwich Peninsula SE10Resolved that full planning permission be GRANTED for the temporary use of land for up to 10 years for the installati... Agreed Open
21 Jul 2026 Garage Sites Opposite to 48 - 53 Sewell Road SE2 9XW & 23 Ampleforth Road SE2 9BD - 17 Sewell Road SE2 9XNResolved that full planning permission be GRANTED for the redevelopment of 2 sites, comprising residential dwellings ... Agreed Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies