What was decided
The Committee resolved to authorise the Director of Planning and Property to grant planning permission, subject to the conditions listed in the report and any changes in the Addendum. Report P10
The Director of Planning and Property, after consultation with the Assistant Director of Legal Services and the Chair of the Committee, is authorised to make minor changes to conditions or the legal agreement. Report P11
The development is for five residential terraced houses (Class C3) on four floors including lower ground level, with cycle parking, utility stores and amenity space, replacing a vacant two-storey 1980s office building. Report P7, 3.1, 3.2, 1.1
Why
Officers found the loss of the office use acceptable, noting the previous 2022 approval established the principle, and the proposal would contribute five homes to housing need in a predominantly residential area. Report P110, 5.6, 5.7
The design was considered acceptable in visual terms and would preserve the character and appearance of the Lakeside/Sinclair/Blythe Road Conservation Area, with no harm to adjacent heritage assets. Report P112
Subject to conditions, the scheme was found acceptable on neighbour amenity, transport and highways, environmental matters (flood risk, air quality, contamination, sustainability), and planning obligations including car permit free restrictions and S278 highways works. Report P113, P114, P115, P116
What happens next
Conditions require submission and approval of numerous pre-commencement, pre-occupation and compliance details covering materials, piling, landscaping, contaminated land, air quality, drainage, ventilation, energy, refuse, cycle storage and Secured by Design. Report P13, P25, P28, P87, P70, P75, P83, P85
A planning obligation will secure car permit free restrictions, S278 highways works and monitoring, public realm and community safety contributions, monitoring of the Demolition and Construction Logistics Plans, and Air Quality Dust Management Plan plus monitoring fees. Report P116
Development must commence within three years of the decision, and works must be carried out in accordance with the approved drawings and supporting documents listed in the report. Report P13, P15, P17, P19, P21, P23
Options considered
Chosen: Approve the application subject to conditions and legal agreement. Officers considered the scheme acceptable on land use, design, amenity, transport, environment and planning balance, with 24 objections and 1 letter of support received. Report P9, P10, 4.2, P146, P148
Implications
Environment and climate: Conditions require air quality dust management plans for demolition and construction phases, non-road mobile machinery to meet Stage V emissions, a ventilation strategy with NO2 and PM filtration, plus air source heat pumps, solar PV, battery storage and waste water heat recovery systems, given the site lies in the borough Air Quality Management Area. Report P70, P72, P75, P103, P85, P83, 1.5
Legal: Planning obligations are secured through a legal agreement covering car permit free restrictions, S278 highways works and monitoring, public realm and community safety contributions, and monitoring of construction logistics and air quality plans. Report P116
Risk: Conditions require a Piling Method Statement in consultation with Thames Water, land contamination assessment and remediation (conditions 31 to 36), and a revised Flood Risk and SuDS Strategy with peak discharge limited to 2 l/s. Report P28, P87, P63, P64
Other: Conditions restrict use to Class C3 residential only, preventing use as a House in Multiple Occupation under Class C4, and limit roof terraces to those shown on approved drawings with 1.7m obscure privacy screens. Report P43, P48, P50, P60
Who and where
Neighbouring residents of Nos. 8 to 18 Sterndale Road and surrounding properties on Blythe Road Report 1.2, P101, 4.2, P146
Future occupiers of the five residential terraced houses Report P7, P111
Thames Water (statutory consultee on water and sewerage infrastructure) Report P123, P28
10.03.2026: Committee date and decision to approve with conditions Report P5
Within 3 years of decision: Development must commence Report P13
Plain English for the jargon
Class C3: Use Class for dwellinghouses occupied by a single household, as set out in the Town and Country Planning (Use Classes) Order 1987.
PTAL: Public Transport Accessibility Level, a Transport for London scoring system (1 to 6) measuring access to public transport, where higher scores indicate better access.
S106: A legal agreement under Section 106 of the Town and Country Planning Act 1990 used to secure planning obligations from developers.
S278: A highways agreement under Section 278 of the Highways Act 1980 allowing developers to carry out works on the public highway.
SuDS: Sustainable Drainage Systems, features such as permeable paving and green roofs that manage surface water run-off.
What was decided, why, and what happens next
Pro reads every officer report for you and explains each decision in plain English: the money, the options, the risks, the timeline, each with the paragraph it came from.
Written by AI from the council's published papers. AI can get things wrong: the council's own wording below is the record.Report a problem
Item10
Resolved
RESOLVED That the Director of Planning and Property be authorised to grant permission subject to the conditions listed in the report and changes made in the Addendum. That the Director of Planning and Property, after consultation with the Assistant Director of Legal Services and the Chair of the Planning and Development Control Committee be authorised to make any minor changes to the proposed Heads of Terms of the legal agreement or conditions, which may include the variation, addition or deletion of conditions, any such changes shall be within their discretion.
Word for word from the decision Hammersmith & Fulham published for this meeting.Source: democracy.lbhf.gov.uk
Reg. No: Case Officer: 2025/02206/FUL Melissa Vingoe-Wright
Date Valid: Conservation Area: 14.08.2025 Constraint Name: Lakeside/Sinclair/Blythe Road Conservation Area - Number 36 Committee Date: 10.03.2026 Applicant:
C/O Agent
Description: Redevelopment of the site, comprising the demolition of the existing vacant office building and the provision of 5no. residential terraced houses (Class C3) across four floors including lower ground level, together with associated cycle parking, internal utility stores, and amenity space. Drg Nos:
Application Type: Full Detailed Planning Application
Officer Recommendation:
1) That the Committee resolve that the Director of Planning and Property be authorised to grant permission subject to the conditions listed below:
2) That the Committee resolve that the Director of Planning and Property, after consultation with the Assistant Director of Legal Services and the Chair of the Planning and Development Control Committee be authorised to make any minor changes to the proposed Heads of Terms of the legal agreement or conditions, which may include the variation, addition or deletion of conditions, any such changes shall be within their discretion.
Conditions:
1) The development hereby permitted shall not commence later than 3 years from the date of this decision.
Condition required to be imposed by section 91(1) (a) of the Town and Country Planning Act 1990 (as amended by section 51 of the Planning and Compulsory Purchase Act 2004).
2) The development shall be carried out and completed in accordance with the following approved drawings:
Floor Plans:
979-10-099- (Proposed Basement Plan) 979-10-100-PL01 (Proposed Ground Floor) 979-10-101- (Proposed First Floor) 979-10-102- (Proposed Second Floor) 979-10-103- (Proposed Roof Plan)
General Arrangement Plan rev 01 Urban Greening Factor Plan rev 01 Proposed Elevations:
979-10-300-PL01 (Proposed North Elevation) 979-10-301- (Proposed South Elevation) 979-10-302- (Proposed East and West Elevation)
Transport Statement ref 2502070-ACE-XX-XX-RP-C-0101A dated August 2025 Noise Assessment ref 2502070-ACE-XX-XX-RP-C-0601A dated August 2025 Landscape Design Report rev 01 dated 06/08/2025 Energy and Sustainability Statement dated August 2025 Arboricultural Implications report ref SJA air 25159-01 dated August 2025 Preliminary Ecological Assessment Report dated July 2025 Ventilation Report dated 11/08/2025 FRA, Drainage and SuDS Strategy dated 12/08/2025 Basement impact Assessment dated 12/08/205
In order to ensure full compliance with the planning application hereby approved and to prevent harm arising through deviations from the approved plans, in accordance with Policies DC1, DC2, and DC8 of the Local Plan (2018).
3) Prior to commencement of the development hereby permitted, details (including manufacturer's specifications, photographs and/or brochures) of the external surfaces (including fenestration) and, where applicable, all areas of hard surfacing shall be submitted to, and approved in writing by the Council.
The development shall be carried out and completed in accordance with the approved details. The development shall be permanently retained in accordance with the approved details. Any works of making good to existing elevations shall be carried out in materials to match the elevation to which the works relate.
To ensure a satisfactory appearance in line with Policies DC1, DC4 and DC8 of the Local Plan (2018).
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Follow Planning and Development Control Committee at Hammersmith & Fulham and we tell you when its next papers are published, before the meeting rather than after it.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.