350 - 358 Uxbridge Road, London W12 7LL, White City, 2025/03221/FUL
AgreedPlanning1 paper
AI summaryHammersmith & Fulham Planning Committee resolves to grant permission for rooftop extension at 350-358 Uxbridge Road, adding 5 flats and 339 sqm of commercial space, subject to legal agreement and 37 conditions.
Written from the decision and the officer reportPDF Pro
OutcomeAgreedSubject to legal agreement and conditions
MoneyNot stated
What happens nextLegal agreement to be completedDirector of Planning authorised to grant
Who it affects350-358 Uxbridge Road, W12White City ward
What was decided
The Committee authorised the Director of Planning and Property to grant planning permission on completion of a satisfactory legal agreement and subject to the 37 conditions in the report. Report P9, P10
The Director of Planning and Property, after consultation with the Assistant Director of Legal Services and the Chair of the Committee, is authorised to make minor changes to the legal agreement heads of terms or conditions, including variation, addition or deletion. Report P11
Why
The proposal achieves a sustainable form of development, making effective use of a previously under-utilised brownfield site, providing a net gain of 5 self-contained flats while retaining and extending ground floor commercial uses. Report P94
The 5 new flats and enhancement of the 5 existing flats (upgraded from studios to 1b2p units) would provide acceptable living conditions, meeting or exceeding the London Plan minimum space standards. Report P95, 7.14, P157, P161
The development is considered high-quality design, compatible with the surrounding area in height, mass, form and materials, and would not cause unacceptable harm to neighbouring amenity, the highway, flood risk, land contamination, energy, sustainability or air quality, subject to conditions. Report P95, P96, P97, P98
Planning obligations are secured to make the development acceptable, including car permit free restrictions, Construction and Demolition Management Plans and a monitoring fee. Report P99
What happens next
A satisfactory legal agreement must be completed before the Director of Planning and Property grants permission. Report P10
Development must commence within 3 years of the date of permission (Condition 1). Report P13
Various pre-commencement and pre-occupation conditions require further details to be submitted and approved, including materials, air quality, ventilation, energy, contamination, sound insulation, refuse storage, construction management and flood mitigation measures. Report P12, P18, P20, P25, P27, P30, P32, P34, P37, P42, P43, P45, P47, P50, P52, P54, P55, P57, P60, P62, P66, P68, P70, P71, P73, P75, P81
Options considered
Chosen: Grant planning permission subject to legal agreement and conditions (officer recommendation). Proposal accords with development plan policies on housing supply, design, amenity, transport, contamination, flood risk, energy and air quality, subject to conditions and obligations. Report P9, P10, P93, P94, P95, P96, P97, P98, P99
Implications
Legal: A Section 215 Notice was previously served on 11/09/2025 relating to the front elevation of 350-356 Uxbridge Road due to disrepair; existing shutters must be removed within 6 months of permission and no other external security shutters are permitted. Report 2.1, P83, P84
Equalities: The new residential flats would be required to meet London Plan space standards (D6), with accessible design implied through building regulations. Report 7.14, P157
Climate: Air Source Heat Pump, Heat Battery Boiler, Electric Boilers or alternative electrical-only heating systems, plus Waste Water Heat Energy Recovery Systems, are required in the 15 dwellings to reduce carbon-based gas connections and improve air quality. Report P43, P44, P45, P46
Risk: Conditions 24-29 require land contamination assessment, site investigation, remediation and verification, as past or present contaminative uses are understood at or near the site. Report P66, P67, P68, P69, P70, P71, P72, P73, P74, P75, P76
Risk: The site lies in Flood Zone 1 (lowest risk), but flood prevention and mitigation measures including green/brown roofs, permeable paving and controlled stormwater discharge are required by condition. Report 1.2, P30, P31
Other: Conditions restrict construction hours to 0800-1800 Monday to Friday and 0800-1300 on Saturdays, with no work on Sundays or Bank Holidays, and require air quality control during demolition and construction including ULEZ compliant vehicles and NRMM at minimum Stage V. Report P32, P34, P35, P63, P64
Other: Existing front shutters to the ground floor commercial units must be removed within 6 months; shopfront window glass must not be mirrored, painted or obscured; no external air conditioning units, ventilation fans or flues on new shopfronts; no sub-division of commercial units without consent; and advertisements on shopfronts require separate consent. Report P83, P85, P87, P89, P91
Who and where
Future occupants of 5 new self-contained flats (4 studios and 1 one-bedroom) at third floor level Report 3.1, P7, P157
Existing residents of 5 first floor units, whose studios would be enhanced to 1b2p units with private rear terraces Report 3.1, P161, P177
Ground floor commercial tenants, whose premises would be extended at the rear to provide 339 sqm additional commercial floorspace Report 3.1, P7, 7.6
Neighbouring residents of properties on Oaklands Grove, Stanlake Road, Uxbridge Road, Thorpebank Rd, Frithville Gardens, Devonport Road and St Stephens Avenue, who were notified and 9 of whom wrote in support Report P109, 4.1, 4.2
The Council as local planning authority, securing planning obligations including car permit free restrictions, Construction and Demolition Management Plans and a monitoring fee Report P99
Timeline
11/09/2025: Section 215 Notice served on 350-356 Uxbridge Road for untidy front elevation Report 2.1
18th November 2025: Application form received Report P103
December 2025 (24.12.25 to 29.12.25): 9 neighbour letters of support received in response to consultation Report P109, 4.2
10.03.2026: Planning and Development Control Committee resolved to grant permission subject to legal agreement and conditions Report P6
Within 3 years of permission: Development must commence Report P13
Within 6 months of permission: Existing front shutters to ground floor commercial units must be removed Report P83
Plain English for the jargon
Section 215 Notice: A notice served by a local planning authority requiring the owner of land or buildings to clean up the property if its condition harms the amenity of the area.
Use Class C3: Dwellinghouses used as single family homes or by up to six residents sharing.
Use Class C4: Houses in multiple occupation (HMOs) for between three and six unrelated tenants.
Use Class E: Commercial, business and service uses including shops, offices, cafes and clinics.
Flood Zone 1: Land assessed as having the lowest probability of flooding.
BREEAM: Building Research Establishment Environmental Assessment Method, a sustainability rating for buildings.
NRMM: Non-Road Mobile Machinery, construction equipment that must meet emission standards.
ULEZ: Ultra Low Emission Zone, an area in London where vehicles must meet strict emission standards or pay a charge.
ASHP: Air Source Heat Pump, a renewable energy system for heating and cooling.
WWHERS: Waste Water Heat Energy Recovery System, a system that recovers heat from drain water.
What was decided, why, and what happens next
Pro reads every officer report for you and explains each decision in plain English: the money, the options, the risks, the timeline, each with the paragraph it came from.
Written by AI from the council's published papers. AI can get things wrong: the council's own wording below is the record.Report a problem
Item6
Resolved
RESOLVED That the Director of Planning and Property be authorised to grant planning permission upon the completion of a satisfactory legal agreement and subject to the conditions listed in the report. That the Director of Planning and Property, after consultation with the Assistant Director of Legal Services and the Chair of the Planning and Development Control Committee be authorised to make any minor changes to the proposed Heads of Terms of the legal agreement or proposed conditions, which may include the variation, addition or deletion of conditions, any such changes shall be within their discretion.
Word for word from the decision Hammersmith & Fulham published for this meeting.Source: democracy.lbhf.gov.uk
Description: Erection of additional floors at roof level of 350-358 Uxbridge Road in connection with the creation of 4 x studio and 1 x 1 bedroom self-contained flats; erection of rear extensions at ground and first floor levels to create 339 sqm of commercial floorspace at ground floor level; formation of roof terraces at first floor level to the rear elevation. Drg Nos: See Condition 2.
Application Type: Full Detailed Planning Application
Officer Recommendation:
(1) That the Committee resolve that the Director of Planning and Property be authorised to grant planning permission upon the completion of a satisfactory legal agreement and subject to the conditions listed below.
(2) That the Committee resolve that the Director of Planning and Property, after consultation with the Assistant Director of Legal Services and the Chair of the Planning and Development Control Committee be authorised to make any minor changes to the proposed Heads of Terms of the legal agreement or proposed conditions, which may include the variation, addition or deletion of conditions, any such changes shall be within their discretion.
Conditions:
1) The development hereby permitted shall not commence later than the expiration of 3 years beginning with the date of this planning permission.
Reason: Condition required to be imposed by section 91(1)(a) of the Town and Country Planning Act 1990 (as amended by section 51 of the Planning and Compulsory Purchase Act 2004).
2) The development shall be carried out and completed in accordance with the following drawings hereby approved:
P104 G, P301 O, P302 M, P303 H, P401 H, P402 G: Flood Risk Assessment Ref. 79313.00.01R1 dated 2025-08-12 prepared by GeoSmart Information Ltd. Outline Construction Logistics Plan ref. 12564A dated August 2025 prepared by GTA Civils and Transport Ltd. Transport Statement dated October 2025 prepared by TTP Consultings Ltd. Energy Strategy Report Ref: 22-10241 dated October 2025 prepared by Syntegra Ltd. BREEAM New Construction Pre-Assessment Report Ref: 22-10241 dated October 2025 prepared by Syntegra Ltd. Air Quality Assessment ref. J0998/1/F1 dated 04 September 2025 prepared by Air Quality Assessments Ltd. Daylight and Sunlight Assessment Rev I, dated October 2025 prepared by EAL Consult. Noise Impact Assessment Ref: 22-10241 dated October 2025 prepared by Syntegra Ltd. Fire Safety Strategy rev 1 dated 29/08/2025 prepared by Fire Risk Assessments Limited. Thermal Comfort Overheating Assessment Ref: 22-10241 dated October 2025 prepared by Syntegra Ltd.
Reason: To ensure full compliance with the planning permission hereby approved and to prevent harm arising through deviations from the approved plans, in accordance with Policy DC1 and DC2 of the Local Plan (2018).
3) Prior to the commencement of the relevant part of the development (excluding demolition works), details of particulars and samples (where appropriate) of all the materials to be used in all external faces of the buildings; including details of the colour, composition and texture of the brick, concrete and metal work; details of all surface windows including window opening and glazing styles; balustrades or screening to balconies and roof terraces shall be submitted to and approved in writing by Local Planning Authority. The development shall be carried out in accordance with the details as approved and thereafter permanently retained in this form.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Follow Planning and Development Control Committee at Hammersmith & Fulham and we tell you when its next papers are published, before the meeting rather than after it.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.