La Reserve Hotel, 422 - 428 Fulham Road, London SW6 1DU, Walham Green, 2025/03297/VAR
DecidedPlanning1 paper
AI summaryHammersmith and Fulham committee resolves to grant a Section 73 variation at La Reserve Hotel, 422 to 428 Fulham Road, allowing a double-storey basement extension and minor design changes to the approved 50-bed aparthotel.
Written from the decision and the officer reportPDF Pro
OutcomeDecidedSubject to listed conditions and addendum changes
MoneyNot stated
What happens nextDirector to grant permissionAfter s106 Deed of Variation is completed
Who it affects422 to 428 Fulham Road aparthotel siteIn Walham Green ward, Moore Park Conservation Area
What was decided
The committee resolved to authorise the Director of Planning and Property to grant planning permission, subject to the conditions in the report and the addendum. Report P9
The committee also authorised the Director, after consulting Legal Services and the committee chair, to make minor changes to the proposed conditions. Report P10
Why
Officers found the apart-hotel use was already established under the 2024 parent permission and the variation only changes the approved drawings and flood risk condition, with a small uplift in floorspace. Report P6, P145
The amended design preserves the character of the Moore Park Conservation Area, with no significant harm to neighbour amenity, highways, flood risk, or air quality, and improves on the parent scheme's carbon reduction. Report P146, P147, P149, P150, P151
What happens next
A Deed of Variation to the existing section 106 legal agreement is required to cover the carbon offset payment and economic development contributions before the permission is granted. Report P151, P154
The applicant must discharge numerous pre-commencement and pre-occupation conditions, covering construction management, materials, landscaping, contamination, fire safety, energy, and ventilation. Report P19, P28, P49, P116, P113, P80, P88
Options considered
Chosen: Grant planning permission subject to conditions and s106 Deed of Variation (officer recommendation). Variation is acceptable on land use, design, amenity, highways, flood risk, sustainability, air quality and contamination grounds, and carbon improvements are secured by legal agreement. Report P8, P9, P145, P146, P147, P148, P149, P150, P151, P152, P153, P154
Implications
Legal: A section 106 Deed of Variation is required to secure the carbon offset payment and economic development contributions tied to the new floorspace. Report P151, P154
Legal: The site is in the Moore Park Conservation Area, so the council must continue to have regard to its duties under sections 66 and 72 of the Planning (Listed Buildings and Conservation Areas) Act 1990. Report P146
Climate: Conditions require zero-emission air source heat pumps, BREEAM Excellent, an updated Energy and Sustainability Statement, and a Ventilation Strategy to address local air quality. Report P80, P88, P136, P139, P140
Equalities: At least 10 percent of bedrooms must be fully accessible for wheelchair users and a further 10 percent capable of adaptation, in line with BS8300-2:2018. Report P98, P99, P100
Risk: Conditions manage construction noise, dust, vibration, land contamination, fire safety, anti-vibration mounts, and a revised flood risk assessment and surface water management strategy. Report P22, P61, P62, P70, P73, P113, P116
Other: The hotel use is locked to Class C1, capped at 50 bedrooms, with a 30-day maximum continuous stay, and no use of the roof or lightwells as a terrace. Report P101, P106, P108, P111
Who and where
The applicant, Reserve Property Holdings Ltd, as operator of La Reserve Hotel Report P5
Neighbouring residents in Hilary Close and on Moore Park Road, Britannia Road, and Fulham Road who submitted comments Report P169, 1.2
The occupiers of adjoining Buildings of Merit at 430 and 432 Fulham Road, which include a day nursery Report 1.2
Future guests and visitors of the 50-bed aparthotel, with restrictions on stay length Report P108, P111
Timeline
1st May 2024: Parent planning permission 2022/03682/FUL granted for the 50-bed aparthotel Report P6
25 November 2025: Application form and amended drawing pack received, with new Flood Risk Assessment Report P14, P163
21 January 2026 to 05 February 2026: Statutory consultee comments received from Historic England, HSE and the Environment Agency Report P167
31 January 2026 to 11 February 2026: Neighbour and adjoining occupier comments received, including from Italian Village Foundry Ltd Report P169
19 February 2026: Flood Risk Assessment addendum received Report P14
27 February 2026: Updated Energy and Sustainability Statement received Report P14, P139
10 March 2026: Planning and Development Control Committee resolved to authorise the grant, subject to conditions Report P4
Plain English for the jargon
Section 73 application: A planning application to vary or remove conditions attached to an existing planning permission, here a Minor-Material Amendment.
Apart-hotel (Class C1): A hotel use class covering serviced apartments provided for short stays, here capped at 50 bedrooms and 30-day maximum stays.
Moore Park Conservation Area: A designated heritage area covering the site and surroundings, requiring special regard to character and appearance.
BREEAM Excellent: A sustainability rating for buildings; the development must achieve an Excellent post-construction assessment.
AQDMP: Air Quality Dust Management Plan, required to control dust and emissions during the construction phase.
NRMM: Non-Road Mobile Machinery used on construction sites, which must meet Stage V emission standards.
ASHP: Air Source Heat Pump, used here as the zero-emission heating system for the aparthotel.
AFD: Aerobic Food Digester, equipment to process food waste on site and cut vehicle trips.
What was decided, why, and what happens next
Pro reads every officer report for you and explains each decision in plain English: the money, the options, the risks, the timeline, each with the paragraph it came from.
Written by AI from the council's published papers. AI can get things wrong: the council's own wording below is the record.Report a problem
Item9
Resolved
RESOLVED That, the Director of Planning and Property be authorised to grant planning permission subject to the conditions listed in the report and changes made in the Addendum. That the Director of Planning and Property, after consultation with the Assistant Director of Legal Services and the Chair of the Planning and Development Control Committee be authorised to make any minor changes to the proposed conditions, which may include the variation, addition or deletion of conditions, any such changes shall be within their discretion.
Word for word from the decision Hammersmith & Fulham published for this meeting.Source: democracy.lbhf.gov.uk
Description: Variation of condition 2 (approved drawings) and condition 20 (flood risk assessment) of planning permission ref: 2022/03682/FUL granted 1st May 2024 for the 'The retrospective demolition of existing buildings and the erection of a four-storey plus basement building for use as 50no. apart-hotel complex (Use Class C1)'. Amendments to the approved drawings to increase the size of the approved basement by creating a double storey basement extension and minor alterations to amend the elevational/fenestration treatment and footprint of the building (part retrospective).
(1) That the Committee resolve that the Director of Planning and Property be authorised to grant planning permission subject to the conditions listed below.
(2) That the Committee resolve that the Director of Planning and Property, after consultation with the Assistant Director of Legal Services and the Chair of the Planning and Development Control Committee be authorised to make any minor changes to the proposed conditions, which may include the variation, addition or deletion of conditions, any such changes shall be within their discretion. Conditions:
1) Amended Time Limit The development hereby permitted shall not commence later than the expiration of 3 years beginning with the date of the original planning permission Ref: 2022/03682/FUL dated 1st May 2024.
Condition required to be imposed by section 91(1)(a) of the Town and Country Planning Act 1990 (as amended by section 51 of the Planning and Compulsory Purchase Act 2004).
2) Approved Plans The development hereby permitted shall be carried out in complete accordance with the following approved drawing numbers and documents, other than where those details are altered pursuant to the conditions of this planning permission:
6318_03_00_120 Rev 1; 6318_03_01_121 Rev 1; 6318_03_02_122 Rev 1; 6318_03_03_123 Rev 1; 6318_03_RF_124 Rev 1; 6318_03_B2_125 Rev 1; 6318_03_B2_126 Rev 1; 6318_03_223 Rev 1; 6318_03_224 Rev 1; 6318_03_225 Rev 1; 6318_03_320 Rev 1; 6318_03_321 Rev 1; 6318_03_501 Rev 1; 6318_03_502 Rev 1; 6318_03_503 Rev 1; 6318_03_504 Rev 1 (all Received 25 November2025); Flood Risk Assessment (Received 25 November 2025); Addendum to Flood Risk Assessment (Received 19 February 2026); Updated Energy and Sustainability Statement (Received 27 February 2026). To ensure full compliance with the planning application hereby approved and to prevent harm arising through deviations from the approved plans, in accordance with Policies DC1, DC2 and DC8 of the Local Plan (2018).
3) Temporary Fencing The development hereby permitted shall not commence until a scheme for temporary fencing and/or enclosure of the site where necessary has been submitted to and approved in writing by the Council, and such enclosure has been erected in accordance with the approved details and retained for the duration of the building works.
No part of the temporary fencing and/or enclosure of the site shall be used for the display of advertisement hoardings.
To ensure a satisfactory external appearance of the site, in accordance with Policies DC1, DC2 and DC8 of the Local Plan (2018).
Details approved under application Ref No. 2024/01083/DET.
4) Construction Logistics Plan Notwithstanding the submitted details, prior to commencement of the development (save for works of site clearance and demolition of existing building) hereby approved, a final Construction Logistics Plan (CLP) shall have been submitted to and approved in writing by the Local Planning Authority.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Follow Planning and Development Control Committee at Hammersmith & Fulham and we tell you when its next papers are published, before the meeting rather than after it.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.