River Hamble Harbour Management Committee, Friday 9 March 2018 at 10.00am

Harbour Works Consent Application - Variation to existing consent for proposed pontoon layout at Swanwick Marina

Approved Committee 5 papers

River Hamble Harbour Management Committee approved this item on Friday 9 March 2018. Below is the council's own wording, with the papers it was decided on.

Item39

Resolved

That the River Hamble Harbour Management Committee recommends that the River Hamble Harbour Board approves the variation to the Harbour Works Consent for the proposal set out in this report and subject to the following conditions: a) That the proposed pontoon layout is to be built in accordance with the details and plan set out in paragraph 4, with conditions as specified in River Hamble Harbour Authority’s Harbour Works’ Consent dated 23 July 2007, with the single exception that fixed navigation lights as approved by Trinity House shall be fixed to each Hammerhead. b) Any changes to the exact location of any piles supporting the proposed layout that are found to be required at detailed design must be approved in writing by the Harbour Master. c) The applicant should ensure that only coatings and treatments that are suitable for use in the marine environment are used in accordance with best environmental practice. All reasonable precautions will be undertaken to ensure no pollutants enter the waterbody. d) The applicant should ensure that all equipment, temporary structures, waste and/or debris associated with the licensed activities is removed upon completion of the licensed activities. e) Vibro -piling should be used as standard. Percussive piling must only be used if needed to drive a pile to its design depth. If percussive piling is necessary then soft-start procedure must be used to ensure incremental increase in pile power over a set time period until full operational power is achieved. f) That the pontoon reconfiguration must be completed within 3 years from the date of the approval granted by the Harbour Board.
Word for word from the decision Hampshire published for this meeting. Source: democracy.hants.gov.uk

Follow this further

Built from Hampshire's papers

What the report saysPro

Report to River Hamble Harbour Management Committee

HAMPSHIRE COUNTY COUNCIL

Report

Committee River Hamble Harbour Management Committee

Date: 9 March 2018

Title: Harbour Works Consent Application - Variation to existing consent for proposed pontoon layout at Swanwick Marina

Report From: Director of Culture, Communities and Business Services

Contact name: Jason Scott or Alison Fowler

[email protected] Tel: 01489 576387 Email: [email protected]

1. Recommendation 1.1. That the River Hamble Harbour Management Committee recommends that the River Hamble Harbour Board approves the variation to the Harbour Works Consent (HWC) for the proposal set out in this report and subject to the following conditions: a. That the proposed pontoon layout is to be built in accordance with the details and plan set out in paragraph 4, with conditions as specified in River Hamble Harbour Authority’s Harbour Works’ Consent dated 23 July 2007, with the single exception that fixed navigation lights as approved by Trinity House shall be fixed to each Hammerhead. b. Any changes to the exact location of any piles supporting the proposed layout that are found to be required at detailed design must be approved in writing by the Harbour Master. c. The applicant should ensure that only coatings and treatments that are suitable for use in the marine environment are used in accordance with best environmental practice. All reasonable precautions will be undertaken to ensure no pollutants enter the waterbody. d. The applicant should ensure that all equipment, temporary structures, waste and/or debris associated with the licensed activities is removed upon completion of the licensed activities. e. Vibro-piling should be used as standard. Percussive piling must only be used if needed to drive a pile to its design depth. If percussive piling is necessary then soft-start procedure must be used to ensure incremental increase in pile power over a set time period until full operational power is achieved. f. That the pontoon reconfiguration must be completed within 3 years from the date of the approval granted by the Harbour Board.

2. Summary 2.1. This report sets out an application for HWC at Swanwick Marina, Swanwick Shore Road, SO31 1ZL, made by Marina Projects Limited on behalf of its client Premier Marinas Limited. 2.2. The proposal is for a variation to an existing HWC and relates to minor changes to the position of some of the pontoons and associated piles previously approved but not yet constructed.

3. Background 3.1. Premier Marinas Ltd holds current HWC for a large scale modernisation within the existing curtilage at Swanwick Marina which includes a new layout of the marina pontoons. This consent was granted by the Harbour Board in July 2007, and a minor variation request was subsequently approved in 2009. At the time this consent was not time-restricted and is therefore still valid for construction. 3.2. The redevelopment scheme at Swanwick Marina involves many elements outside the jurisdiction of the Harbour Authority (housing, parking, commercial units), and some have already commenced or been completed. This application relates only to the adjustment of the layout of pontoons and piles from that previously approved but not yet constructed.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Appendix 1aAppendix 1a 233 KB Download
PDF
Appendix 1bAppendix 1b 917 KB Download
PDF
Appendix 2Appendix 2 2.4 MB Download
PDF
Appendix 3Appendix 3 182 KB Download
PDF
Harbour Works Consent Application: Variation to existing consent for proposed pontoon layout at Swanwick MarinaReport 114 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

13 of 25 attended
SW
Councillor Seán WoodwardChairman, present
RH
Councillor Roger HuxstepVice-Chairman, present
FB
Councillor Fred BirkettCommittee Member, apologies
MC
Councillor Mark CooperCommittee Member, present
RC
Councillor Rod CooperCommittee Member, present
TC
Councillor Tonia CraigCommittee Member, absent
PH
Councillor Pal HayreCommittee Member, apologies
RK
Councillor Rupert KyrleCommittee Member, apologies, sent representative
SP
Councillor Stephen PhilpottCommittee Member, apologies
LQ
Councillor Lance QuantrillCommittee Member, present
AG
Councillor Andrew GibsonConservative Deputy
BT
Councillor Bruce TennentLiberal Democrats Deputy, present as substitute

All 25 on the meeting page

On this subject at Hampshire

Search all
  1. Harbour Works Consent Application - Variation to existing consent for proposed pontoon layout at Swanwick MarinaThis decision
  2. Harbour Works Consent Application - Quay Wall Refurbishment & Pontoon Works at Riverside BoatyardApproved
  3. Harbour Works Consent Application - Quay Wall Refurbishment & Pontoon Works at Riverside BoatyardApproved
  4. Harbour Works Consent Application - Minor rearrangement of walkway pontoon and installation of two finger pontoons at Prince Philip Yacht HavenApproved
  5. Harbour Works Consent Application - Minor rearrangement of walkway pontoon and installation of two finger pontoons at Prince Phillip Yacht HavenApproved
  6. Harbour Works Consent Application - Retention of existing jetty (retrospective application) and installation of new ecological enhancements at Highfield, SO31 7DFApproved

More from Hampshire River Hamble Harbour Management Committee

All decisions
MeetingDecisionOutcome
18 Sep 2026 Marine Director and Harbour Master's Report and Current IssuesThe River Hamble Harbour Management Committee supported the contents of this report to the Harbour Board. Decided Open
18 Sep 2026 Environmental UpdateThe River Hamble Harbour Management Committee noted and supported the remainder of this report. Noted Open
18 Sep 2026 Annual Review of Business PlanThe River Hamble Harbour Management Committee recommended that the River Hamble Harbour Board supports the contents o... Decided Open
18 Sep 2026 Forward Plan for Future MeetingsThe River Hamble Harbour Management Committee noted the report. Noted Open
12 Jun 2026 Marine Director and Harbour Master's Report and Current IssuesRESOLVED The River Hamble Harbour Management Committee supported the contents of this report to the Harbour Board. Decided Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies