That the River Hamble Harbour Board approves the variation to the Harbour Works Consent for the proposed pontoon layout at Swanwick Marina subject to the following conditions: a. That the proposed pontoon layout is to be built in accordance with the details and plan set out in paragraph 4, with conditions as specified in River Hamble Harbour Authority’s Harbour Works’ Consent dated 23 July 2007, with the single exception that fixed navigation lights as approved by Trinity House shall be fixed to each Hammerhead. b. Any changes to the exact location of any piles supporting the proposed layout that are found to be required at detailed design must be approved in writing by the Harbour Master. c. The applicant should ensure that only coatings and treatments that are suitable for use in the marine environment are used in accordance with best environmental practice. All reasonable precautions will be undertaken to ensure no pollutants enter the waterbody. d. The applicant should ensure that all equipment, temporary structures, waste and/or debris associated with the licensed activities is removed upon completion of the licensed activities. e. Vibro -piling should be used as standard. Percussive piling must only be used if needed to drive a pile to its design depth. If percussive piling is necessary then soft-start procedure must be used to ensure incremental increase in pile power over a set time period until full operational power is achieved. f. That the pontoon reconfiguration must be completed within 3 years from the date of the approval granted by the Harbour Board.
Word for word from the decision Hampshire published for this meeting.Source: democracy.hants.gov.uk
1. Recommendation 1.1. That the variation to the Harbour Works Consent for the proposal set out in this report be approved, subject to the following conditions: a. That the proposed pontoon layout is to be built in accordance with the details and plan set out in paragraph 4, with conditions as specified in River Hamble Harbour Authority’s Harbour Works’ Consent dated 23 July 2007, with the single exception that fixed navigation lights as approved by Trinity House shall be fixed to each Hammerhead. b. Any changes to the exact location of any piles supporting the proposed layout that are found to be required at detailed design must be approved in writing by the Harbour Master. c. The applicant should ensure that only coatings and treatments that are suitable for use in the marine environment are used in accordance with best environmental practice. All reasonable precautions will be undertaken to ensure no pollutants enter the waterbody. d. The applicant should ensure that all equipment, temporary structures, waste and/or debris associated with the licensed activities is removed upon completion of the licensed activities. e. Vibro-piling should be used as standard. Percussive piling must only be used if needed to drive a pile to its design depth. If percussive piling is necessary then soft-start procedure must be used to ensure incremental increase in pile power over a set time period until full operational power is achieved. f. That the pontoon reconfiguration must be completed within 3 years from the date of the approval granted by the Harbour Board.
2. Summary 2.1. This report sets out an application for Harbour Works Consent (HWC) at Swanwick Marina, Swanwick Shore Road, SO31 1ZL, made by Marina Projects Limited on behalf of its client Premier Marinas Limited. 2.2. The proposal is for a variation to an existing Harbour Works Consent and relates to minor changes to the position of some of the pontoons and associated piles previously approved but not yet constructed.
3. Background 3.1. Premier Marinas Ltd holds current Harbour Works Consent for a large scale modernisation within the existing curtilage at Swanwick Marina which includes a new layout of the marina pontoons. This consent was granted by the Harbour Board in July 2007, and a minor variation request was subsequently approved in 2009. At the time this consent was not time- restricted and is therefore still valid for construction. 3.2. The redevelopment scheme at Swanwick Marina involves many elements outside the jurisdiction of the Harbour Authority (housing, parking, commercial units), and some have already commenced or been completed. This application relates only to the adjustment of the layout of pontoons and piles from that previously approved but not yet constructed.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.