River Hamble Harbour Board, Friday 6 April 2018 at 10.00am

Harbour Works Consent Application - Variation to existing consent for proposed pontoon layout at Swanwick Marina

Approved Committee 5 papers

River Hamble Harbour Board approved this item on Friday 6 April 2018. Below is the council's own wording, with the papers it was decided on.

Item43

Resolved

That the River Hamble Harbour Board approves the variation to the Harbour Works Consent for the proposed pontoon layout at Swanwick Marina subject to the following conditions: a. That the proposed pontoon layout is to be built in accordance with the details and plan set out in paragraph 4, with conditions as specified in River Hamble Harbour Authority’s Harbour Works’ Consent dated 23 July 2007, with the single exception that fixed navigation lights as approved by Trinity House shall be fixed to each Hammerhead. b. Any changes to the exact location of any piles supporting the proposed layout that are found to be required at detailed design must be approved in writing by the Harbour Master. c. The applicant should ensure that only coatings and treatments that are suitable for use in the marine environment are used in accordance with best environmental practice. All reasonable precautions will be undertaken to ensure no pollutants enter the waterbody. d. The applicant should ensure that all equipment, temporary structures, waste and/or debris associated with the licensed activities is removed upon completion of the licensed activities. e. Vibro -piling should be used as standard. Percussive piling must only be used if needed to drive a pile to its design depth. If percussive piling is necessary then soft-start procedure must be used to ensure incremental increase in pile power over a set time period until full operational power is achieved. f. That the pontoon reconfiguration must be completed within 3 years from the date of the approval granted by the Harbour Board.
Word for word from the decision Hampshire published for this meeting. Source: democracy.hants.gov.uk

Follow this further

Built from Hampshire's papers

What the report saysPro

Report to River Hamble Harbour Board

HAMPSHIRE COUNTY COUNCIL

Report

Committee River Hamble Harbour Board

Date: 6 April 2018

Title: Harbour Works Consent Application - Variation to Existing Consent for Proposed Pontoon Layout at Swanwick Marina

Report From: Director of Culture, Communities and Business Services

Contact name: Jason Scott or Alison Fowler

[email protected] Tel: 01489 576387 Email: [email protected]

1. Recommendation 1.1. That the variation to the Harbour Works Consent for the proposal set out in this report be approved, subject to the following conditions: a. That the proposed pontoon layout is to be built in accordance with the details and plan set out in paragraph 4, with conditions as specified in River Hamble Harbour Authority’s Harbour Works’ Consent dated 23 July 2007, with the single exception that fixed navigation lights as approved by Trinity House shall be fixed to each Hammerhead. b. Any changes to the exact location of any piles supporting the proposed layout that are found to be required at detailed design must be approved in writing by the Harbour Master. c. The applicant should ensure that only coatings and treatments that are suitable for use in the marine environment are used in accordance with best environmental practice. All reasonable precautions will be undertaken to ensure no pollutants enter the waterbody. d. The applicant should ensure that all equipment, temporary structures, waste and/or debris associated with the licensed activities is removed upon completion of the licensed activities. e. Vibro-piling should be used as standard. Percussive piling must only be used if needed to drive a pile to its design depth. If percussive piling is necessary then soft-start procedure must be used to ensure incremental increase in pile power over a set time period until full operational power is achieved. f. That the pontoon reconfiguration must be completed within 3 years from the date of the approval granted by the Harbour Board.

2. Summary 2.1. This report sets out an application for Harbour Works Consent (HWC) at Swanwick Marina, Swanwick Shore Road, SO31 1ZL, made by Marina Projects Limited on behalf of its client Premier Marinas Limited. 2.2. The proposal is for a variation to an existing Harbour Works Consent and relates to minor changes to the position of some of the pontoons and associated piles previously approved but not yet constructed.

3. Background 3.1. Premier Marinas Ltd holds current Harbour Works Consent for a large scale modernisation within the existing curtilage at Swanwick Marina which includes a new layout of the marina pontoons. This consent was granted by the Harbour Board in July 2007, and a minor variation request was subsequently approved in 2009. At the time this consent was not time- restricted and is therefore still valid for construction. 3.2. The redevelopment scheme at Swanwick Marina involves many elements outside the jurisdiction of the Harbour Authority (housing, parking, commercial units), and some have already commenced or been completed. This application relates only to the adjustment of the layout of pontoons and piles from that previously approved but not yet constructed.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Appendix 1aAppendix 1a 233 KB Download
PDF
Appendix 1bAppendix 1b 917 KB Download
PDF
Appendix 2Appendix 2 2.4 MB Download
PDF
Appendix 3Appendix 3 182 KB Download
PDF
Harbour Works Consent Application: Variation to existing consent for proposed pontoon layout at Swanwick MarinaReport 114 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

6 of 9 attended
KE
Councillor Keith EvansChairman, present
PL
Councillor Peter LathamVice-Chairman, present
KH
Councillor Keith HouseCommittee Member, present
GH
Councillor Geoffrey HockleyConservative Deputy
RP
Councillor Roger PriceLiberal Democrats Deputy
NH
Nikki Hiorns Environmental Management RepresentativeCo-opted Member, apologies
DJ
David Jobson Recreational Sailing RepresentativeCo-opted Member, present
CM
Chris Moody Marine Industry RepresentativeCo-opted Member, present
JS
Jason Scott Marine Director (non voting)Co-opted Member, present

On this subject at Hampshire

Search all
  1. Harbour Works Consent Application - Variation to existing consent for proposed pontoon layout at Swanwick MarinaThis decision
  2. Harbour Works Consent Application - Quay Wall Refurbishment & Pontoon Works at Riverside BoatyardApproved
  3. Harbour Works Consent Application - Quay Wall Refurbishment & Pontoon Works at Riverside BoatyardApproved
  4. Harbour Works Consent Application - Minor rearrangement of walkway pontoon and installation of two finger pontoons at Prince Philip Yacht HavenApproved
  5. Harbour Works Consent Application - Minor rearrangement of walkway pontoon and installation of two finger pontoons at Prince Phillip Yacht HavenApproved
  6. Harbour Works Consent Application - Retention of existing jetty (retrospective application) and installation of new ecological enhancements at Highfield, SO31 7DFApproved

More from Hampshire River Hamble Harbour Board

All decisions
MeetingDecisionOutcome
26 Jun 2026 Marine Director and Harbour Master's Report and Current IssuesRESOLVED That the River Hamble Harbour Board supported the contents of this report. Decided Open
26 Jun 2026 Environmental UpdateRESOLVED That the River Hamble Harbour Board noted and supported the contents of this report. Noted Open
26 Jun 2026 River Hamble Final Accounts 2025/26 and Forecast Outturn 2026/27RESOLVED · That this report, the statutory accounts and management accounts for 2025/26 be approved by the River Hamb... Approved Open
26 Jun 2026 Review of Harbour DuesRESOLVED That the River Hamble Harbour Board approves an increase in Harbour Dues of 5% for the 2027 calendar year. Approved Open
26 Jun 2026 Forward Plan of Future MeetingsRESOLVED That the River Hamble Harbour Board noted the contents of this report. Noted Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies