CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Hampshire County Council
River Hamble Harbour Management Committee, Friday 7 December 2018 at 10.00am

Harbour Works Consent Application - Relocation of Existing Access Bridge and Installation of New Public Access Pontoon at Deacons Marina

Approved Committee 5 papers

River Hamble Harbour Management Committee approved this item on Friday 7 December 2018. Below is the council's own wording, with the papers it was decided on.

Item63

Resolved

That the River Hamble Harbour Management Committee recommends to the River Hamble Harbour Board to approve Harbour Works Consent for the proposal set out in Section 4 of the report and subject to the following conditions: a. The proposal is to be built in accordance with the details, plans and method set out in paragraph 4.1. b. Vibro -piling to be used as a standard. Percussive piling must only be used if needed to drive a pile to its design depth. If percussive piling is necessary then soft-start procedure must be used to ensure incremental increase in pile power over a set time period until full operational power is achieved. c. All equipment, temporary structures, waste and/or debris associated with the licensed activities must be removed upon completion of the licensed activities. d. Only coatings and treatments that are suitable for use in the marine environment to be used in accordance with best environmental practice. All reasonable precautions must be undertaken to ensure no pollutants enter the waterbody. e. Dean and Reddyhoff to take such reasonable steps as may be necessary to ensure free access to the additional attraction delivered by the pontoon and control parking on the slipway. f. The development must be completed within 3 years from the date of the approval granted by the Harbour Board.
Word for word from the decision Hampshire published for this meeting. Source: democracy.hants.gov.uk

Follow this further

Built from Hampshire's papers

What the report saysPro

Report to River Hamble Harbour Management Committee

HAMPSHIRE COUNTY COUNCIL

Report

Committee River Hamble Harbour Management Committee

Date: 7 December 2018

Title: Harbour Works Consent Application - Relocation of Existing Access Bridge and Installation of New Public Access Pontoon at Deacons Marina

Report From: Director of Culture, Communities and Business Services

Contact name: Jason Scott or Alison Fowler

[email protected] Tel: 01489 576387 Email: [email protected]

1. Recommendation 1.1. That the River Hamble Harbour Management Committee recommends to the River Hamble Harbour Board to approve Harbour Works Consent for the proposal set out in Section 4 of this report and subject to the following conditions: a. The proposal is to be built in accordance with the details, plans and method set out in paragraph 4.1. b. Vibro-piling to be used as a standard. Percussive piling must only be used if needed to drive a pile to its design depth. If percussive piling is necessary then soft-start procedure must be used to ensure incremental increase in pile power over a set time period until full operational power is achieved. c. All equipment, temporary structures, waste and/or debris associated with the licensed activities must be removed upon completion of the licensed activities. d. Only coatings and treatments that are suitable for use in the marine environment to be used in accordance with best environmental practice. All reasonable precautions must be undertaken to ensure no pollutants enter the waterbody. e. Dean and Reddyhoff to take such reasonable steps as may be necessary to ensure free access to the additional attraction delivered by the pontoon and control parking on the slipway. f. The development must be completed within 3 years from the date of the approval granted by the Harbour Board. 2. Summary 2.1. This report sets out an application for Harbour Works Consent (HWC) made by Dean & Reddyhoff Ltd. for works at Deacons Marina, Bridge Road, Bursledon, SO31 8AZ. The proposal is for the relocation of the existing access bridge from C, D & E jetties to alongside the existing crane area, and the installation of new public access pontoon adjacent to slipway at north end of site. 3. Background 3.1. Harbour Works Consent was granted by the Harbour Board in 2011 for Deacons to extend what is now the existing pontoon configuration out to the mid-stream pontoon location, creating a marina style layout. This remains valid. The planning application related to the same design has recently been granted by Eastleigh Borough Council (EBC) following an appeal by the applicant. A Marine Licence has also been granted by the Marine Management Organisation. These latter two permission have also included (i) the proposed bridge relocation and (ii) the proposed public pontoon. The applicant now seeks Harbour Works Consent for these two elements. 4. Project Description 4.1. The following plans and documents have been provided by the applicant to support this application, and reference must be made to these for a full understanding of the proposal (see Appendix 1):  Drawing No. 10667/1

 Project description “Proposed Access Bridge Relocation and Public Access Pontoon. Supporting Statement for Harbour Works Consent. Includes Method Statement, WaFD & WFD Assessments”

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Appendix 1aAppendix 1a 184 KB Download
PDF
Appendix 1bAppendix 1b 1.5 MB Download
PDF
Appendix 1cAppendix 1c 124 KB Download
PDF
Appendix 2Appendix 2 133 KB Download
PDF
Harbour Works Consent Application: Relocation of Existing Access Bridge and Installation of New Public Access Pontoon at Deacons MarinaReport 99 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

12 of 24 attended
SW
Councillor Seán WoodwardChairman, present
RH
Councillor Roger HuxstepVice-Chairman, present
FB
Councillor Fred BirkettCommittee Member, apologies
MC
Councillor Mark CooperCommittee Member, present
RC
Councillor Rod CooperCommittee Member, present
TC
Councillor Tonia CraigCommittee Member, absent
PH
Councillor Pal HayreCommittee Member, present
RK
Councillor Rupert KyrleCommittee Member, present
SP
Councillor Stephen PhilpottCommittee Member, present
LQ
Councillor Lance QuantrillCommittee Member, present
AG
Councillor Andrew GibsonConservative Deputy
RB
Rupert Boissier River Hamble Boatyard and Marina Operators AssociationCo-opted Member, present

All 24 on the meeting page

On this subject at Hampshire

Search all
  1. Harbour Works Consent Application - Relocation of Existing Access Bridge and Installation of New Public Access Pontoon at Deacons MarinaThis decision
  2. Harbour Works Consent Application - Quay Wall Refurbishment & Pontoon Works at Riverside BoatyardApproved
  3. Harbour Works Consent Application - Quay Wall Refurbishment & Pontoon Works at Riverside BoatyardApproved
  4. Harbour Works Consent Application - Minor rearrangement of walkway pontoon and installation of two finger pontoons at Prince Philip Yacht HavenApproved
  5. Harbour Works Consent Application - Minor rearrangement of walkway pontoon and installation of two finger pontoons at Prince Phillip Yacht HavenApproved
  6. Harbour Works Consent Application - Retention of existing jetty (retrospective application) and installation of new ecological enhancements at Highfield, SO31 7DFApproved

More from Hampshire River Hamble Harbour Management Committee

All decisions
MeetingDecisionOutcome
18 Sep 2026 Marine Director and Harbour Master's Report and Current IssuesThe River Hamble Harbour Management Committee supported the contents of this report to the Harbour Board. Decided Open
18 Sep 2026 Environmental UpdateThe River Hamble Harbour Management Committee noted and supported the remainder of this report. Noted Open
18 Sep 2026 Annual Review of Business PlanThe River Hamble Harbour Management Committee recommended that the River Hamble Harbour Board supports the contents o... Decided Open
18 Sep 2026 Forward Plan for Future MeetingsThe River Hamble Harbour Management Committee noted the report. Noted Open
12 Jun 2026 Marine Director and Harbour Master's Report and Current IssuesRESOLVED The River Hamble Harbour Management Committee supported the contents of this report to the Harbour Board. Decided Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies