Harbour Works Consent Application - Relocation of Existing Access Bridge and Installation of New Public Access Pontoon at Deacons Marina
ApprovedCommittee5 papers
River Hamble Harbour Management Committee approved this item on Friday 7 December 2018. Below is the council's own wording, with the papers it was decided on.
That the River Hamble Harbour Management Committee recommends to the River Hamble Harbour Board to approve Harbour Works Consent for the proposal set out in Section 4 of the report and subject to the following conditions: a. The proposal is to be built in accordance with the details, plans and method set out in paragraph 4.1. b. Vibro -piling to be used as a standard. Percussive piling must only be used if needed to drive a pile to its design depth. If percussive piling is necessary then soft-start procedure must be used to ensure incremental increase in pile power over a set time period until full operational power is achieved. c. All equipment, temporary structures, waste and/or debris associated with the licensed activities must be removed upon completion of the licensed activities. d. Only coatings and treatments that are suitable for use in the marine environment to be used in accordance with best environmental practice. All reasonable precautions must be undertaken to ensure no pollutants enter the waterbody. e. Dean and Reddyhoff to take such reasonable steps as may be necessary to ensure free access to the additional attraction delivered by the pontoon and control parking on the slipway. f. The development must be completed within 3 years from the date of the approval granted by the Harbour Board.
Word for word from the decision Hampshire published for this meeting.Source: democracy.hants.gov.uk
1. Recommendation 1.1. That the River Hamble Harbour Management Committee recommends to the River Hamble Harbour Board to approve Harbour Works Consent for the proposal set out in Section 4 of this report and subject to the following conditions: a. The proposal is to be built in accordance with the details, plans and method set out in paragraph 4.1. b. Vibro-piling to be used as a standard. Percussive piling must only be used if needed to drive a pile to its design depth. If percussive piling is necessary then soft-start procedure must be used to ensure incremental increase in pile power over a set time period until full operational power is achieved. c. All equipment, temporary structures, waste and/or debris associated with the licensed activities must be removed upon completion of the licensed activities. d. Only coatings and treatments that are suitable for use in the marine environment to be used in accordance with best environmental practice. All reasonable precautions must be undertaken to ensure no pollutants enter the waterbody. e. Dean and Reddyhoff to take such reasonable steps as may be necessary to ensure free access to the additional attraction delivered by the pontoon and control parking on the slipway. f. The development must be completed within 3 years from the date of the approval granted by the Harbour Board. 2. Summary 2.1. This report sets out an application for Harbour Works Consent (HWC) made by Dean & Reddyhoff Ltd. for works at Deacons Marina, Bridge Road, Bursledon, SO31 8AZ. The proposal is for the relocation of the existing access bridge from C, D & E jetties to alongside the existing crane area, and the installation of new public access pontoon adjacent to slipway at north end of site. 3. Background 3.1. Harbour Works Consent was granted by the Harbour Board in 2011 for Deacons to extend what is now the existing pontoon configuration out to the mid-stream pontoon location, creating a marina style layout. This remains valid. The planning application related to the same design has recently been granted by Eastleigh Borough Council (EBC) following an appeal by the applicant. A Marine Licence has also been granted by the Marine Management Organisation. These latter two permission have also included (i) the proposed bridge relocation and (ii) the proposed public pontoon. The applicant now seeks Harbour Works Consent for these two elements. 4. Project Description 4.1. The following plans and documents have been provided by the applicant to support this application, and reference must be made to these for a full understanding of the proposal (see Appendix 1): Drawing No. 10667/1
Project description “Proposed Access Bridge Relocation and Public Access Pontoon. Supporting Statement for Harbour Works Consent. Includes Method Statement, WaFD & WFD Assessments”
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
63Harbour Works Consent Application - Relocation of Existing Access Bridge and Installation of New Public Access Pontoon at Deacons MarinaThis decision
Follow River Hamble Harbour Management Committee at Hampshire and we tell you when its next papers are published, before the meeting rather than after it.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.