Resolved
That the River Hamble Harbour Board approves Harbour Works Consent for the proposal set out in Section 4 of this report and subject to the following conditions: i. The proposal is to be built in accordance with the details, plans and method set out in paragraph 4.1. ii. Vibro -piling to be used as a standard. Percussive piling must only be used if needed to drive a pile to its design depth. If percussive piling is necessary, then soft-start procedure must be used to ensure incremental increase in pile power over a set time period until full operational power is achieved. iii. All equipment, temporary structures, waste and/or debris associated with the licensed activities must be removed upon completion of the licensed activities. iv. Only coatings and treatments that are suitable for use in the marine environment to be used in accordance with best environmental practice. All reasonable precautions must be undertaken to ensure no pollutants enter the waterbody. v. Dean and Reddyhoff to take such reasonable steps as may be necessary to ensure free access to the additional attraction delivered by the pontoon and control parking on the slipway. vi. The development must be completed within 3 years from the date of the approval granted by the Harbour Board