River Hamble Harbour Board, Friday 12 July 2019 at 10.00am

Harbour Works Consent Application – Installation of a Hoist Dock Pontoon at Universal Marina

Approved Committee 3 papers

River Hamble Harbour Board approved this item on Friday 12 July 2019. Below is the council's own wording, with the papers it was decided on.

Item93

Resolved

That the River Hamble Harbour Board approves the Harbour Works Consent for the proposal set out in paragraph 4 of this report and subject to the following conditions: i. The proposal is to be built in accordance with the details, plans and method set out in paragraph 5. ii. The applicant should ensure that only coatings and treatments that are suitable for use in the marine environment are used in accordance with best environmental practice. All reasonable precautions will be undertaken to ensure no pollutants enter the waterbody. iii. The applicant should ensure that all equipment, temporary structures, waste and/or debris associated with the licensed activities is removed upon completion of the licensed activities. iv. The development must be completed within 3 years from the date of the approval granted by the Harbour Board.
Word for word from the decision Hampshire published for this meeting. Source: democracy.hants.gov.uk

Follow this further

Built from Hampshire's papers

What the report saysPro

Report to River Hamble Harbour Board

Recommendations

2. That the River Hamble Harbour Board approve Harbour Works Consent for the proposal set out in paragraph 4 of this report and subject to the following conditions: a. The proposal is to be built in accordance with the details, plans and method set out in paragraph 5. b. The applicant should ensure that only coatings and treatments that are suitable for use in the marine environment are used in accordance with best environmental practice. All reasonable precautions will be undertaken to ensure no pollutants enter the waterbody. c. The applicant should ensure that all equipment, temporary structures, waste and/or debris associated with the licensed activities is removed upon completion of the licensed activities. d. The development must be completed within 3 years from the date of the approval granted by the Harbour Board. Executive Summary

3. This report seeks to:  set out an application for Harbour Works Consent made by John Willment Marine Limited (via its agent Lymington Technical Services) for the installation of a hoist dock pontoon at Universal Marina, Crableck Lane, Sarisbury Green, SO31 7ZN.  Consider the impacts of the proposal on safety and ease of navigation and on the environment of the Hamble Estuary, both during construction and once operational.

Project Description

4. The proposal is for the installation of a landing pontoon to improve vessel launching efficiency from the hoist dock.

5. The following documents have been provided by the applicant to support this application, and reference must be made to these for a full understanding of the proposal (see Appendix 1a & 1b):  Drawing No. 10584/44B dated Feb 2019.  Supporting Statement

Harbour Authority’s Responsibilities

6. Consent may be granted by the River Hamble Harbour Board permitting harbour works in the River Hamble in accordance with Section 10 of the Southampton Harbour Act 1924 and Section 48 of the Southampton Harbour Act 1949 as amended by the River Hamble Harbour Revision Orders 1969 to 1989. Within the River Hamble Harbour Board’s statutory duties lies the responsibility to ensure that all matters concerning navigational safety and responsibilities under the Habitat Regulations are addressed. This area of responsibility includes the proposed development.

7. Navigational safety issues are addressed through the Port Marine Safety Code and the Harbour’s Safety Management System. Specific issues relevant to this particular application are covered within the Harbour Master’s comments below.

8. The River Hamble is part of the Solent European Marine Site and is afforded protection due to its international nature conservation value. The RHHA is a Relevant Authority under the Conservation of Habitats and Species Regulations 2010 as amended, commonly known as the Habitats Regulations. As a Relevant Authority the Harbour Authority has a duty to comply with the requirements of the Habitats Regulations. This means that the RHHA must ensure that, in the exercise of any of its powers or functions, it must have regard to both direct and indirect effects on interest features of the European Marine Site.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Harbour Works Consent Application: Installation of a Hoist Dock Pontoon at Universal MarinaReport 85 KB DownloadRead as text
PDF
Harbour Works Consent Universal Marina Appendix 1Appendix 221 KB Download
PDF
Harbour Works Consent Universal Marina Appendix 2Appendix 678 KB Download

At this meeting

Whole meeting

Who was there

6 of 9 attended
KE
Councillor Keith EvansChairman, present
PL
Councillor Peter LathamVice-Chairman, present
KH
Councillor Keith HouseCommittee Member, absent
GH
Councillor Geoffrey HockleyConservative Deputy
RP
Councillor Roger PriceLiberal Democrats Deputy
NH
Nikki Hiorns Environmental Management RepresentativeCo-opted Member, present
DJ
David Jobson Recreational Sailing RepresentativeCo-opted Member, present
CM
Chris Moody Marine Industry RepresentativeCo-opted Member, present
JS
Jason Scott Marine Director (non voting)Co-opted Member, present

On this subject at Hampshire

Search all
  1. Harbour Works Consent Application – Installation of a Hoist Dock Pontoon at Universal MarinaThis decision
  2. Harbour Works Consent Application - Quay Wall Refurbishment & Pontoon Works at Riverside BoatyardApproved
  3. Harbour Works Consent Application - Quay Wall Refurbishment & Pontoon Works at Riverside BoatyardApproved
  4. Harbour Works Consent Application - Minor rearrangement of walkway pontoon and installation of two finger pontoons at Prince Philip Yacht HavenApproved
  5. Harbour Works Consent Application - Minor rearrangement of walkway pontoon and installation of two finger pontoons at Prince Phillip Yacht HavenApproved
  6. Harbour Works Consent Application - Retention of existing jetty (retrospective application) and installation of new ecological enhancements at Highfield, SO31 7DFApproved

More from Hampshire River Hamble Harbour Board

All decisions
MeetingDecisionOutcome
26 Jun 2026 Marine Director and Harbour Master's Report and Current IssuesRESOLVED That the River Hamble Harbour Board supported the contents of this report. Decided Open
26 Jun 2026 Environmental UpdateRESOLVED That the River Hamble Harbour Board noted and supported the contents of this report. Noted Open
26 Jun 2026 River Hamble Final Accounts 2025/26 and Forecast Outturn 2026/27RESOLVED · That this report, the statutory accounts and management accounts for 2025/26 be approved by the River Hamb... Approved Open
26 Jun 2026 Review of Harbour DuesRESOLVED That the River Hamble Harbour Board approves an increase in Harbour Dues of 5% for the 2027 calendar year. Approved Open
26 Jun 2026 Forward Plan of Future MeetingsRESOLVED That the River Hamble Harbour Board noted the contents of this report. Noted Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies