River Hamble Harbour Board, Friday 10 July 2020 at 10.00am

Harbour Works Consent Application - Elevated Jetty at Holly House, Sarisbury Green, SO31 7AH

Approved Committee 4 papers

River Hamble Harbour Board approved this item on Friday 10 July 2020. Below is the council's own wording, with the papers it was decided on.

Item122

Resolved

That the River Hamble Harbour Board approves Harbour Works’ Consent for the proposal set out in paragraph 5 of the report and subject to the following conditions: a) The proposal is to be built in accordance with the details, plans and method set out in the application. b) Harbour Dues must be paid on any qualifying vessel used in association with this jetty. c) The jetty is not to be used as a resident berth for any vessel. d) This consent does not permit the addition of any pontoon or docking system alongside the jetty. e) The deck of the proposed jetty is to be open grid GRP to maximise light penetration and therefore significantly reduce the effects of shading. f) Timing of the works to be outside the overwintering bird season which runs from October 1st to March 31st (inclusive) to ensure any adverse effects on the integrity of the Solent and Southampton Water SPA and Ramsar Site is sufficiently avoided. g) A Construction Environmental Management Plan (CEMP) must be submitted to, and approved by Fareham Borough Council, and adhered to in order to avoid any accidental pollution events and therefore an adverse impact on the integrity of the SAC, SPA and Ramsar . h) The development must be completed within 3 years from the date of the approval granted by the Harbour Board.
Word for word from the decision Hampshire published for this meeting. Source: democracy.hants.gov.uk

Follow this further

Built from Hampshire's papers

What the report saysPro

Report to River Hamble Harbour Board

Recommendations

2. That the River Hamble Harbour Board approves Harbour Works’ Consent for the proposal set out in paragraph 5 of this report and subject to the following conditions: a. The proposal is to be built in accordance with the details, plans and method set out in this application. b. Harbour Dues must be paid on any qualifying vessel used in association with this jetty. c. The jetty is not to be used as a resident berth for any vessel. d. This consent does not permit the addition of any pontoon or docking system alongside the jetty. e. The deck of the proposed jetty is to be open grid GRP to maximise light penetration and therefore significantly reduce the effects of shading. f. Timing of the works to be outside the overwintering bird season which runs from October 1st to March 31st (inclusive) to ensure any adverse effects on the integrity of the Solent and Southampton Water SPA and Ramsar Site is sufficiently avoided. g. A Construction Environmental Management Plan (CEMP) must be submitted to, and approved by Fareham Borough Council, and adhered to in order to avoid any accidental pollution events and therefore an adverse impact on the integrity of the SAC, SPA and Ramsar. h. The development must be completed within 3 years from the date of the approval granted by the Harbour Board.

Executive summary

3. This report seeks to:  Set out an application for Harbour Works Consent (HWC) made by Lymington Technical Services on behalf of the owner of Holly House, Sarisbury Green, SO31 7AH, for the installation of a private raised jetty.  Consider the impacts of the proposal on the safety and ease of navigation and on the environment of the Hamble Estuary, both during construction and once operational. In considering the environmental impacts, it also takes into account the Appropriate Assessment undertaken by Fareham Borough Council under the provisions of the Habitats Regulations.

Project Description

4. The proposal is for the installation of a private elevated timber jetty to provide private access to the water for the site owner.

5. The following documents have been provided by the applicant to support this application, and reference must be made to these for a full understanding of the proposal (see Appendix 1a & 1b):  Appendix 1a: Drawing No. 10685/2 (Lymington Technical Services) dated Jan 2019.  Appendix 1b: Supporting Information Document.

Harbour Authority’s Responsibilities

6. Consent may be granted by the River Hamble Harbour Board permitting harbour works in the River Hamble in accordance with Section 10 of the Southampton Harbour Act 1924 and Section 48 of the Southampton Harbour Act 1949 as amended by the River Hamble Harbour Revision Orders 1969 to 1989. Within the River Hamble Harbour Board’s statutory duties lies the responsibility to ensure that all matters concerning navigational safety and responsibilities under the Habitat Regulations are addressed. This area of responsibility includes the proposed development.

7. Navigational safety issues are addressed through the Port Marine Safety Code and the Harbour’s Safety Management System. Specific issues relevant to this particular application are covered within the Harbour Master’s comments below.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
drawingAppendix 1a 171 KB Download
PDF
supporting informationAppendix 1b 906 KB Download
PDF
NE FeedbackAppendix 2 117 KB Download
PDF
Harbour Works Consent Application: Elevated Jetty at Holly House, Sarisbury Green, SO31 7AHReport 331 KB DownloadRead as text

At this meeting

Whole meeting
119Minutes of previous meeting held on 10 January 2020On the agenda
122Harbour Works Consent Application - Elevated Jetty at Holly House, Sarisbury Green, SO31 7AHThis decision

Who was there

7 of 9 attended
KE
Councillor Keith EvansChairman, present
PL
Councillor Peter LathamVice-Chairman, present
KH
Councillor Keith HouseCommittee Member, present
GH
Councillor Geoffrey HockleyConservative Deputy
RP
Councillor Roger PriceLiberal Democrats Deputy
NH
Nikki Hiorns Environmental Management RepresentativeCo-opted Member, present
DJ
David Jobson Recreational Sailing RepresentativeCo-opted Member, present
CM
Chris Moody Marine Industry RepresentativeCo-opted Member, present
JS
Jason Scott Marine Director (non voting)Co-opted Member, present

On this subject at Hampshire

Search all
  1. Harbour Works Consent Application - Elevated Jetty at Holly House, Sarisbury Green, SO31 7AHThis decision
  2. Harbour Works Consent Application - Quay Wall Refurbishment & Pontoon Works at Riverside BoatyardApproved
  3. Harbour Works Consent Application - Quay Wall Refurbishment & Pontoon Works at Riverside BoatyardApproved
  4. Harbour Works Consent Application - Minor rearrangement of walkway pontoon and installation of two finger pontoons at Prince Philip Yacht HavenApproved
  5. Harbour Works Consent Application - Minor rearrangement of walkway pontoon and installation of two finger pontoons at Prince Phillip Yacht HavenApproved
  6. Harbour Works Consent Application - Retention of existing jetty (retrospective application) and installation of new ecological enhancements at Highfield, SO31 7DFApproved

More from Hampshire River Hamble Harbour Board

All decisions
MeetingDecisionOutcome
26 Jun 2026 Marine Director and Harbour Master's Report and Current IssuesRESOLVED That the River Hamble Harbour Board supported the contents of this report. Decided Open
26 Jun 2026 Environmental UpdateRESOLVED That the River Hamble Harbour Board noted and supported the contents of this report. Noted Open
26 Jun 2026 River Hamble Final Accounts 2025/26 and Forecast Outturn 2026/27RESOLVED · That this report, the statutory accounts and management accounts for 2025/26 be approved by the River Hamb... Approved Open
26 Jun 2026 Review of Harbour DuesRESOLVED That the River Hamble Harbour Board approves an increase in Harbour Dues of 5% for the 2027 calendar year. Approved Open
26 Jun 2026 Forward Plan of Future MeetingsRESOLVED That the River Hamble Harbour Board noted the contents of this report. Noted Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies