Harbour Works Consent Application for Additional Berthing at Universal Marina
ApprovedCommittee5 papers
River Hamble Harbour Management Committee approved this item on Friday 5 March 2021. Below is the council's own wording, with the papers it was decided on.
That the River Hamble Harbour Management Committee recommends to the River Hamble Harbour Board to approve Harbour Works Consent for the proposal set out in Section 4 of his report and subject to the following conditions: a. The proposal is to be built in accordance with the details, plans and method set out in paragraph 4. b. The development is constructed in accordance with the guidance given in the industry Code of Practice for the design of marinas. c. Vibro-piling should be used as a standard rather than percussive piling. In the event that it is necessary to use percussive piling, soft-start procedures must be employed over a period of at least 20 minutes. Should piling cease for a period of greater than 10 minutes then the soft start procedure must be repeated. d. Percussive piling should only be permitted between 16 March and 29 November in any given year. e. The development must be completed within 3 years from the date of the approval granted by the Harbour Board.
Word for word from the decision Hampshire published for this meeting.Source: democracy.hants.gov.uk
1. Recommendations 1.1. That the River Hamble Harbour Management Committee recommends to the River Hamble Harbour Board to approve Harbour Works Consent for the proposal set out in Section 4 of this report and subject to the following conditions: a. The proposal is to be built in accordance with the details, plans and method set out in paragraph 4. b. The development is constructed in accordance with the guidance given in the industry Code of Practice for the design of marinas. c. Vibro-piling should be used as a standard rather than percussive piling. In the event that it is necessary to use percussive piling, soft-start procedures must be employed over a period of at least 20 minutes. Should piling cease for a period of greater than 10 minutes then the soft start procedure must be repeated. d. Percussive piling should only be permitted between 16 March and 29 November in any given year. e. The development must be completed within 3 years from the date of the approval granted by the Harbour Board.
2. Summary 2.1. This report outlines an application for Harbour Works Consent (HWC) made to the River Hamble Harbour Authority (RHHA). Points for consideration in the determination of the proposal are set out in relation to the Harbour Authority’s statutory responsibilities and remit for safety and ease of navigation and the natural environment of the Hamble Estuary, both during construction and once operational. 2.2. This proposal will also require separate approvals from other regulatory authorities and from The Crown Estate. 3. Background
3.1An application had been made by John Willment Marine Ltd. (via its agent Lymington Technical Services) for the rearrangement of marina berthing and for additional berths at Universal Marina, Crableck Lane, Sarisbury Green, SO31 7ZN
4. Project Description 4.1. The following plans and documents have been provided by the applicant’s agent, Lymington Technical Services, and reference must be made to these for a full understanding of the proposal (see Appendices 1 to 3): Drawing No 10764/MP/5A Rev A 23.9.2020, ‘Proposed Berth Alterations’. Supporting Statement, Document 10764/MP v2 Sept 2020 Environmental information to inform any required Habitats Regulations Assessment, Document 10764/ES v1 Oct 2020. 4.2. The documents above are also available for viewing, up to the point of determination, on the River Hamble Harbour Authority website at https://www.hants.gov.uk/thingstodo/riverhamble/worksapplication/currentwo rks 4.3. In addition, RHHA has undertaken the following: A Habitats Regulations Assessment, including an Appropriate Assessment. This is provided at Appendix 4.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Follow River Hamble Harbour Management Committee at Hampshire and we tell you when its next papers are published, before the meeting rather than after it.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.