A verbal vote was undertaken, with 3 in favour, 2 against and 1 abstention. With this vote River Hamble Harbour Board therefore approved Harbour Works’ Consent for the proposal set out in Section 4 of this report and subject to the following conditions a. The proposal to be built in accordance with the details, plans and method set out in paragraph 4. b. The development is constructed in accordance with the guidance given in the industry Code of Practice for the design of marinas. c. Vibro-piling should be used as a standard rather than percussive piling. In the event that it is necessary to use percussive piling, soft-start procedures must be employed over a period of ... view the full minutes text for item 153.
Word for word from the decision Hampshire published for this meeting.Source: democracy.hants.gov.uk
HABITATS REGULATIONS ASSESSMENT This is a record of the Habitats Regulations Assessment (‘HRA’) undertaken by the River Hamble Harbour Authority in its role as competent authority and in accordance with the provisions of the Conservation of Habitats and Species Regulations 2017 (as amended), known as the ‘Habitats Regulations’.
A plan or project requires RHHA as a statutory regulator to decide whether to license, permit, assent or authorise the proposal. Where such a proposal might affect a European Site, the Habitats Regulations require a competent authority to make an assessment of the proposal. In undertaking this HRA, the RHHA (as the competent authority in this case) may only give consent, permission, assent or authorisation to the plan or project where it is able to ascertain either:
a) that the proposal will not have a likely significant effect on a European site (either alone or in combination with other plans and projects), or;
b) that the proposal will have no adverse effect on the integrity of a European Site following an Appropriate Assessment.
If such effects cannot be ruled out, the proposal cannot proceed unless the further tests given in the Habitats Regulations can be satisfied.
Contents:
1. Project Information 2. Requirement for HRA 3. Details of Sites 4. Assessment of Likely Significant Effect (LSE) 5. Conclusion of LSE 6. Appropriate Assessment 7. Conclusions 8. Natural England’s comments
1. Project Information:
Application Type Harbour Works Consent Application to River Hamble Harbour Authority Project Title Rearrangement of marina berthing and additional berths at Universal Marina Location River Hamble: Universal Marina, Crableck Lane, Sarisbury Green, SO31 7ZN Applicant John Willment Marine Ltd Agent Lymington Technical Services Ltd.
2. Requirement for HRA:
European site(s) potentially impacted by proposed • Solent Maritime Special Area of plan or project: Conservation (SAC) (UK0030059) • Solent & Southampton Water Special Protection Area (SPA) (UK9011061) and Ramsar (UK11063) • Solent and Dorset Coast SPA
1 Is the proposal directly connected with, or necessary to the management of a European site for the No purpose of conserving the habitats or species for which the site is designated? Is it necessary to carry out an HRA? Yes. Proposal within or close to the above sites
3. Details of Sites:
Solent Maritime Special Area of Conservation (SAC) (UK0030059)
Proximity of proposal The proposal is within this SAC
Conservation advice NE Conservation Advice Package Solent Maritime SAC package used: Qualifying features: • Annual vegetation of drift lines • Atlantic salt meadows (Glauco-Puccinellietalia maritimae) • Coastal lagoons • Desmoulin's whorl snail (Vertigo moulinsiana) • Estuaries • Mudflats and sandflats not covered by seawater at low tide • Perennial vegetation of stony banks • Salicornia and other annuals colonising mud and sand • Sandbanks which are slightly covered by sea water all the time • Shifting dunes along the shoreline with Ammophila arenaria (“White dunes”) • Spartina swards (Spartinion maritimae)
Conservation The objectives are to ensure that, subject to natural change, the integrity of the objective(s): site is maintained or restored as appropriate, and that the site contributes to achieving the Favourable Conservation Status of its qualifying features, by maintaining or restoring:
• the extent and distribution of qualifying natural habitats and habitats of the qualifying species • the structure and function (including typical species) of qualifying natural habitats • the structure and function of the habitats of the qualifying species • the supporting processes on which qualifying natural habitats and the habitats of qualifying species rely • the populations of each of the qualifying species • the distribution of qualifying species within the site
Solent & Southampton Water SPA (UK9011061) and Solent and Southampton Water Ramsar (UK11063)
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.