CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
High Peak Borough Council
Development Control Committee, Monday 31 July 2017 at 1.30pm

Update Sheet

Noted Planning 1 paper

Development Control Committee noted this item on Monday 31 July 2017. Below is the council's own wording, with the papers it was decided on.

Item18/18

Resolved

That the update sheet be noted.
Word for word from the decision High Peak published for this meeting. Source: democracy.highpeak.gov.uk

Follow this further

Built from High Peak's papers

What the report saysPro

Report to Development Control Committee

Development Control Committee 31st July 2017

Updates sheet

HPK/2016/0692 – Land opposite Alders Meadow Buxton Road, Chinley

Revised plans were received following the publication of the Committee Report to clarify the number of dwellings proposed. This was a typographical error on the plans and should read as follows;

32 dwellings in total

15no 2x bed houses 9no 2x bed houses 4 2x bed flat 4 1x bed flat

DCC Policy and Monitoring – The education contributions identified below are based on the information provided for the site, identifying 32 dwellings (less 4 no 1 bedroom dwellings).  £68,394.06 for the provision of 6 secondary places at Chapel-en-le-Frith High School towards Project C - Enhancement of support facilities within the school.

Derbyshire Wildlife Trust – Updated comments provided following reports about a badger sett close by to the site.

DWT visited the site on 21st July with Belinda Wiggs from Access Ecology. The site visit did not identify any signs of badgers on site where access was possible (the vegetation was over 6ft in places). No evidence was noted of badgers entering the site under the palisade fencing.

Due to the timescales it is recommended an Ecological Clerk of Works (ECoW) should be on site to provide an ecological watching brief during the removal of dense/tall vegetation that has not been possible to fully inspect during the summer. The role of the ECoW can be detailed within a Construction Environmental Management Plan. Informatives for badgers should also be included on the decision notice.

If planning permission is granted, an additional condition and informative as listed below should be imposed:

Condition

No development shall take place (including demolition, ground works, vegetation clearance) until a construction environmental management plan (CEMP: Biodiversity) has been submitted to and approved in writing by the Local Planning Authority. The CEMP (Biodiversity) shall include the following. a) Risk assessment of potentially damaging construction activities. b) Identification of "biodiversity protection zones". c) Practical measures (both physical measures and sensitive working practices) to avoid or reduce impacts during construction (may be provided as a set of method statements). d) The location and timing of sensitive works to avoid harm to biodiversity features. e) The times during construction when specialist ecologists need to be present on site to oversee works. f) Responsible persons and lines of communication. g) The role and responsibilities on site of an ecological clerk of works (ECoW) or similarly competent person. h) Use of protective fences, exclusion barriers and warning signs.

The approved CEMP shall be adhered to and implemented throughout the construction period strictly in accordance with the approved details, unless otherwise agreed in writing by the Local Planning Authority.

Reason: To mitigate against the loss of existing biodiversity and nature habitats, in accordance with Policy EQ5 of the High Peak Local Plan 2016 and paragraph 17 and Section 11 of the National Planning Policy Framework.

Informative

No works which include the creation of trenches or culverts or the presence of pipes shall commence until measures to protect badgers from being trapped in open excavations and/or pipe and culverts are submitted to and approved in writing by the local planning authority. The measures may include:

• creation of sloping escape ramps (mammal ladders) for badgers (and other mammals potentially using the site), which may be achieved by edge profiling of trenches/excavations or by using planks placed into them at the end of each working day; and • open pipework greater than 200 mm outside diameter being blanked (capped) off at the end of each working day.

Officer Response:

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Update SheetReport 318 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

12 of 19 attended
MF
Mark ForresterOfficer, expected
TC
Tanya CooperCouncil Staff, expected
DL
Councillor David LomaxChair, present
ET
Councillor Emily ThraneVice-Chair, present
AB
Councillor Alan BarrowCommittee Member, present
LD
Councillor Lance DowsonCommittee Member, present
SF
Councillor Samantha FlowerCommittee Member, present
JK
Councillor John KappesCommittee Member, present
RM
Councillor Robert McKeownCommittee Member, present
GO
Councillor Graham OakleyCommittee Member, present
DR
Councillor Daren RobinsCommittee Member, apologies, sent representative
KS
Councillor Kath SizelandCommittee Member, present as substitute

All 19 on the meeting page

On this subject at High Peak

Search all
  1. Update SheetThis decision
  2. Update SheetNoted
  3. Update SheetNoted
  4. Update SheetNoted
  5. Update SheetNoted
  6. Update SheetNoted

More from High Peak Development Control Committee

All decisions
MeetingDecisionOutcome
10 Aug 2026 Minutes of the previous meetingThat the minutes of the meeting held on 13 July 2026 be approved as a correct record. Approved Open
10 Aug 2026 Update SheetThat the update sheet be noted. Noted Open
10 Aug 2026 Planning ApplicationsThat the report be noted. Noted Open
10 Aug 2026 HPK/2026/0134 - The Natural Baths, The Crescent, BuxtonThat the application be approved as set out in the report, subject to the amended condition from DCC Archaeology as s... Approved Open
10 Aug 2026 HPK/2026/0184 - Buxton Opera House, Water Street, Buxton, DerbyshireThat Listed Building Consent be granted as set out in the report: 2. That in the event of any changes being needed to... Approved Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies