CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
High Peak Borough Council
Development Control Committee, Monday 31 July 2017 at 1.30pm

HPK/2016/0692 - Land Opposite Alders Meadow, Buxton Road, Chinley

Deferred Planning 1 paper

Development Control Committee deferred this item on Monday 31 July 2017. Below is the council's own wording, with the papers it was decided on.

Item18/20

Resolved

That consideration of the application be deferred as members are concerned with the high level of density to the west of the proposed development, and request that the developer consider the submission of an alternative illustrative layout with a lower density level.
Word for word from the decision High Peak published for this meeting. Source: democracy.highpeak.gov.uk

Follow this further

Built from High Peak's papers

What the report saysPro

Report to Development Control Committee

HIGH PEAK BOROUGH COUNCIL DEVELOPMENT CONTROL COMMITTEE

Date 31st July 2017

Application HPK/2016/0692 No: Location Land Opposite Alders Meadow, Buxton Road, Chinley Proposal Outline planning permission with all matters reserved for proposed residential development Applicant [name removed] Jones, SJ Design Parish/ward Blackbrook Date registered 7th March 2017 If you have a question about this report please contact: Faye Plant, Tel. 01298 28400 extension 4995, [email protected]

1. SUMMARY OF RECOMMENDATION

APPROVE, subject to completion of a Section 106 Agreement and Conditions

2. DESCRIPTION OF THE SITE AND ITS SURROUNDINGS

2.1This application site is 0.9ha in area located on the outskirts of Chinley. The site is within the built up area boundary and the eastern section of the site is also an allocated site for housing as identified within the High Peak Local Plan 2016.

2.2The site falls into 2 areas, separated by a relatively recently constructed development of 10 dwellings named Alders Meadow. Land to the east and north of the site is designated greenbelt with the Manchester to Sheffield railway line running along the northern boundary. The site is currently wet marshy grassland, with scrub and woodland to the far north west of the site. The site is bound to the west by terraced dwellings fronting Alders Lane, which form part of the Chinley Conservation area.

2.3The site is accessed via Buxton Road which forms the southern boundary of the site and which runs through to the centre of Chinley to the west and to Chapel-en-le-Frith to the east. The village centre lies approximately 500m to the west, with Chapel-en-le-Frith located approximately 2km to the south of the site.

2.4The site is a relatively flat field, having a fall of 5.500m over its length of 155.00m. A detailed topographic survey is included in this application. There are no trees on site that would be affected by the proposals.

3. DESCRIPTION OF THE PROPOSAL 3.1 This application seeks outline consent with all matters reserved for residential development. Illustrative layout plans show access is to be taken from Alders Meadow and 2 additional access points from Buxton Road.

3.2Revised illustrative layout plans were submitted during the course of the application which show a layout of 34 dwellings consisting of - 11x 2 bed dwellings, - 15x 3bed dwellings, - 4x 2bed flats, - 4x 1 bed flats.

Alterations were made to the site layout and design to overcome officer concerns about over development of the site and to address the concerns of Derbyshire Wildlife Trust and Network Rail.

3.3The illustrative layout as submitted consists of 2 blocks of semi- detached properties accessed off Alders Meadow to the west of the site and a further two private access roads serving rows of terraces and semi-detached units with associated parking to the east of the site.

3.4Illustrative street scenes outlining an example of the design of the proposed dwellings shows a traditional design approach with a frontage onto Buxton Road, in a similar design and appearance to existing properties on Alders Meadow.

3.5The application is accompanied by the following supporting documents: • Design and Access Statement, (including Transport Statements and Affordable Housing Statements and revised during the course of the application to include Heritage Impact) • Sustainability Statement • Revised Drainage Strategy • Revised Ecological Assessment • Topographical Survey • Phase I Contaminated Land Survey • Arboricultural Survey • Draft heads of terms for Section 106 agreement • Site and Location Plans • Revised Illustrative layout and street scenes

3.6The application, the details attached to it including the plans, comments made by residents and the responses of the consultees can be found on the Council’s website at:

http://planning.highpeak.gov.uk/portal/servlets/ApplicationSearchServlet?PKI D=213132

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
HPK/2016/0692: Land Opposite Alders Meadow, Buxton Road, ChinleyReport 145 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

12 of 19 attended
MF
Mark ForresterOfficer, expected
TC
Tanya CooperCouncil Staff, expected
DL
Councillor David LomaxChair, present
ET
Councillor Emily ThraneVice-Chair, present
AB
Councillor Alan BarrowCommittee Member, present
LD
Councillor Lance DowsonCommittee Member, present
SF
Councillor Samantha FlowerCommittee Member, present
JK
Councillor John KappesCommittee Member, present
RM
Councillor Robert McKeownCommittee Member, present
GO
Councillor Graham OakleyCommittee Member, present
DR
Councillor Daren RobinsCommittee Member, apologies, sent representative
KS
Councillor Kath SizelandCommittee Member, present as substitute

All 19 on the meeting page

On this subject at High Peak

Search all
  1. HPK/2016/0692 - Land Opposite Alders Meadow, Buxton Road, ChinleyThis decision
  2. HPK/2026/0146 - Land at St Georges Rd, New Mills DerbyshireRefused
  3. HPK/2023/0328 - Portland Nursing Home, 8 Park Road, BuxtonApproved
  4. HPK/2025/0340 - Hargate Hill Equestrian Centre Hargate Hill, Glossop - Retrospective application for change of use of land for the siting of caravans for residential occupation with associated developmentRefused
  5. HPK/2025/0447 - Land at Crossings Road, Chapel-en-le-FrithApproved
  6. HPK/2024/0496 - Land off Brown Edge Close, BuxtonApproved

More from High Peak Development Control Committee

All decisions
MeetingDecisionOutcome
10 Aug 2026 Minutes of the previous meetingThat the minutes of the meeting held on 13 July 2026 be approved as a correct record. Approved Open
10 Aug 2026 Update SheetThat the update sheet be noted. Noted Open
10 Aug 2026 Planning ApplicationsThat the report be noted. Noted Open
10 Aug 2026 HPK/2026/0134 - The Natural Baths, The Crescent, BuxtonThat the application be approved as set out in the report, subject to the amended condition from DCC Archaeology as s... Approved Open
10 Aug 2026 HPK/2026/0184 - Buxton Opera House, Water Street, Buxton, DerbyshireThat Listed Building Consent be granted as set out in the report: 2. That in the event of any changes being needed to... Approved Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies