That planning permission be approved, subject to the conditions as set out within the report; 2. That in the event of any changes being needed to the wording of the Committee’s decision (such as to delete, vary or add conditions / informatives / planning obligations or reasons for approval / refusal) prior to the decision being issued, the Operations Manager – Development Services be delegated authority to do so in consultation with the Chair of the Committee, provided that the changes do not exceed the substantive nature of the committee’s decision.
Word for word from the decision High Peak published for this meeting.Source: democracy.highpeak.gov.uk
HIGH PEAK BOROUGH COUNCIL DEVELOPMENT CONTROL COMMITTEE
Date 31st July 2017
Application HPK/2017/0201 No: Location 89 Macclesfield Old Road, Buxton Proposal Proposed two storey side extension and relocated garage Applicant [name removed] [name removed], Kinder View, New Mills Parish/ward Burbage Ward Date registered 11th April 2017 If you have a question about this report please contact: Moya Phillips, Tel. 01298 28400 extension 4984, [email protected]
1. SUMMARY OF RECOMMENDATION
APPROVE
REASON FOR COMMITTEE DETERMINATION
1.1This application has been brought before the Development Control Committee because the applicant is the partner of a member of staff within the Council.
2. DESCRIPTION OF THE SITE AND ITS SURROUNDINGS
2.1The application site is a semi-detached two storey dwelling to the south of Macclesfield Old Road within the Built-up area of Burbage. The building occupies a large sloping plot and is accessed via a driveway. The neighbouring dwelling ( 91 Macclesfield Old Road) is elevated above the site by 1.3m with a retaining wall to the common boundary between the two driveways that is open and unfenced.
2.2The building is constructed from dashed render with bricks to the lower courses, a slate roof and white upvc windows and doors. To the rear there is a raised patio area where a conservatory has been constructed.
3. DESCRIPTION OF THE PROPOSAL
3.1The application seeks planning permission for the addition of a two storey side extension to the western elevation and following the submission of revised plans it is proposed to include a privacy canopy and a 3m boundary fence to the common boundary between the site and no. 91 Macclesfield Old Road. The plans also include the relocation of the existing garage to facilitate the construction of the extension. The two storey extension will be set down and set back and will be built off the rear
1 roof slope with a hipped roof form to match the existing dwelling. The plans show a porch canopy over the newly created front door.
3.2It is proposed to construct the extension from materials that match the existing dwelling.
3.3The application, the details attached to it including the plans, comments made by residents and the responses of the consultees can be found on the Council’s website at:
High Peak Local Plan 2016 S1 – Sustainable Development Principles S1a – Presumption in Favour of Sustainable Development S2 – Settlement Hierarchy S7 – Buxton Sub-area Strategy CF6 – Accessibility and Transport EQ6 – Design and Place Making
National Planning Policy Framework Paragraph 17 Section 7 – Requiring Good Design
6. CONSULTATIONS CARRIED OUT
Site notice Expiry date for comments: 05th June 2017 Neighbour letters Expiry date for comments: 24th July 2017
Neighbours One letter of objection has been received, from the neighbour at No. 91 expressing concerns regarding loss of 50% of light to their property, loss of view and the devaluation of their property. The letter also draws attention to the fact that the applicant’s partner is employed by the council.
Consultee Comment Officer response
Severn Trent I can confirm that we have no
2 Water objections to the proposals subject to the inclusion of the following conditions:
1.The development hereby permitted should not commence until drainage plans for the disposal of foul and surface water flows have been submitted to and approved by the Local Planning Authority, and; 2. The scheme shall be implemented in accordance with the approved details before the development is first brought into use. This is to ensure that the development is provided with a satisfactory means of drainage as well as to prevent or to avoid exacerbating any flooding issues and to minimise the risk of pollution.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.