That authority be delegated to the Operations Manager – Development Services, in consultation with the Chair to approve the application, subject to the expiry of the statutory consultation period and the receipt of no new substantive matters and the conditions as set out in the report; 2. That in the event of any changes being needed to the wording of the committee’s decision (such as to delete, vary or add conditions / informatives / planning obligations or reasons for approval / refusal) prior to the decision being issued, the Operations Manager – Development Services be delegated authority to do so in consultation with the Chair of the Committee, provided that the changes do not exceed the substantive nature of the committee’s decision.
Word for word from the decision High Peak published for this meeting.Source: democracy.highpeak.gov.uk
HIGH PEAK BOROUGH COUNCIL DEVELOPMENT CONTROL COMMITTEE
Date 5th November 2018
Application HPK/2018/0526 No: Location Land to the rear of Hallsteads, Dove Holes, Buxton Proposal Application to vary Condition 3 of Outline planning permission HPK/2013/0625 to facilitate a phased discharge of the condition and phased development. Applicant Hopwood Homes Limited Agent Michael Green Planning Services Parish/ward Limestone Ward Date registered 19th October 2018 If you have a question about this report please contact: Moya Phillips, [email protected] Tel: 01298 28400 ext. 4984
REFERRAL
This application has been brought before the Development Control Committee as it involves a variation to a planning condition imposed on a major development.
1. SUMMARY OF RECOMMENDATION
Approve, subject to the completion of a Deed of Variation to the completed Section 106 agreement and conditions
2. DESCRIPTION OF THE SITE AND ITS SURROUNDINGS
2.1This application relates to land to the east of Hallsteads in Dove Holes a development site that is currently under various stages of construction defined as Phase 1 and Phase 2. Outline planning permission was granted for the whole site in 2013 under HPK/2013/ 0319, with all matters reserved and subsequently amended under HPK/2013/0625 to allow for the construction of up to 120 homes on the site. All outstanding outline conditions attached to this consent have now been discharged (DOC/2016/0052) with the exception of Condition 3. The application is also pertinent to the highways serving the recently completed adjacent development of Walker Brow and The Meadows to the south.
2.2Phase 1 consists of Plots 1 – 21 and is defined by Reserved Matters application HPK/2015/0563 which was approved on 20/04/2016. Phase 2 consists of plots 22-104 and is defined by Reserved Matters application HPK/2016/0488 which is still pending.
1 2.3 The development site wraps around the rear of existing dwellings at Hallsteads which front the A6 trunk road to the north of the village. The intended access route to serve the development from the A6 will be via The Meadows and Walker Brow. However there is a temporary site construction road to the north of the site linking it to the A6.
2.4The whole site is bounded in the main by post and wire fencing and low drystone walls. The undeveloped area of the site consists of rough grassland.
3. DESCRIPTION OF THE PROPOSAL
3.1Outline planning permission was granted on 10 September 2013 (HPK/2013/0319) with condition 18 restricting the number of units to 58 dwellings or less with all matters reserved for a later date. A further application (HPK/2013/0625) to vary condition 18 to allow for up to 120 dwellings was refused and subsequently approved at appeal on 27th October 2014. This later consent supersedes the earlier consent and all conditions have been discharged with the exception of Condition 3, the subject of this application.
3.2This application seeks to vary condition 3 imposed under the above outline approval HPK/2013/0625 in order to allow for a phased discharge of the condition. Condition 3 stated that:
3. Prior to the commencement of the development hereby approved, a scheme for the provision/completion of all highways within the red edge of the application site to Derbyshire County Council’s (DCC) adoptable standards, shall be submitted to, and approved, in writing by, the Local Planning Authority. The submitted scheme shall make provision for the phasing of all such highway works (to include as the first phase works to complete Walker Brow and The Meadows to said adoptable standards) and the financial arrangements for complete delivery of the above highways to said adoptable standards, and measures that will ensure that no dwelling hereby approved is occupied until such time as there is a highway in place constructed to DCC adoptable standards linking it to the A6 at Dove Holes via Walker Brow and The Meadows.
3.3It is proposed to amend this condition to read:
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.