AI summaryHigh Peak Development Control Committee approves five single-storey homes on land off Brown Edge Close, Buxton, subject to a legal agreement and conditions, after a February deferral over highways, Network Rail, flooding and land stability concerns.
Written from the decision and the officer reportPDF Pro
OutcomeApprovedFive single-storey dwellings and associated works
MoneyNo sum stated in the papers
What happens nextS106 Agreement requiredTo secure on site biodiversity net gain and nutrient neutrality
Who it affectsLand off Brown Edge Close, BuxtonSite borders the Buxton to Manchester railway
What was decided
The Committee approved the construction of five single-storey dwellings and associated works, as set out in the officer report. Report P5, P71
Approval is subject to a Section 106 Agreement covering on-site biodiversity net gain and nutrient neutrality, and a list of 20 planning conditions covering design, public health, ecology, trees, highways and drainage. Report P71, P73, P99
The Head of Development Services is given delegated authority, in consultation with the Committee Chair, to make any minor wording changes to conditions, informatives, planning obligations or reasons before the decision is issued. Report P100
Why
Officers concluded that all four reasons for the February deferral had been addressed: AES Waste confirmed a refuse vehicle could access and turn using the technical drawings, and the Highways Authority accepted the proposed access and internal layout. Report 3.7, 3.8, 3.10, P21, P25, P28
Network Rail withdrew its holding objection on 2 April 2026, subject to the applicant completing a Basic Asset Protection Agreement; no built development is within approximately 50m of Network Rail's boundary and these matters fall outside the planning system. Report 3.17, 3.18, P39
Flooding and land stability concerns are to be controlled by conditions, including a drainage strategy and full details of all retaining walls and engineering operations before development begins; the site is in Flood Zone 1, so no Flood Risk Assessment is required. Report 3.23, 3.26, 3.33, P80, P97
What happens next
A Section 106 Agreement must be completed to secure on-site biodiversity net gain and nutrient neutrality before the decision is issued. Report P71
Several pre-commencement conditions must be discharged, covering contamination, piling hours, drainage strategy, biodiversity net gain, habitat monitoring, herptile method statement, species enhancement, retaining structures and engineering operations. Report P82, P83, P86, P87, P88, P90, P97, P80
An informative will be added advising the applicant to engage with Network Rail and complete the Basic Asset Protection Agreement before any work starts. Report 3.19, P42
Options considered
Chosen: Approve subject to S106 Agreement and conditions. Officers were satisfied that highways, refuse collection, Network Rail, flooding, drainage and land stability concerns had been addressed or could be controlled by conditions. Report P5, P71, 4.1
Rejected: Refuse or further defer. No alternative was put to Members; officers concluded previous concerns were adequately addressed. Report 4.1, P68
Implications
Legal: Decision subject to a Section 106 Agreement covering biodiversity net gain and nutrient neutrality, with delegated authority to the Head of Development Services for minor wording changes. Report P71, P100
Risk: Conditions require full details of retaining walls, engineering operations and drainage before development begins to manage land stability and drainage risks. Report P80, P97, 3.33
Environment and climate: Biodiversity net gain, habitat monitoring, a herptile method statement, a lighting strategy and a species enhancement plan are required as conditions. Report P86, P87, P88, P89, P90
Other: Construction working hours and delivery times are tightly controlled by condition, including no working on Sundays or bank holidays. Report P83, P84
Other: Network Rail's Basic Asset Protection Agreement is required before commencement, falling outside the planning system. Report 3.16, 3.18, P39
Who and where
Residents near Brown Edge Close, Buxton, who raised concerns on flooding, drainage, land stability and railway boundary issues. Report 1.1, 3.20, 3.30
Network Rail, as the site borders the Buxton to Manchester railway on its eastern side. Report 3.11, 3.14, P30
Derbyshire County Council Highways, which has confirmed the access and internal layout are acceptable. Report 3.8, P23, P25
The Council's waste management service (AES Waste), which has confirmed refuse vehicle access and turning is acceptable subject to no parking in front of the turning area. Report 3.7, P21
Future occupiers of the five new single-storey dwellings, with two parking spaces per dwelling. Report P28, P94
22nd July 2025: Highways Authority confirmed the site access is acceptable. Report 3.8, P23
23rd February: Application deferred by the Committee to address highways, refuse collection, Network Rail, flooding and land stability issues. Report 1.1, P8
27th February: Agent submitted a letter in support after the deferral. Report 2.1
2nd April 2026: Network Rail withdrew its holding objection subject to a Basic Asset Protection Agreement. Report 3.17, P39
20 April 2026: Development Control Committee approved the application, subject to a Section 106 Agreement and 20 planning conditions. Report P2, P71
Plain English for the jargon
S106 Agreement: A legal agreement under Section 106 of the Town and Country Planning Act 1990 used to secure planning obligations such as affordable housing or biodiversity net gain.
BNG: Biodiversity Net Gain, a requirement that development delivers an overall increase in biodiversity compared with the site before development.
BAPA: Basic Asset Protection Agreement, an agreement with Network Rail to ensure works near the railway do not harm railway assets.
Flood Zone 1: Land assessed as having a low probability of flooding, where no Flood Risk Assessment is required for minor development.
NPPF: National Planning Policy Framework, the government's national planning policy document.
What was decided, why, and what happens next
Pro reads every officer report for you and explains each decision in plain English: the money, the options, the risks, the timeline, each with the paragraph it came from.
Written by AI from the council's published papers. AI can get things wrong: the council's own wording below is the record.Report a problem
Item26/116
Resolved
That the application be approved as set out in the report; and 2. That in the event of any changes being needed to the wording of the Committee’s decision (such as to delete, vary or add conditions/informatives/planning obligations or reasons for approval/refusal) prior to the decision being issued, the Head of Development Services be delegated authority to do so in consultation with the Chair of the Committee, provided that the changes do not exceed the substantive nature of the Committee’s decision.
Word for word from the decision High Peak published for this meeting.Source: democracy.highpeak.gov.uk
ADDENDUM REPORT HIGH PEAK BOROUGH COUNCIL DEVELOPMENT CONTROL COMMITTEE
Date 20 April 2026
Application No: HPK/2024/0496 Location Land off Brown Edge Close, Buxton Proposal Construction of 5 single-storey dwellings and associated works Applicant Mr and [name removed] / Kaur Sandhu Agent Emery Planning Parish/ward Corbar Ward Date registered 9th Dec 2024 If you have a question about this report please contact: James Stannard, Tel. 01298 28400 extension 4298, [email protected]
1. SUMMARY OF RECOMMENDATION
Approve subject to S106 Agreement and Conditions
1. REASON FOR COMMITTEE DETERMINATION
1.1This application has been brought before the Development Control Committee owing to significant public interest in the application and was deferred by members in February in order to fully understand matters relating to:
(i) Highways and Refuse Collection; (ii) Network Rail assets; (iii) Flooding and Drainage (iv) Land Stability
2. ADDITIONAL REPRESENTATIONS
2.1Since the deferral in February, a letter has been submitted by the agent (dated 27th February) and a further representation received from a local resident reiterating their concerns, containing photographic evidence. Both are available to view on the Council’s Website at. http://planning.highpeak.gov.uk/portal/servlets/ApplicationSearchServle t?PKID=268821
2.2Further consultation responses have also been received from Network Rail, DCC Highways and AES waste. These can also be viewed via the above link and the relevant comments will be referred to in the report below.
1 3. OFFICER COMMENTS
3.1A copy of the Committee report that was published prior to the previous Committee meeting on February 23rd accompanies this report as an Appendix.
3.2This report focuses on the matters that formed the reasons for deferring the application.
Highways and Refuse Collection
3.3Comments from the Council’s waste management service (AES Waste) made in connection with the application in its original form requested further details to be provided in the form of a tracked plan to show waste collection vehicle access and turning.
3.4Officer’s advised Members further to a site visit at February Committee that this issue could be satisfactorily dealt with by way of a pre- commencement condition. However this was not considered to be sufficient, and as such the application was deferred in order to fully assess and establish the acceptability or otherwise of vehicle movements relating to waste collection.
3.5The application has been supported by a Technical Note prepared by Transport Consultants SCP, which was submitted after the comments from AES Waste had been received.
3.6The Technical Note contains a detailed technical drawing showing the Access Arrangement at Appendix E (Ref: SCP/230825/D01 Rev B), and a Swept Path Analysis for Large Refuse Vehicles at Appendix F (Ref: SCP/230825/ATR01 Rev C).
3.7Further comments have been received from AES Waste in light of this Technical Note, which state the following:
“This covers everything that I raised and am happy that we would be able to access the area and turn around - this is along as no one parks in front of the driveway shown as the turning area. If they do the reverse to the end is too long which means the residents would need to pull their bins out to the main road.”
3.8Comments from the Highways Authority (dated 22nd July 2025) have confirmed that the site access from Brown Edge Road is acceptable, stating the following:
“The application proposes to widen the existing site access off Brown Edge Road i.e. Brown Edge Close to a total width of 7.6m, made up of a carriageway width of 4.8m, a footway of 1.9m and a margin of 0.9m. The proposed access is in line with DCC’s highway design guide for a private drive.”
2 3.9 The Highways Authority, also find that the internal layout as set out on the technical drawings located within the Technical Note referenced above and on the latest revised Proposed Site Plan, is acceptable, stating the following:
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.