CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
High Peak Borough Council
Development Control Committee, Monday 10 August 2020 at 1.30pm

HPK/2020/0033 - No.105 Buxton Road, Whaley Bridge - First floor extension to provide additional office space (B1 Use)

Agreed Planning 1 paper

Development Control Committee agreed this item on Monday 10 August 2020. Below is the council's own wording, with the papers it was decided on.

Item20/104

Resolved

That permission be granted as set out in the report, subject to: ( i ) the extension of the scope of the S106 agreement to ensure that the church car park is laid out in such a way as to maximise the number of parking spaces available; 2. That in the event of any changes being needed to the wording of the Committee’s decision (such as to delete, vary or add conditions/ informatives /planning obligations or reasons for approval/refusal) prior to the decision being issued, the Head of Development Services be delegated authority to do so in consultation with the Chair of the Committee, provided that the changes do not exceed the substantive nature of the Committee’s decision.
Word for word from the decision High Peak published for this meeting. Source: democracy.highpeak.gov.uk

Follow this further

Built from High Peak's papers

What the report saysPro

Report to Development Control Committee

HIGH PEAK BOROUGH COUNCIL DEVELOPMENT CONTROL COMMITTEE

Date 10th August 2020

Application HPK/2020/0033 No: Location No.105 Buxton Road, Whaley Bridge Proposal First floor extension to provide additional office space (B1 Use) Applicant [name removed] [name removed]/ward Whaley Bridge / Whaley Date registered 5th February Bridge 2020 If you have a question about this report please contact: James Stannard, Tel. 01298 28400 extension 4298, [email protected]

1. SUMMARY OF RECOMMENDATION

Approve with Conditions

1. REASON FOR COMMITTEE DETERMINATION

1.1This application has been brought before the Development Control Committee at the request of Councillor Lomax due to a high level of local public interest

2. DESCRIPTION OF THE SITE AND ITS SURROUNDINGS

2.1The application site relates to No.105 (Dunbar House)( Buxton Road, Whaley Bridge; a one and a half storey building in an art deco style that is shown on the Existing Plans to serve 7x office units (B1 Use) units at ground floor level. The building is constructed in a dark red brick with white render and subtle artistic detailing characterising the front elevation.

2.2The northern boundary of the site fronts the small brook that runs underneath Buxton Road, whilst the eastern boundary fronts the public highway and properties on the opposite side of the road. The rear of the building fronts the neighbouring property No.107 Buxton Road. To the south, separated by a small alleyway, is No.109; a two storey residential property that sits within a row that extends southwards.

2.3The existing building does not benefit from any off-street parking provision. In order to address this issue, the latest Location Plan also includes the grounds of the nearby Holy Trinity Church, situated some 70m distant.

1 2.4 The site lies within the built-up area boundary of Whaley Bridge and within the Whaley Bridge Conservation Area.

3. DESCRIPTION OF THE PROPOSAL

3.1The application seeks permission for a first floor extension on the existing flat floor to accommodate a further 3 x office units and WC totalling 132sqm.

3.2Following concerns relating to matters of Design and Appearance and Parking Provision/Highway Safety, the applicant has submitted revised plans which have been subject to a full re-consultation with statutory consultees and members of the public.

3.3Further to comments received during this re-consultation period, the applicant has submitted further revisions to the Proposed Elevations. The plans and documentation that are before the committee for determination are as follows:

- Location Plan (Ref: 100C) - Proposed Plans (Ref: 200D) - Flood Risk Map - Design Access and Heritage Statement - Letter of Support from Landlord - Letter of Agreement to allocate parking within Holy Trinity Church

3.4The Floor and Elevation Plans show that the proposed first floor extension comprises a dual pitched gable facing Buxton Road with another dual pitched extension running at right angles linking the new gable with the existing.

3.5The extension would be constructed of brick finished in render with a slate roof. A small single first floor window is shown in the front elevation, with 5 x velux roof lights in the side (northern) elevation and 2 x velux roof lights on the side (southern) elevation.

4. RELEVANT PLANNING HISTORY

4.1The site has been subject to the following planning history:

HPK/0002/6797 New Shop Front (Approved 18/07/1988)

HPK/0002/6798 Sign (Approved 18/07/1988)

HPK/0003/6159 Wholesale of fashion accessories and clothing production of embroidery programmes using computers (Approved 13/12/1993)

HPK/0003/6159 Renewal of approval under HPK/0003/6159 (Approved 30/04/1997)

2 HPK/0003/8162 Change of Use from wholesale to retail outlet for bathroom sales and plumbing trade counter (Approved 30/06/1999)

5. PLANNING POLICIES RELEVANT TO THE DECISION

High Peak local Plan 2016

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
HPK/2020/0033: No.105 Buxton Road, Whaley Bridge: First floor extension to provide additional office space (B1 Use)Report 272 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

12 of 21 attended
RM
Councillor Robert McKeownChair, present
DL
Councillor David LomaxVice-Chair, present
AB
Councillor Alan BarrowCommittee Member, present
LD
Councillor Lance DowsonCommittee Member, present
CF
Councillor Charlotte FarrellCommittee Member, present
IH
Councillor Ian HuddlestoneCommittee Member, present
GO
Councillor Graham OakleyCommittee Member, present
JP
Councillor Jim PerkinsCommittee Member, present
PR
Councillor Peter RobertsCommittee Member, present
ET
Councillor Emily ThraneCommittee Member, present
JT
Councillor Jean ToddCommittee Member, present
SY
Councillor Stewart YoungCommittee Member, present

All 21 on the meeting page

On this subject at High Peak

Search all
  1. HPK/2020/0033 - No.105 Buxton Road, Whaley Bridge - First floor extension to provide additional office space (B1 Use)This decision
  2. HPK/2026/0134 - The Natural Baths, The Crescent, BuxtonApproved
  3. HPK/2026/0184 - Buxton Opera House, Water Street, Buxton, DerbyshireApproved
  4. HPK/2023/0328 - Portland Nursing Home, 8 Park Road, BuxtonApproved
  5. HPK/2026/0034 (Full Planning Permission) - HPK/2026/0035 (Listed Building Consent) - 6 Grosvenor Mansions, Broad Walk, Buxton, Derbyshire - Full Planning Permission and Listed Building Consent for the refurbishment of four sash windows, maiApproved
  6. HPK/2024/0496 - Land off Brown Edge Close, BuxtonApproved

More from High Peak Development Control Committee

All decisions
MeetingDecisionOutcome
10 Aug 2026 Minutes of the previous meetingThat the minutes of the meeting held on 13 July 2026 be approved as a correct record. Approved Open
10 Aug 2026 Update SheetThat the update sheet be noted. Noted Open
10 Aug 2026 Planning ApplicationsThat the report be noted. Noted Open
10 Aug 2026 HPK/2026/0134 - The Natural Baths, The Crescent, BuxtonThat the application be approved as set out in the report, subject to the amended condition from DCC Archaeology as s... Approved Open
10 Aug 2026 HPK/2026/0184 - Buxton Opera House, Water Street, Buxton, DerbyshireThat Listed Building Consent be granted as set out in the report: 2. That in the event of any changes being needed to... Approved Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies