CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
High Peak Borough Council
Development Control Committee, Monday 7 September 2020 at 1.30pm

HPK/2020/0117 - Land off Woolley Bridge, Hadfield, Glossop

Approved Planning 1 paper

Development Control Committee approved this item on Monday 7 September 2020. Below is the council's own wording, with the papers it was decided on.

Item20/110

Resolved

That approval be granted as set out in the report; 2. That in the event of any changes being needed to the wording of the Committee’s decision (such as to delete, vary or add conditions / informatives / planning obligations or reasons for approval / refusal) prior to the decision being issued, the Operations Manager – Development Services be delegated authority to do so in consultation with the Cahir of the Development Control Committee, provided that the changes do not exceed the substantive nature of the committee’s decision.
Word for word from the decision High Peak published for this meeting. Source: democracy.highpeak.gov.uk

Follow this further

Built from High Peak's papers

What the report saysPro

Report to Development Control Committee

HIGH PEAK BOROUGH COUNCIL DEVELOPMENT CONTROL COMMITTEE

Date 7th September 2020

Application HPK/2020/0117 No: Location Land off Woolley Bridge, Hadfield, Glossop Proposal Variation of Conditions 14, 15, 18 and 24 on Outline Approval HPK/2017/0198 Applicant [name removed], Richard Lloyd Developments Ltd, Upper East 1, 835 Wilmslow Road, Didsbury, Manchester, M20 5WD Agent [name removed], Emery Planning, Macclesfield Parish/ward Hadfield South Date registered 25/03/2020 If you have a question about this report please contact: Faye Plant -Email [email protected] Tel: 01538 395400 Ext: 4995; Mob: 077775695346 (Mon-weds)

REFERRAL

The application has been brought before the Development Control Committee as it involves a variation to a number of planning conditions imposed on a major development.

1. SUMMARY OF RECOMMENDATION

Approve, subject to the completion of a Deed of Variation to the completed Section 106 agreement and amended conditions

2. DESCRIPTION OF THE SITE AND ITS SURROUNDINGS

2.1The site is located on the eastern side of the A57 at Woolley Bridge; it is broadly rectangular in shape, tapering at the southern end and measures approx. 0.93ha. The land is undulating (with an east to west fall of around 12m) rough tree, scrub and grassland with a belt of mature trees long the eastern boundary adjacent to the public right of way and bridleway which forms part of the Broadbottom to Hadfield section of the Transpennine Trail.

2.2The site has a history which includes potential contamination from spoil tipping and previous petrol filling station which has been removed. The site is located to the east (rear) of a row of predominantly terraced residential properties which face onto the A57, with semi-detached and detached properties to the southern end of the site. Beyond the eastern boundary is a Council owned area of open space/woodland, beyond which is a residential estate. To the north of the site is theTravis Perkins building and beyond this Glossop Caravans Service Centre. To the south west of the site, adjacent to the site entrance is a vacant site with an application for 2 dwellings submitted by the applicant (HPK/2019/0232, currently pending). It is proposed that the site for 2 dwellings would be accessed via the estate road which forms part of this application.

2.3The site is located within the built up area boundary of Hadfield, on the edge of the ‘riverside meadows’ landscape character area and within 250m of a landfill buffer, as defined in the Local Plan. The site entrance to the A57 is located within floodzones 2 and 3.

2.4The site is also the subject of a current application (HPK/2020/0107) which seeks to agree the reserved matters on outline consent HPK/2017/0198 and also an application (DOC/2020/0025) which seeks agreement of conditions on the outline consent.

3. DESCRIPTION OF THE PROPOSAL

3.1This application seeks consent to vary four planning conditions imposed under the Outline consent HPK/2017/0198 and are summarised below;

 Condition 14 - relates to the timing of the submission of details of the design, maintenance and management of surface water drainage,  Condition 15 - relates to the destination of the surface water,  Condition 18 - requires a scheme for ecological enhancement, mitigation and compensation,  Condition 24 - requires the a contaimination and remediation scheme to be submitted.

3.2Condition 14 states:

14. No development shall take place until a detailed design and associated management and maintenance plan of surface water drainage for the site, in accordance with DEFRA Non-statutory technical standards for sustainable drainage systems (March 2015), has been submitted to and approved in writing by the Local Planning Authority. The approved drainage system shall be implemented in accordance with the approved detailed design prior to the approved development being first occupied.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
HPK/2020/0117: Land off Woolley Bridge, Hadfield, GlossopReport 256 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

13 of 22 attended
RM
Councillor Robert McKeownChair, present
DL
Councillor David LomaxVice-Chair, present
AB
Councillor Alan BarrowCommittee Member, present
LD
Councillor Lance DowsonCommittee Member, present
CF
Councillor Charlotte FarrellCommittee Member, present
IH
Councillor Ian HuddlestoneCommittee Member, present
AM
Councillor Anthony McKeownCommittee Member, present as substitute
GO
Councillor Graham OakleyCommittee Member, apologies, sent representative
JP
Councillor Jim PerkinsCommittee Member, present
PR
Councillor Peter RobertsCommittee Member, present
ET
Councillor Emily ThraneCommittee Member, present
JT
Councillor Jean ToddCommittee Member, present

All 22 on the meeting page

On this subject at High Peak

Search all
  1. HPK/2020/0117 - Land off Woolley Bridge, Hadfield, GlossopThis decision
  2. HPK/2026/0146 - Land at St Georges Rd, New Mills DerbyshireRefused
  3. HPK/2023/0328 - Portland Nursing Home, 8 Park Road, BuxtonApproved
  4. HPK/2025/0340 - Hargate Hill Equestrian Centre Hargate Hill, Glossop - Retrospective application for change of use of land for the siting of caravans for residential occupation with associated developmentRefused
  5. HPK/2025/0447 - Land at Crossings Road, Chapel-en-le-FrithApproved
  6. HPK/2024/0496 - Land off Brown Edge Close, BuxtonApproved

More from High Peak Development Control Committee

All decisions
MeetingDecisionOutcome
10 Aug 2026 Minutes of the previous meetingThat the minutes of the meeting held on 13 July 2026 be approved as a correct record. Approved Open
10 Aug 2026 Update SheetThat the update sheet be noted. Noted Open
10 Aug 2026 Planning ApplicationsThat the report be noted. Noted Open
10 Aug 2026 HPK/2026/0134 - The Natural Baths, The Crescent, BuxtonThat the application be approved as set out in the report, subject to the amended condition from DCC Archaeology as s... Approved Open
10 Aug 2026 HPK/2026/0184 - Buxton Opera House, Water Street, Buxton, DerbyshireThat Listed Building Consent be granted as set out in the report: 2. That in the event of any changes being needed to... Approved Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies