That the application be APPROVED as set out in the report, subject to: a. an additional condition to ensure that any demolished materials are recycled as far as possible b. the amendment of condition 7, ‘Scheme of refuse bins’ to ensure that the scheme includes recycling bins 2. That in the event of any changes being needed to the wording of the Committee’s decision (such as to delete, vary or add conditions / informatives / planning obligations for reason for approval / refusal) prior to the decision being issued, the Head of Development Services be delegated authority to do so in consultation with the Chair of the Committee, provided that the changes do not exceed the substantive nature of the Committee’s decision.
Word for word from the decision High Peak published for this meeting.Source: democracy.highpeak.gov.uk
HIGH PEAK BOROUGH COUNCIL DEVELOPMENT CONTROL COMMITTEE
Date 3rd October 2022
Application No: HPK/2022/0250 Location Buxton Football Club, Silverlands, Buxton Proposal Extension to form sponsors and supporters lounges and extend the size of shop and canteen following demolition of portable cabins, canteen and part directors lounge. Applicant [name removed] Lee Architects Ltd Parish/ward Buxton Central Date registered 26th May 2022 If you have a question about this report please contact: James Stannard, Tel. 01298 28400 extension 4298, [email protected]
1. SUMMARY OF RECOMMENDATION
Approve, subject to conditions
1. REASON FOR COMMITTEE DETERMINATION
1.1This application has been brought before the Development Control Committee owing to previous applications for major and minor development being considered and determined by the Committee
2. DESCRIPTION OF THE SITE AND ITS SURROUNDINGS
2.1The application site is located on Sivlerlands and is occupied by Buxton Football Club. Following a very successful season, the club has recently gained promotion to the National League North (the 6th Tier in the English football pyramid).
2.2The site contains a combination of single storey structures of varying architectural styles and visual appearance including a portacabin which align the public highway immediately to the north, with the playing pitch lying to the south and the existing stand to the east.
2.3The buildings currently serve small scale catering facilities, a Directors Lounge, and a small shop.
2.4The wider site comprises an artificial grass playing pitch measuring 104m x 74m, associated stands/terraces and ancillary structures. These are made up of two stands on the northern and western sides of the pitch; two terraces alongside the southern and eastern sides of the pitch and a clubhouse/bar facility; toilet block, and educational buildings.
1 2.5 Following the granting of planning permission under HPK/2017/0260, the new 4G sports pitch is rented out to community groups and members of the public on non-match days.
2.6The site is bounded to the north by the public highway and Police headquarters beyond. To the south of the site sit two blocks of residential development. Terraced properties off Mill Court are positioned on the western side of the southern boundary whilst newer development off Woodside is located further east. The Ashbourne quarry railway line lies to the west whilst allotment gardens are situated beyond the eastern boundary.
3. DESCRIPTION OF THE PROPOSAL
3.1The application seeks full planning permission to demolish of the existing portable cabin, catering facilities and part of the Directors Lounge, and the construction of a new extension, which would serve as a new shop, canteen, WC facilities, Directors box, Sponsors and Supporters Lounge.
3.2The resultant building would be sited on a similar footprint as the existing buildings, immediately adjacent to the entrance turnstiles. The public highway which sits on the opposite side of the boundary wall to the north, with the front elevation facing onto the playing pitch.
3.3The plans show that that a new entrance to this building would be accessible from the public highway, with the ground floor containing a Canteen; new shop; toilets; and Directors Box. The extension would see a first floor added, accessed via a flight of internal stairs, which contains 2no. Supporters Lounges, the larger of the two served by a balcony overlooking the pitch, and supported by a drinks bar, and a Players Lounge.
3.4The Elevation Plans show that the new resultant building would reach a maximum height of 6.92m, sitting below the height of the existing adjacent stand to the east which stands at a height of 8.0m.
3.5The external walls of the building both fronting the public highway (Silverlands) and facing the pitch are shown to be finished in a split face stone to match the existing boundary wall with a dark grey profiled metal sheeting sloping towards the pitch away from the highway.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.