That the application be approved as set out in the report, subject to: a. The additional condition as set out in the update sheet 2. That in the event of any changes being needed to the wording of the Committee’s decision (such as to delete, vary or add conditions/ informatives /planning obligations or reasons for approval / refusal) prior to the decision being issued, the Head of Development Services be delegated authority to do so in consultation with the Chair of the Committee, provided that the changes do not exceed the succeed the substantive nature of the committee’s decision.
Word for word from the decision High Peak published for this meeting.Source: democracy.highpeak.gov.uk
HIGH PEAK BOROUGH COUNCIL DEVELOPMENT CONTROL COMMITTEE
Date 6th March 2023
Application No: HPK/2022/0557 Location Buxton Football Club, Silverlands, Buxton Proposal Extension of existing clubhouse at first floor level and part ground floor to form a gym and changing room facilities Applicant [name removed] Lee Architects Ltd Parish/ward Buxton Central Date registered 15th Dec 2022 If you have a question about this report please contact: James Stannard, Tel. 01298 28400 extension 4298, [email protected]
1. SUMMARY OF RECOMMENDATION
Approve with Conditions
1. REASON FOR COMMITTEE DETERMINATION
1.1This application has been brought before the Development Control Committee owing to previous applications for major and minor development being considered and determined by the Committee
2. DESCRIPTION OF THE SITE AND ITS SURROUNDINGS
2.1The application relates to a rectangular parcel of land within the confines of Silverlands, occupied by Buxton Football Club; which, following a very successful season, has recently gained promotion to the National League North (the 6th Tier in the English football pyramid).
2.2Due to the competitive nature of this league and that Buxton are one of the smaller teams within it, with regards to attendances and budgets, the club are seeking opportunities to secure alternative revenue streams and ultimately the medium to long term sustainability of the club.
2.3The area of land subject to this latest application relates to a small area within the Silverlands football ground complex that is home to a single storey building that serves the clubhouse with a bar and associated lounges with seated tables and toilet facilities.
2.4The wider site comprises a grass playing pitch measuring 104m x 74m, associated stands/terraces and ancillary structures. These are made up of two stands on the northern and western sides of the pitch; two terrace alongside the southern and eastern sides of the pitch; and
1 portacabins and single storey structures, those of which that sit adjacent to the main stand being subject of a planning application for a replacement two storey building housing improved commercial and corporate facilities that was granted permission in 4th October 2022, after being considered by Development Control Committee under HPK/2022/0250.
2.5Following the granting of planning permission under HPK/2017/0260, the new 4G sports pitch is rented out to community groups and members of the public on non-match days.
2.6The site is bounded to the north by the public highway and Police headquarters beyond. To the south of the site sit two blocks of residential development. Terraced properties off Mill Court are positioned on the western side of the southern boundary whilst newer development off Woodside is located further east. The Ashbourne quarry railway line lies to the west whilst allotment gardens are situated beyond the eastern boundary.
3. DESCRIPTION OF THE PROPOSAL
3.1The application seeks full planning permission to erect a first floor extension above the existing single storey clubhouse, largely following the existing footprint, to serve as a first floor gym with associated male and female changing room facilities.
3.2Further to Officers request for clarification on the proposed use, the applicant has confirmed that the gym would be primarily used by players and students studying at existing educational facilities on site, and would not be operational as a typical commercial gym that has a subscription model.
3.3The resultant two storey structure is shown to reach a total height of 6.7m, standing adjacent to the west (spectator) stand behind one of the goals which reaches a height of some 5.1m.
3.4The principal elevation facing internally towards the pitch is shown (as with all other elevations) to be constructed in a split face stone, with ground floor and first floor glazing, supplemented by a dark grey metal trim, with a mono-pitched roof sloping westwards towards the boundary with the railway finished in grey roof sheeting.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.